ML18113A708

From kanterella
Jump to navigation Jump to search
Forwards LER #78-034/01X-1
Date released: 12/10/2018 Download: ML18113A708


LER #78-034/01X-1 on 781101:noted That 17 Spare Process Piping Penetrations on Unit #1 & 23 on Unit #2 Were Not Capped in Auxiliary Bldg.Caused by Failure to Properly Complete Capping at End of Constr
ML18113A709
Person / Time
Site: Surry Dominion icon.png
Issue date: 12/13/1978
From: Baucom T
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML18113A709 (3)
Forwards LER #78-034/01X-1
ML18113A707
Person / Time
Site: Surry Dominion icon.png
Issue date: 12/13/1978
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18113A707 (1)