Correction of Amendment No. 248 Quality Reclassification of Components in the Reactor Water Cleanup System (CAC No. MF8318; EPID L-2016-LLA-0008)
ML18109A215
Person / Time
Site: Columbia 
Issue date: 04/27/2018
From: Klos L
Plant Licensing Branch IV
To: Sawatzke B
Energy Northwest
Klos L, 301-415-5136
References
CAC MF8318, EPID L-2016-LLA-0008
Download: ML18109A215 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION Mr. Bradley J. Sawatzke Acting Chief Executive Officer Energy Northwest 76 North Power Plant Loop P.O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968 WASHINGTON, D.C. 20555-0001 April 27, 2018

SUBJECT:

COLUMBIA GENERATING STATION-CORRECTION OF AMENDMENT NO. 248 RE: QUALITY RECLASSIFICATION OF COMPONENTS IN THE REACTOR WATER CLEANUP SYSTEM (CAC NO. MF8318; EPID L-2016-LLA-0008)

Dear Mr. Sawatzke:

By letter dated April 17, 2018, the U.S Nuclear Regulatory Commission (NRC) issued Amendment No. 248 {Agencywide Documents Access and Management System (ADAMS)

Accession No. ML18075A351) to Renewed Facility Operating License (RFOL) No. NPF-21 for the Columbia Generating Station. The amendment consists of changes to the Final Safety Analysis Report in response to your application dated August 30, 2016 (ADAMS Accession No. ML16245A273), as supplemented by letter dated November 20, 2017 (ADAMS Accession No. ML17325B664 ).

Amendment No. 248 is effective as of April 17, 2018, and is to be implemented in 120 days from the date of the issuance of the license amendment. In the application dated August 30, 2016, the licensee requested an implementation period of 120 days from the date of issuance of the license amendment. However, in the supplemental letter dated November 20, 2017, the licensee requested a new implementation period that ends upon restart from Refueling Outage 24 (spring 2019) that will allow testing of Reactor Water Cleanup System valves. It was identified by your staff to the NRC staff that page 2 of the amendment authorization letter for RFOL No. NPF-21, dated April 17, 2018, stated an incorrect implementation period of 120 days.

The NRC staff concludes that the error was inadvertently introduced during the preparation of the license amendment. To correct the error, a revised copy of page 2 of the amendment authorization letter for RFOL NPF-21 is enclosed. Please replace page 2 of the amendment authorization letter for RFOL NPF-21 that was issued by the letter dated April 17, 2018, with the enclosed page.

The Notice of Issuance has been corrected to reflect the corrected implementation period and will be included in the Commission's biweekly Federal Register notice.

These administrative errors do not affect the NRC staff's overall conclusions associated with the approval of Amendment No. 248. The changes are within the scope of the application as originally noticed in the Federal Register on December 6, 2016 (81 FR 87968).

If you have any questions regarding this matter, I may be reached at (301) 415-5136 or via e-mail at John.Klos@nrc.gov.

Docket No. 50-397

Enclosure:

Revised Page 2 of the Amendment Authorization Letter for NPF-21 cc: Listserv Sinrly, l L. Joh los, Pr 1ect Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

ENCLOSURE REVISED PAGE 2 OF AUTHORIZATION LETTER FOR AMENDMENT NO. 248 TO FACILITY OPERATING LICENSE NO. NPF-21 ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397

2.

Accordingly, by Amendment No. 248, Renewed Facility Operating License No. NPF-21 is hereby amended to authorize revision to the Columbia Generating Station Final Safety Analysis Report as set forth in the licensee's application dated August 30, 2016, as supplemented by letter dated November 20, 2017, and evaluated in the NRC staffs evaluation enclosed with this amendment.

3.

The license amendment is effective as of its date of issuance and shall be implemented from the date of issuance until restart after Refueling Outage 24 (spring 2019).

Date of Issuance: April 17, 2018 FOR THE NUCLEAR REGULATORY COMMISSION Robert J. Pascarelli, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

ML18109A215 GCurran, NRR SJones, NRR MFarnan, NRR KHsu, NRR DGarmon-Candelaria, NRR OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME JKlos PBlechman RPascarelli JKlos DATE 04/24/18 04/24/18 04/26/18 04/27/18