ML18108A132

From kanterella
Jump to navigation Jump to search
ISFSI - Transmittal of Revised Emergency Plan Implementing Procedure (EPIP);SO123-VIII-ERO-6, Dose Assessments, Revision 2
ML18108A132
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/16/2018
From: Bates A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
SO123-VIII-ERO-6, Rev. 2
Download: ML18108A132 (2)


Text

SOUIHERN CALIFORNIA Al Bates EDISON~ Manager, Regulatory Affairs An EDISON INTERNATJONALi> Company April 16, 2018 10 CFR 50.54(q)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-206, 50-361, 50-362, and 72-41 Revised Emergency Plan Implementing Procedure {EPIP)

San Onofre Nuclear Generating Station {SONGS) Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation

Dear Sir or Madam:

Pursuant to 10 CFR 50.54(q)(5), Attachment 1 of this letter provides a copy of the following revised Emergency Plan document:

Procedure Rev. Effective Date S0123-VIII-ER0-6, Dose Assessments 2 March 15, 2018 As specified in 10 CFR 50.54( q)(5), Attachment 2 provides a report and analysis summary for the EPIP changes. These changes do not reduce the effectiveness of the Emergency Plan or the EPIPs.

There are no commitments contained in this letter or its attachments.

P. 0. Box 128 San Clemente, CA 92672

Document Control Desk If you have any questions, please contact me at (949) 368-6945.

Sincerely, 0-l Attachments: 1. Revised Emergency Plan Implementing Procedure

2. Report and Analysis Summary cc: Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 1)

K. M. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 W. C. Allen, NRC Project Manager, SONGS ISFSI