ML18107A474

From kanterella
Jump to navigation Jump to search
Notice of Violation from DOL Case 98-ERA-39,dtd 990314. Violation Noted:Licensee Discriminated Against Employee for Engaging in Protected Activities
ML18107A474
Person / Time
Site: Salem  
Issue date: 07/28/1999
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18107A473 List:
References
EA-99-055, NUDOCS 9908050004
Download: ML18107A474 (3)


Text

  • '

ENCLOSURE NOTICE OF VIOLATION Public Service Electric and Gas Company Salem Units 1 and 2 Docket Nos. 50-272 and 50-311 License Nos. DPR-70 and DPR-85 EA 99:-055 Based on a decision by a U.S. Department of Labor Administrative Law Judge dated March 4, 1999 (DOL Case 98-ERA-39), a violation of NRC requirements was identified.. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is set forth below:

1 O CFR 50. 7 prohibits, in part, discrimination by a Commission licensee against an employee for engaging in certain protected activities. Discrimination includes discharge or other actions relating to the compensation, terms, conditions, and privileges of employment. The activities which are protected include, but are not limited to, reporting of safety concerns by an employee to his employer.

Contrary to the above, on April 8, 1998, the licensee discriminated against an employee for engaging in protected activities. Specifically, a nuclear mechanical technician received a negative performance *appraisal in retaliation for raising safety concerns regarding the repair of a safety-related valve at Salem Unit 1. (01014)

This is a Severity Level IV violation (Supplement VII).

Pursuant to the provisions of 10 CFR 2.201, Public Service Electric & Gas Company (Licensee) is hereby required to submit a written statement or explanation to the U.S.

Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region I, and a copy to the NRC Resident

. Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation or severity level, (2) the corrective steps that have been taken and the results achieved; (3) the corrective steps that will* be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response. If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued as to why the* license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.

If you contest this enforcement action, you should also provide a copy of your response to the Director, Office.of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

9908050004 990728

~DR ADOCK 05000272 PDR

Enclosure 2

Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. If personal privacy or proprietary information is necessary to provide. an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of. withholding.(e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the informati~n required by 10 CFR 2. 790(b) to support a request for withholding confidential commercial or financial information). If safeguards informati.on is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

In accordance with 10 CFR 19. 11, you may be required to post this Notice within two working days.

Dated this 28th day of July 1999

SYNOPSIS 1Jtls investigation was initiated by the U.S. Nuclear Regulatory Commission, Office of Investigations (OI}, Region I (RI) Field Office, on May 8, 1998, to detennine whether a Nuclear

  • Mechanic Technician (NMI), Salem Generating Station, Unit 1, Public S~rvice Eleetric & Gas Company, was discriminated against for raising concerns regarding management practices and policies.. The NMT alleged $8.t.PSE&G suspended his onsite access, assigned him to work offsite, sent him for a psychological examination, and gave him a negative performan6e evaluation.

After a preliminary review of this matter and coordination with the Regional Administrator, it has been determin~ that, due to *or:RI pursumg investigations with higher priorities, this matter is *being closed:

ENCLOSURE 2