ML18107A331

From kanterella
Jump to navigation Jump to search
Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves
Date released: 11/29/2018 Download: ML18107A331


Rev 0 to 108-193-TW4, Evaluation of MOVs PR6 & PR7 for Pressure Locking During Gradual Depressurization Event.
ML18107A335
Person / Time
Site: Salem PSEG icon.png
Issue date: 01/27/1997
From: Damerell P, Walker T
MPR ASSOCIATES, INC.
To:
References
Download: ML18107A335 (11)
Rev 0 to 108-173-EJM-01, Opening Force Required to Overcome Pressure Locking of Pressurizer Block Valves 1PR6,1PR7,2PR6 & 2PR7.
ML18107A332
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/29/1996
From: Ed Miller
MPR ASSOCIATES, INC.
To:
References
Download: ML18107A332 (28)
Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves
ML18107A330
Person / Time
Site: Salem PSEG icon.png
Issue date: 05/24/1999
From: Eric Simpson
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18107A330 (3)