Forwards Exemption from Certain Requirements of 10CFR50.71 Re Submission of Revs to UFSAR for Plant,Units 1 & 2 & SE Accepting That Rev
ML18106B163
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/07/1999
From: Adensam E
NRC (Affiliation Not Assigned)
To: Keiser H
Public Service Enterprise Group
Shared Package
ML18106B164 List:
References
TAC-MA4552, TAC-MA4553, NUDOCS 9904160249
Download: ML18106B163 (3)


Text

.

.. ~.. ~:..

Mr. Harold W. Keiser Chief Nuclear Officer & President-Nuclear Bu.siness Unit Public Service Electric & Gas Company*

Post Office Box 236 Hancocks Bridge, NJ 08038 Apri 1 7, 1999

SUBJECT:

ISSUANCE OF EXEMPTION TO 10 CFR 50.71(e)(4) FOR THE SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1AND2 (TAC NOS. MA4552 AND MA4553)

Dear Mr. Keiser:

The Commission has issued the enclosed exemption from certain requirements of Section 50.71(e)(4) of Title 10 of the Code of Federal Regulations (10 CFR 50.71(e)(4)) regarding submission of revisions to the updated final safety analysis report (UFSAR) for the Salem Nuclear Generating Station, Unit Nos. 1 and 2. lri its letter dated December 2, 1998, the Public Service Electric and Gas Company (PSE&G) requested an exemption from the requirement that revisions to the UFSAR must be filed annually or 6 months after each refueling outage provided the interval between successive updates does not exceed 24 months. Specifically, this exemption allows PSE&G to submit the updates of the UFSAR, which is common to both units, within 6 months after the Salem Unit 1 refueling outages, but not to exceed 24 months from the last update rather than annually or within*6 months after each refueling outage for both units.

A copy of the Exemption and the supporting safety evaluation is enclosed. The Exemption is being forwarded to the Office of the Federal Register for publication.

Sincerely, ORIGINAL SIGNED BY:

(-- --99o4i6o249-99o4o7 - -----------1 1

PDR ADOCK 05000272 Elinor G. Adensam, Director Project Directorate 1-2 P

PDR Docket Nos. 50-272 and 50-311

Enclosures:

1. Exemption
2. Safety Evaluation Division of Licensing Project Management Office of Nuclear Reactor Regulation cc w/encls: See next page i r:: *1,..\\ 3 ?!.:'*:

DISTRIBUTION:

1 rJ,J 'J J

~~Docket File _

  • TClark PUBLIC MBoyle PDl-2 Reading EAdensam JZwolinski RNorsworth OFFICE PDl-2/PM PDl-2/LA OGG*

NAME Weisman OFFICIAL RECORD COPY DOCUMENT NAME: SA4552.EXE

UNITED STATES NUCLEAR REGULATORY COMMISSION Mr. Harold W. Keiser Chief Nuclear Officer & President-Nuclear Business Unit Public Service Electric & Gas Company Post Office Box 236 Hancocks Bridge, NJ 08038 WASHINGTON, D.C. 20555-0001

SUBJECT:

ISSUANCE OF EXEMPTION TO 10 CFR 50.71(e)(4) FOR THE SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1AND2 (TAC NOS. MA4552 AND MA4553)

Dear Mr. Keiser:

The Commission has issued the enclosed exemption from certain requirements of Section 50.71(e)(4) of Title 10 of the Code of Federal Regulations (10 CFR 50.71(e)(4)) regarding submission of revisions to the updated final safety analysis report (UFSAR) for the Salem Nuclear Generating Station, Unit Nos. 1 and 2. In its letter dated December 2, 1998, the Public Service Electric and Gas Company (PSE&G) requested an exemption from the requirement that revisions to the UFSAR must be filed annually or 6 months after each refueling outage provided the interval between successive updates does not exceed 24 months. Specifically, this exemption allows PSE&G to submit the updates of the UFSAR, which is common to both units, within 6 months after the Salem Unit 1 refueling outages, but not to exceed 24 months from the last update rather than annually or within 6 months after each refueling outage for both units.

A copy of the Exemption and the supporting safety evaluation is enclosed. The Exemption is being forwarded to the Office of the Federal Register for publication.

Docket Nos. 50-272 and 50-311

Enclosures:

1. Exemption
2. Safety Evaluation cc w/encls: See next page Sincerely, Elinor G. Adensam, Director Project Directorate 1-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation

Mr. Harold W. Keiser Public Service Electric & Gas Company cc:

Jeffrie J. Keenan, Esquire Nuclear Business Unit-N21 P.O. Box236 Hancocks Bridge, NJ 08038 General Manager - Salem Operations Salem Nuclear Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. Louis Storz Sr. Vice President - Nuclear Operations Nuclear Department P.O. Box236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Salem Nuclear Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs NJ Department of Environmental Protection and Energy CN 415 Trenton, NJ 08625-0415 Maryland Office of People's Counsel 6 St. Paul Street, 21st Floor Suite 2102 Baltimore, MD 21202 Ms. R. A. Kankus Joint Owner Affairs PECO Energy Company 965 Chesterbrook Blvd., 63C-5 Wayne, PA 19087 Mr. Elbert Simpson Senior Vice President-Nuclear Engineering Nuclear Department P.O. Box236 Hancocks Bridge, NJ 08038 Salem Nuclear Generating Station, Units 1 and 2 Richard Hartung Electric Service Evaluation Board of Regulatory Commissioners 2 Gateway Center, Tenth Floor Newark, NJ 07102 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Director - Licensing Regulation & Fuels Nuclear Busienss Unit - N21 P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Manager - Joint Generation Atlantic Energy 6801 Black Horse Pike Egg Harbor Twp., NJ 08234-4130 Carl D. Schaefer External Operations - Nuclear Delmarva Power & Light Company P.O. Box231 Wilmington, DE 19899 Public Service Commission of Maryland Engineering Division Chief Engineer