Levy, Units 1 and 2, William States Lee, Units 1 and 2, Shearon Harris, Units 2 and 3, Transmittal of 10 CFR 50.46 Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors, Annual Report
ML18103A025
Person / Time
Site: Levy County, 05200022, 05200023, Lee  Duke Energy icon.png
Issue date: 04/10/2018
From: Donahue J
Duke Energy Carolinas, Duke Energy Progress
To:
Document Control Desk, Office of New Reactors
References
NPD-NRC-2018-005
Download: ML18103A025 (3)


Text

/

r1(~DUKE JOSEPH W. DONAHUE

~JENERGY<< Vire IPcesidenl Nuclear Engineering 516 S. Cburcli Street, EC-07H Charlotte,, NC 18101 980-373-1758 Joseph.Donah11e@ooke-ene;gy.com Serial: NPD-NRC-2018-005 10 CFR 50.46 April 10, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Levy Nuclear Plant, Units 1 and 2 Combined License Nos. NPF-99 and NPF-100 Docket Nos.52-029 and 52-030 William States Lee Ill Nuclear Station, Units 1 and 2 Combined License Nos. NPF-101 and NPF-102 Docket Nos.52-018 and 52-019 Shearon Harris Nuclear Power Plant, Units 2 and 3 Docket Nos.52-022 and 52-023

SUBJECT:

10 CFR 50.46 ANNUAL REPORT The purpose of this letter is to provide a required report in accordance with 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors," for Levy Nuclear Plant (LNP) Units 1 and 2, William States Lee Ill Nuclear Station (WLS) Units 1 and 2, and Shearon Harris Nuclear Power Plant (HAR), Units 2 and 3.

A design certification holder is required to report to the NRC in accordance with 10 CFR 50.46(a)(3). This same regulation requires a similar report from any combined license (COL) holder and COL applicant. The Duke Energy COLs for LNP Units 1 and 2 and WLS Units 1 and 2, as well as the COL Application for HAR Units 2 and 3, incorporate by reference the AP1000 design certification document and thus, also utilize the peak cladding temperature calculations.

performed by Westinghouse Electric Company (WEC). As such, the WEC report, provided in the Enclosure, is applicable to LNP Units 1 and 2, WLS Units 1 and 2, and HAR Units 2 and 3.

This submittal contains no regulatory commitments.

If you have any questions concerning this letter, or require additional information, please contact me or Erik Wagner at (704) 382-3949. -p O Le ~

Sincerely, l)D qlf

~ \ . : ) ~

l)b q~

Joseph W. Donahue Vice President - Nuclear Engineering bo <2 c_-f-,

r NPD-NRC-2018-005 Page 2 of 2 cc (with enclosure):

Mr. Brian Hughes, U.S. NRC Project Manager U.S. NRC Region II, Regional Administrator

Enclosure:

Letter from Zachary S. Harper, Westinghouse Electric Company (WEC), to the U. S. Nuclear Regulatory Commission, 10 CFR 50.46 Annual Report for the AP1000 Plant Design, Letter No. DCP_NRC_003328, dated March 23, 2018

NPD-NRC-2018-005 Enclosure Letter from Zachary S. Harper, Westinghouse Electric Company to the U. S. Nuclear Regulatory Commission 10 CFR 50.46 Annual Report for the AP1000 Plant Design Letter No. DCP_NRC_003328, dated March 23, 2018 (Number of pages including cover page: 32)