NRC 2018-0001, Transmittal of Construction Truss License Amendment Request Document

From kanterella
(Redirected from ML18102B173)
Jump to navigation Jump to search

Transmittal of Construction Truss License Amendment Request Document
ML18102B173
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/12/2018
From: Craven R
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18206A872 List:
References
EPID L-2017-LLA-0209, NRC 2018-0001
Download: ML18102B173 (2)


Text

NEXTera ENERGY ~

POINT BEACH April 12, 2018 NRC 2018-0001 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Docket 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 NextEra Energy Point Beach. LLC. Construction Truss License Amendment Request Document Transmittal

Reference:

1. NextEra Energy Point Beach, LLC, License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances, dated March 31, 2017(ML17090A511)
2. NRC Letter, Point Beach Nuclear Plant, Units 1 and 2 - Request for Additional Information for Point Beach Nuclear Plant, Units 1 and 2, Regarding License Amendment Request to Resolve Nonconformances Relating to Containment Dome Truss (EPID L-2017-LLA-0209), dated January 31, 2018 (ML18025C043)

By letter dated March 31, 2017 (Reference 1), NextEra Energy Point Beach (NextEra) submitted License Amendment Request (LAR) 278 to resolve legacy design code nonconformances associated with the Point Beach Units 1 and 2 containment dome construction trusses. By letter dated January 31, 2018 (Reference 2), NRC requested additional information related to LAR 278. In response to Request 15.a in Reference 2, NextEra is providing a copy of the current revision of the Target Assessment associated with LAR 278. The Target Assessment is attached to this letter as Enclosure 1.

NextEra requests that Enclosure 1, which contains se.curity-related sensitive information, be withheld from public disclosure in accordance with 10 CFR 2.390.

This letter contains no new regulatory commitments.

If you have any questions please contact Mr. Eric Schultz, Licensing Manager, at (920) 755-7854.

Enclosure 1 contains security-related information to be withheld from public disclosure under 10 CFR 2.390. When separated from the security-related information, this document is decontrolled .

NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 Enclosure 1 contains security-related information to be withheld from public disclosure under 10 CFR 2.390. When separated from the security-related information, this document is decontrolled .

Sincerely, NextEra Energy Point Beach , LLC Robert Craven Plant General Manager cc: Director, Office of Nuclear Reactor Regulation Administrator, Region Ill, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Project Manager, Point Beach Nuclear Plant, USNRC

Enclosure:

1. PBN-BFJR-17-020, Point Beach Construction Truss Target Assessment, Revision 1 Enclosure 1 contains security-related information to be withheld from public disclosure under 10 CFR 2.390. When separated from the security-related information, this document is decontrolled.