Text

1 NRR-DMPSPEm Resource From:

Goetz, Sujata Sent:

Thursday, April 12, 2018 12:02 PM To:

Jason R Haas

Subject:

Fermi 2 - Acceptance of Requested Licensing Action to Adopt TSTF-535 (EPID L-2018-LLA-0070)

Dear Mr. Haas,

By letter dated March 14, 2018, (Agencywide Documents and Access Management System (ADAMS)

Accession No. ML18073A137), DTE submitted a license amendment for Fermi 2. The proposed amendment would revise the technical specifications definition of Shutdown Margin (SDM) to require calculation of the SDM at a reactor moderator temperature of 68° Fahrenheit or a higher temperature that represents the most reactive state throughout the operating cycle. This change is needed to address new boiling water reactor fuel designs which maybe more reactive at shutdown temperatures above 68° Fahrenheit.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> to complete. The NRC staff expects to complete this review by August 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact the Fermi 2 Project Manager, Sujata Goetz, at (301) 415-8004.

Sujata Goetz Project Manager, Fermi, Unit 2 Nuclear Regulatory Commission 11555 Rockville Pike Office of the Nuclear Reactor Regulation NRC/NRR/DORL/LPL3

2 Office O8F2 Mailroom O8-B1A Rockville, MD 20852-2738 Washington, DC 20555-0001 (o) 301.415.8004 (f) 301.415.3313

Hearing Identifier:

NRR_DMPS Email Number:

292 Mail Envelope Properties (Sujata.Goetz@nrc.gov20180412120200)

Subject:

Fermi 2 - Acceptance of Requested Licensing Action to Adopt TSTF-535 (EPID L-2018-LLA-0070)

Sent Date:

4/12/2018 12:02:24 PM Received Date:

4/12/2018 12:02:00 PM From:

Goetz, Sujata Created By:

Sujata.Goetz@nrc.gov Recipients:

"Jason R Haas" <haasj@dteenergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3204 4/12/2018 12:02:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: