Forwards Insp Repts 50-272/96-18 & 50-311/96-18 on 961215-970125 & NOV
ML18102A869
Person / Time
Site: Salem  PSEG icon.png
Issue date: 02/19/1997
From: Larry Nicholson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
Shared Package
ML18102A870 List:
References
NUDOCS 9702250009
Download: ML18102A869 (4)


See also: IR 05000272/1996018

Text

..

Mr. Leon R. Eliason

Chief Nuclear Officer and President

  • Nuclear Business Unit

February 19; 1997

Public Service Electric and Gas Company

Post Office Box 236

Hancocks Bridge, NJ 08038

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-272/96-18, 50-311/96-18

NOTICE OF VIOLATION *

Dear Mr. Eliason:

    • On January 25, 1 ~97, the NRC completed .an inspection at your Salem 1 & 2 reactor

facilities. The enclosed report presents the results of that inspection.

During* the 6-week period covered by this inspection period, your conduct of activities at

the Salem facilities was generally chara:lcterized by safety-conscious operations, sound

engineering and maintenance practices, and careful radiological work controls .. We noted,

in particular, the generally good operator performance during four major evolutions as

operators began to transition the plant from outage activities to power operation .

. Significant improvement was noted in the performance of the Quality Assurance

Department. We view this improvement as especially significant when compared to the

ineffectiveness of that organization prior to rriid-1995. *Your efforts to improve the

Emergency Preparedness Program were found to* be suffici~nt to support Salem restart.

We are concerned, however, about three violations Qf NRC requirements tnat we

identified. We are particulariy concerned ab~ut the*loss of containment closure during

Salem Unit 2 refueling stemming.from i!'leffective work control. Although no safety

consequence resulted fro*m the loss-of containment c'losure, the problem accentuates the

potential impact of ineffective *work control on safe plant operation. Since you have not

yet completed implementation of y~ur planned corrective action for past work control

deficiencies, and in light of the problem documented in this report, we remain concerned

about your ability to control work to insure safe plant operation ..

Although we noted several examples of improved engineering performance, we also noted

two violations involving the Nuclear Engineering Design Department. Although we

consider engineering good overall, we conclude that your efforts to continua improvement

important for long term engineering. success.

These violations are cited in the enclosed Notice of Violation, and the circumstances

surrounding the violations are describt.d in detail in the* enclosed report. Please note that

you are*required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

  • to determine whether further enforcement action is necess~ry to ensure compliance with

regulatory requirements.

0:?7

9702250009 970219

PDR

ADOCK 05000272

G

PDR

'i

Mr. Leon R. Eliason

2

In accordance *with* 10 CFR 2~ 790 of the NRC's "Rules of Practice," a copy of this letter

and its enclosures. will be placed in the NRC Public Document Room (PDR).

Docket Nos.: 50.:.272, 50-311

License Nos: DPR-70, DPR-75

Enclosures:

Notice of Violation

Sincerely,

ORIGINAL SIGNED BY:

Larry E. Nicholson, Chief

Projects Branch 3

Division of Reactor Projects

Inspection Report 50-272/96-18, 50~311/96-18

. Mr. Leon R. Eliason

3

cc w/encl:

L. Storz, Senior Vice President - Nuclear Operations

E .. Simpson, Senior Vice President - Nwclear Engineering

E. Salowitz, Director - Nuclear Business Support

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

D. Garchow, General Manager - Salem Operations

J. Benjamin, Director - Quality Assurance & Nuclear Safety Review

D. Powell, Manager; Licensing and Regulation

R. Kankus, Joint Owner Affairs

A. Tapert, Program Adminis~rator

R. E. Selover, Esquire

M. Wetterhahn, Esquire

P. MacFarland Goelz, Manager, Joint Generation

Atlantic Electric

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

Public Service Commission of Maryland

State of New Jersey

State of Delaware

.

'

Mr. Leon R. Eliason

Distribution w/enct:

Region I Docket Room (with concurrences)

Kay Gallagher, DRP

Nuclear Safety Information* Center (NSIC)

4

L. Cunningham, NRR (Security/Safeguards IRS)

'D. Barss, NRR (Emergency Plan IRs)

L. Nicholson, DRP

S. Barber, DRP

G. Kelly, DRS

N. Della Greca, DRS

D. Screnci, PAO (1)

NRC Resident Inspector

PUBLIC

Distribution w/encl: (Via E-Mail)

L. Olshan, NRR

W. Dean, OEDO .

J .. Stolz, PDl-2, NRR

M. Callahan, OCA

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

D. Taylor, NRR.

\\branch3\\9618.sal
  • To receive a copy of this doc

en,~. indicate in the box: "C" =

py without attachment/enct'osure "E" = Copy with attachment/enclosure "N" '= No copy

OFFICE

NAME

DATE

OFFICIAL RECORD COPY

fEv/