ML18102A752
| ML18102A752 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 01/10/1997 |
| From: | Ruland W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Eliason L Public Service Enterprise Group |
| Shared Package | |
| ML18102A753 | List: |
| References | |
| NUDOCS 9701160206 | |
| Download: ML18102A752 (3) | |
See also: IR 05000272/1996016
Text
.*
....
,,. .
I.~
January 10, 1997
Mr. Leon R. Eliason
Chief Nuclear Officer & President
Nuclear Business Unit
Public Service Electric and Gas Company
P. 0. Box 236
Hancocks Bridge, New Jersey 08038
SUBJECT: COMBINED INSPECTION REPORT NOS. 50-272/96-16 AND 50-311 /96-16
Dear Mr. Eliason:
On November 15, 1996, the NRC completed a safety inspection of your Salem 1 and 2
nuclear facility. The enclosed report presents the results of that inspection.
During the period covered by this inspection, your conduct of activities at the Salem
facilities was generally characterized by sound engineering practices. Your walkdown
efforts contributed significantly to baselining the as-built configuration of the plant. We
further observed that you made significant progress in upgrading and improving
engineering programs and processes. Root cause analyses were being effectively
performed and a process to ensure proper identification and resolution of emerging
technical issues had been successfully implemented.
One concern was identified regarding timely resolution of NRC restart action plan issues.
For instance, package P-2, Configuration Control, was retracted by the Management
Review Committee because not all issues had been addressed and package T-12, Fuse
Control, could not be closed because an issue identified previously by the NRC had not
been resolved. We will continue to leave restart action plan items open until all relevant
issues have been addressed.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room.
Please call me at (610) 337-5376 if you have any questions. Your cooperation is
appreciated.
Sincerely,
9701160206 970110
ADOCK 05000272
William H. Ruland, Chief
Electrical Engineering Branch
Division of Reactor Safety
G
Docket Nos. 50-272; 50-311
Mr. Leon R. Eliason
2
Enclosure:
Combined Inspection Report Nos. 50-272/96-16 and 50-311/96-16
cc w/encl:
L. Storz, Senior Vice President - Nuclear Operations
E. Simpson, Senior Vice President - Nuclear Engineering
E. Salowitz, Director - Nuclear Business Support
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
D. Garchow, General Manager - Salem Operations
J. Benjamin, Director - Quality Assurance & Nuclear Safety Review
D. Powell, Manager, Licensing and Regulation
R. Kankus, Joint Owner Affairs
A. Tapert, Program Administrator
R. E. Selover, Esquire
M. Wetterhahn, Esquire
P. MacFarland Goelz, Manager, Joint Generation
Atlantic Electric
Consumer Advocate, Office of Consumer Advocate
William Conklin, Public Safety Consultant, Lower Alloways Creek Township
Public Service Commission of Maryland
State of New Jersey
State of Delaware
Mr. Leon R. Eliason
Distribution w/encl:
J. Wiggins, DRS
Region I Docket Room (with concurrences)
K. Gallagher, DRP
Nuclear Safety Information Center (NSIC)
L. Nicholson, DRP
S. Barber, DRP
R. DePriest, DRP
G. Kelly, DRS
N. Della Greca, DRS
W. Ruland, DRS
D. Screnci, PAO
NRC Resident Inspector
PUBLIC
DRS Files
Distribution w/encl: (Via E-Mail)
L. Olshan, NRR
W. Dean, OEDO
J. Stolz, PDl-2, NRR
M. Callahan, OCA
Inspection Program Branch, NRR (IPAS)
R. Correia, NRR
R. Frahm, Jr., NRR
DOCUMENT NAME: A:\\SA961616.INS
3
To receive a copy of this document, indic te in the box: "C" = Copy without
attachment/enclosure
"E" = Copy with ttachment/enclosure
"N" = No copy
NAME
ADELLAGRECA
WRULAND
DATE
01 /07/97
01 / 'C:J97
1 /
/97
OFFICIAL RECORD COPY