January 9, 1997 Mr. Leon R. Eliason Chief Nuclear Officer & President Nuclear Business Unit Public Service Electric and Gas Company P. 0. Box 236 Hancocks Bridge, New Jersey 08038
SUBJECT:
MAINTENANCE RULE BASELINE INSPECTION FOR HOPE CREEK
Dear Mr. Eliason:
In a telephone conversation on January 8, 1996, between Mr. D. Powell and Mr. J. Williams, arrangements were made for the NRC to conduct a baseline inspection of your maintenance rule program at Hope Creek. The inspection is planned for the week of February 24, 1997.
The inspection objective is to evaluate your performance to support compliance with the requirements of 10 CFR 50.65, "Requirements for monitoring the effectiveness of maintenance at nuclear power plants." The inspection will be conducted using Inspection Procedure 62706, "Maintenance Rule" and will involve a team of at least 4 inspectors.
The team will require information about your program for their in-office preparation for the inspection. This information is identified in the enclosure to this letter. Please provide this information to Mr. Williams by the week of February 3, 1997. Mr. Powell has been advised of this request.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact me at (610) 337-5211 or E-mail address GWM@NRC.GOV.
1G0029 Docket Nos. 50-272; 50-311 Sincerely, Glenn W. Meyer, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety
Enclosure:
Reference Material needed for maintenance rule inspection 9701160174 970109 PDR ADOCK 05000272 a
/
Mr. Leon R. Eliason 2
cc w/encl:
L. Storz, Senior Vice President - Nuclear Operations E. Simpson, Senior Vice President - Nuclear Engineering E. Salowitz, Director - Nuclear Business Support C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
D. Garchow, General Manager - Salem Operations J. Benjamin, Director - Quality Assurance & Nuclear Safety Review D. Powell, Manager, Licensing and Regulation R. Kankus, Joint Owner Affairs A. Tapert, Program Administrator R. E. Selover, Esquire M. Wetterhahn, Esquire P. MacFarland Goelz, Manager, Joint Generation Atlantic Electric Consumer Advocate, Office of Consumer Advocate William Conklin, Public Safety Consultant, Lower Alloways Creek Township Public Service Commission of Maryland State of New Jersey State of Delaware
Mr. Leon R. Eliason Distribution w/encl:
Region I Docket Room (with concurrences)
Kay Gallagher, DRP Nuclear Safety Information Center (NSIC) 3 L. Cunningham, NRR (Security/Safeguards IRs)
D. Barss, NRR (Emergency Plan IRs)
L. Nicholson, DRP S. Barber, DRP R. DePriest, DRP G. Kelly, DRS N. Della Greca, DRS D. Screnci, PAO (1)
NRC Resident Inspector PUBLIC DOCUMENT NAME: A:MAINRULE.HC To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" =No copy OFFICE RI/,- I\\ I,
I RI/ n I
RI/
I RI/
NAME
- l.JAi I)
J,.,
~
DATE 01 !p9!97 01I9197 01 I /97 01 I /97 OFFICIAL RECORD COPY I
RI/
01 I /97
, I.
REFERENCE MATERIAL FOR MAINTENANCE RULE INSPECTION
- 1.
Copy of Maintenance Rule Program and all related procedures including those relating to expert panels, PRA, risk assessments and ranking, and scoping. Also, procedures used for assessing risk when taking equipment out of service.
- 2.
List of all Systems, Structures, and Components (SSCs) and those within the scope of the maintenance rule.
- 3.
List of SSCs placed in (a)(1) and (a)(2) categories of the maintenance rule.
- 4.
List of maintenance preventable functional failures (MPFFs) for the current operating cycle with any repetitive failures identified.
- 5.
List of risk significant and risk rankings.
- 6.
Assessments of risk significant and risk rankings.
- 7.
Organization chart depicting key personnel involved in maintenance rule implementation and list of their office telephone numbers, including system engineers and their systems.
- 8.
Background explanations for SS Cs currently assigned to the (a)( 1 ) category.
- 9.
Copy of any internal or external maintenance rule assessments.
- 10.
Current maintenance rule trending data.
- 11.
Current performance criteria and goals for SSC. If PRA used, provide PRA information.
- 12.
Qualifications and backgrounds for Expert Panel Members.
- 13.
Risk Reduction Worth, Risk Achievement Worth, and Core Damage Frequency results; if applicable.