ML18102A502

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Revising Eighteen Month Surveillance Performed on Sys Pumps & Valves to Account for Testing of Turbine Driven AF Pump Which Can Only Be Performed in Higher Modes When Sufficient Secondary Steam Pressure Exists
ML18102A502
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/24/1996
From:
Public Service Enterprise Group
To:
Shared Package
ML18102A500 List:
References
NUDOCS 9611010171
Download: ML18102A502 (3)


Text

Document Control LR-N96321 Attachment 3 LCR S96-15 SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 CHANGE TO TECHNICAL SPECIFICATIONS TURBINE DRIVEN AUXILIARY FEEDWATER PUMP TESTING TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. DPR-70 are affected by this change request:

Technical Specification Page 4.7.1.2.c.1 3/4 7-6 4.7.1.2.c.2 3/4 7-6 The following Technical Specifications for Facility Operating License No. DPR-75 are affected by this change request:

Technical Specification 4.7.1.2.c.1 3/4 7-6 4.7.1.2.c.2 3/4 7-6

-~ ------------- -- -----~-- -,

9611010171 961024 PDR ADOCK 05000272 P PDR

,. .. .L'.

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

b. At least once per 92 days on a STAGGERED TEST BASIS by:
1. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
2. Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary steam generator supply pressure is greater than 680 psig. The provisions of Specif:lcation 4. 0. 4 are not applicable provided the surveillance is performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after secondary side pressu.:::a is greater than 680 psig.
c. At least once per 18 months e~%ift~ eft~tseWH by:
1. ~~ thae eaeh attt:emaeie: valve in the meteF elEivel'l: *

~ flew ~ata actuates te its eerreet ~~ties ea a ~l:lfR!'I" discfiar~epressure test si§JB:al.

2. Verifyia~ tfiat eaefi. awciliary feeewater ~uffif3 staFts as

~mat.4eall} ~~ea reeei~t ef each al:l:XiliaF} feeewater aetuatiea test si§JB:al.

- .\*

SALEM - UNIT 2 3/4 7-6 Amendment No. 13#, 146

PLANT SYSTEMS SURVE:LLANCE REQUIREME!'JTS '.~=~~inued)

b. At least once per 92 days on a STAGGERED TEST BASIS by:
l. Verifying tha't each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
2. Verifying that the steam turbine-driven pump develops a

"' discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary steam generator pressure is greater than 680 psig. The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after secondary side pressure is greater than 680 psig.

c. At least once per 18 months--a'l:lFiFi~ el:Niteewa- by:
l. Verifyiag taat sa.Gl:l. a'tltGma-tis "al-'J'.8 ia. tae i;igtor d.rimn:1 p"1mp fle*.* ~a&es te its eei?:E'eet J?lSSitiea ea a FlurRfl eiiseaaE"!;e,,,, .

presetl:¥e teat aigi;i,al.

Verifyia~ teat ea.ea al:Xiliary feeelwa.ter pui;ip starts as--

des.;i,gRee auteinatieally upee reeeipt ef eaoaauxiliaxy feeEil'ater ast'l:la-t4-0R test si~al .*

1rJSC1i.T .

Veri.\tl"~ ~~ ~~cUdtl li11tt ~eJWDi,~r p~Mf ~H-s Q~Mct~icu.lly

()(\. 0\1\ Cl't'h,\A-\ C(" .Sl/\'\\,\.lde~ aktfAA-'l-10(\ s*ai\Ul-\.

lk pro\1.15 ~ Q\\S ()~ Spe~ i{~ eo..4-~0(\ 4.o .Y. ~fe l\o+ arrf ;*CG\.-ble *{aik i-v.< '°~"e. Jri \lel'\ _a.11..~; r; (.\.(Yi {\~e~'i-elf" r~'vttt\f f ro11 ;'Jel 'itvi.sw 11e; llaV\ce.

is fe~orl'-'leJ w.{h:" _i-~ M\.l.c-s o..-+'+ec fk. se~o"Jo.,c-y ..s~~

erier-J-o-r fre&s<A.re... 15 0ra...'kc i\_r.,.,. G8o f.S*Q

  • 0

-'~

SALEM - UNIT l 3/4 7-6 Amendment No. !jZ, 165