Text
'
PS~G *
(--"
Public ~rvice Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit SEP 0 6 1995 LR-N95106 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
CLARIFICATION LETTER TECHNICAL SPECIFICATION AMENDMENTS 166/148 SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 This letter documents th~ telecon between Public Service Electric
& Gas Company (PSE&G) and NRC -
Salem Senior Project Manager on June 29, 1995.
By letter dated May 3, 1995, Amendments 166/148 were transmitted to PSE&G.
These amendments added a new action statement to Technical Specification (T.S.) 3.1.3.2.1, "Position Indicating Systems - Operating."
During Station Operations Review Committee (SORC) review of amendment implementation readiness, a concern was raised with respect to a statement made in the "Determination of No Significant Hazards Consideration" section of PSE&G letter dated August 19, 1994 (our Ref: License Change Request 94-30).
The specific concern was that in LCR 94-30, the statement is made that "The change *.. incorporates into the applicable LCO the action statement which is already taken under technical specification 3.0.3, and does not alter the operator response or response time" and that NRC may have approved the amendment without fully appreciating the difference between T.S. 3.0.3 action and the newly proposed action for LCO 3.1.3.2.1.
SORC recognized that the overall operator response and response time was not altered within the 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> allowed by either 3.0.3 or the new Limiting Condition for Operation (LCO) action statement. _However, the actions to be taken (operator response) within the first hour of the total allowed may not* be the same.
Specifically, Technical Specifications 3.0.3 requires that, during the first hour, actions be initiated (showing intent) to place the unit in a non-applicable Mode versus the new action statement which allows the first hour to correct the condition.
9509220102 950906 PDR ADOCK.05000272 P
......... _...... PDR The power is in your hands.. --.
95-2168 REV. 6/94
~
I I
Document*Control Desk LR-N95106 SEP 0 6 1995 2
As a result of this concern, on June 29, 1995, a telecon took place betweenPSE&G Nuclear Business Unit (NBU) representatives and the NRC - Salem Project Manager which confirmed that the NRC had a clear understanding of the actions that the NBU will take when this action statement is entered.
Also in the NRC's Safety Evaluation *Report (SER), the following statement is made: "The proposed change specifies an action statement that has the same effect as TS 3.0.3 **** "
This further demonstrates that the NRC understood the slight difference between T.S. 3.0.3 and the new LCO action statement.
Additionally, because the NRC's SER did not include the specific words relative to operator response and response time, those words (including their literal meaning) were not used as a basis for NRC approval of LCR 94-30.
PSE&G is currently licensed to the statement in the NRC's SER and not the statement as written in the Determination of No Significant Hazards Consideration.
In conclusion, if two or more rod position indicators per bank are inoperable for one hour (i.e., cannot be restored within the first hour), then the unit will be placed in HOT STANDBY within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
This action has the same effect as if TS 3.0.3 had been entered (i.e., 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> total to HOT STANDBY).
Should there be any questions with regard to this submittal, please do not hesitate to contact us.
Sincerely,
f'
'\\
~
Document*Control Desk LR-N95106 3
c Mr. T. T. Martin, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. L. N. Olshan, Licensing Project Manager -
Salem
- u. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. c. Marschall -
Salem (S09)
USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 SEP 0 61995