Mr. Leon R. Eliason
President and Chief Nuclear Officer
Public Service Electric and Gas Company
P.O. Box 236
Hancocks Bridge, NJ
08038
September 13, 1995
SUBJECT:
SALEM RESIDENT INSPECTION NOS. 50-272/95-13;
50-311/95-13
Dear Mr. Eliason:
1JtD
The enclosed report documents an inspection for public health and safety,
conducted by Mr. C. Marschall, Senior Resident Inspector and other members of
the NRC resident and regional staff at the Salem Nuclear Generating Station
for the period between June 23, 1995 and August 12, 1995.
The inspectors
discussed the findings of this inspection with Messrs. C. Warren, General
Manager-Salem operations, and other members of your staff.
Within the scope of this inspection, the inspectors did not identify any
significant safety concerns or violations.
We are encouraged by the recent
performance of your Quality Assurance audit teams and the preliminary results
of the System Restart Readiness Reviews relative to the scope and quality of
your processes to effect improved system reliability and program performance.
Notwithstanding, our assessment of your overall performance will be based on
actual results achieved.
In this inspection period, while restart readiness
processes and quality assurance implementation appears to be well executed,
control of maintenance activities continues to be ineffective. Sustained and
consistent performance in all functional areas of nuclear safety, and
demonstrated lasting corrective measures, are essential in achieving
acceptable long term performance for the Salem units.
No reply to this letter is required.
In accordance with 10 CFR 2.790 of the
NRC's "Rules of Practice," a copy of this letter and its enclosures will be
placed in the NRC Public Document Room.
Your cooperation with us is appreciated.
Docket Nos. 50-272
50-311
Sincerely,
ORIGINAL SIGNED BY:
S. Barber for
John R. White, Chief
Projects Section No. a
Division of Reactor Projects
Enclosure:
NRC Inspection Report Nos. 50-272/95-13; 50-311/95-13
9509180349 950913
ADOCK 05000272
G
\\\\\\
rcn1
- i
Mr. Leon R. Eliason
2
cc w/encl :
L. Storz, Senior Vice President - Nuclear Operations
E. Simpson, Senior Vice President - Nuclear Engineering
J. Hagan, Vice President - Business Support
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
R. Burricelli, Director - External Affairs
C. Warren, General Manager - Salem Operations
J. Benjamin, Director - Quality Assurance & Nuclear Safety Review
F.* Thomson, Manager, Licensing and Regulation
R. Kankus, Joint Owner Affairs
A. Tapert, Program Administrator
R. Fryling, Jr., Esquire
M. Wetterhahn, Esquire
P. MacFarland Goelz, Manager, Joint Generation
Atlantic Electric
Consumer Advocate, Office of Consumer Advocate
William Conklin, Public Safety Consultant, Lower Alloways Creek Township
Public Service Commission of Maryland
State of New Jersey
State of Delaware
-
Mr. Leon R. Eliason
3
Distribution w/encl:
Region I Docket Room (with concurrences)
K. Gallagher
Nuclear Safety Information Center (NSIC)
D. Screnci, PAO (2)
NRC Resident Inspector
PUBLIC
Distribution w/encl: (Via E-Mail)
L. 01 sh an, NRR
W. Dean, OEDO
J. Stolz, PDI-2, NRR
Inspection Program Branch, NRR (IPAS)
DOCUMENT NAME:
a:9513.sal
To receive a copy of this document, indicate in the box: **c* = Cop witf1out attachment/enclosure
"E' = Copy with
attachment/enclosure "N" = No copy.
I.)
OFFICE
NAME
CM a
DATE
09/
09/d/95
OFFICIAL RECORD COPY