MONTHYEARML24025A1372024-01-31031 January 2024 Summary of Observation Pre-Submittal Meeting Held with Snc., Regarding a Proposed Alternative Request - Explosively Actuated Valves for Vogtle Electric Generating Plant, Units 3 and 4 ML24019A1932024-01-30030 January 2024 Summary of January 8, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed LAR for Vogtle Electric Generating Plant, Units 1, 2, 3, & 4; Hatch, Units 1 & 2; Farley, Units 1 & 2 ML23356A0282023-12-27027 December 2023 December 11, 2023, Pre-Application Meeting with SNC Regarding a Proposed Fleet LAR to Revise TS 5.3.1 to Relocate Training Qualification Requirements from TS to Their Qatr/Ndqam ML23311A1302023-11-17017 November 2023 Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0 ML23313A0952023-11-16016 November 2023 Summary of November 7, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML23303A2032023-11-0101 November 2023 October 24, 2023, Summary of Comment Gathering Public Meeting on Lessons Learned from the ITAAC Hearing Process for Vogtle Units 3 and 4 ML23275A0882023-10-12012 October 2023 Summary of Meeting with Southern Nuclear Operating Company ML23272A1822023-10-11011 October 2023 Summary of September 28, 2023, Observation Pre Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 3 and 4 ML23230A0212023-08-30030 August 2023 LAR-22-002 Technical Specification 3.8.3 Summary of 08-17-23 Public Meeting ML23187A5742023-08-22022 August 2023 Summary of June 29, 2023, Meeting with Southern Nuclear Operating Company ML23146A1542023-06-0505 June 2023 Summary of May 25, 2023, Meeting with Southern Nuclear Operating Company ML23132A0412023-05-18018 May 2023 Summary of May 11, 2023, Meeting with Southern Nuclear Operating Company ML23121A1692023-05-12012 May 2023 Summary of Meeting with Southern Nuclear Operating Company Vogtle LAR-23-006 U/3&4 More Restrictive Action for TS 3.1.9 Cvs Isolation Valves ML23115A3282023-05-10010 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have a Pre-Submittal Discussion of Draft License Amendment Request (LAR) for Vogtle Electric Generating Plant (VEGP) Unit 3 ML23115A0662023-05-0101 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have Presubmittal Meeting for Vogtle Electric Generating Plant, Unit 4 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 ML23090A1422023-04-0303 April 2023 Summary of Conference Call Regarding the Spring 2022 Steam Generator Tube Inspections ML23065A0732023-03-17017 March 2023 March 2, 2023, Summary of Meeting with Southern Nuclear Operating Company - Vogtle Electric Generating Plant, Unit 4 ML23055A0902023-03-14014 March 2023 February 16, 2023, Summary of Meeting with Southern Nuclear Operating Company ML23048A0682023-03-0101 March 2023 Summary of February 13, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc. Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML23037A0032023-02-0606 February 2023 Summary of February 2, 2023, Public Meeting with Southern Nuclear Operating Company ML23012A0512023-01-17017 January 2023 January 11, 2023, Summary of Public Meeting with Southern Nuclear Operating Company (SNC) Regarding Vogtle Emergency Technical Specification Amendment ML22349A2142023-01-0303 January 2023 Summary of December 8, 2022, Public Meeting with Southern Nuclear Operating Company ML22336A0812022-12-0505 December 2022 Summary of December 1, 2022, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22335A4922022-12-0202 December 2022 Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22319A0132022-11-30030 November 2022 Summary of a Public Meeting with Southern Nuclear Operating Company on November 10, 2022 ML22322A1672022-11-28028 November 2022 Summary of 11/15/2022 Public Meeting on Lessons Learned ML22271A0182022-10-0404 October 2022 Summary of Public Meeting with SNC on Lessons Learned Final ML22257A2362022-09-19019 September 2022 Summary of September 13, 2022, Partially Open and Partially Closed Pre-Submittal Meeting Held with SNC, Regarding a Proposed OLM License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22243A0302022-09-0909 September 2022 Summary of a Public Meeting with Southern Nuclear Operating Company on August 25, 2022 ML22145A6052022-06-0202 June 2022 Summary of May 24, 2022, Public Meeting with SNC, Regarding a Proposed Alternative Request for Performance-Based Leakage Test Frequencies for the Refueling Water Tank Suction Check Valves for Vogtle, Units 1 & 2 ML22145A4492022-05-27027 May 2022 Summary of May 23, 2022, Public Meeting with SNC, Regarding a Proposed License Amendment Request to Change Technical Specification 3.8.1 and Implement TSTF-163 for Vogtle Electric Generating Plant, Units 1 and 2 ML22131A3422022-05-18018 May 2022 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Requests to Implement Alternate Source Term, TSTF-51, TSTF-471, and TSTF-490 for Vogtle, Units 1 & 2 (EPID No. L-2022-LRM-0033 ML22132A0102022-05-17017 May 2022 Meeting of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding Proposed Accident Tolerant Fuel License Amendment Request and Exceptions for Vogtle Electric Generating Plant, Units 1 and 2 ML22123A0652022-05-0202 May 2022 Public Meeting Summary Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 50-424, 50-425, 52-025, 52-026, Meeting Number 20220330 ML22098A1292022-04-26026 April 2022 Summary of March 31, 2022 Public Meeting with Southern Nuclear Operating Company ML22095A2292022-04-11011 April 2022 Summary of Conference Call Regarding the Spring 2022 Steam Generator Tube Inspections ML22077A5432022-04-0404 April 2022 Summary of Meeting with Southern Nuclear Operating Co ML22028A0462022-02-0101 February 2022 MTS - Meeting Summary - Pre-Submittal Meeting on January 27, 2022 - Vogtle ATF LAR and Exemption ML21337A0032021-12-0707 December 2021 Summary of Vogtle Readiness Group Public Meeting on December 2, 2021 ML21322A1502021-12-0202 December 2021 Summary of November 10, 2021 Public Meeting with Southern Nuclear Operating Company ML21316A0692021-11-22022 November 2021 November 4, 2021 Summary of Public Meeting with Southern Nuclear Operating Company ML21313A1172021-11-18018 November 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Change the Technical Specification Related to Technical Specification 5.5.16 for Joseph M. Farley Nuclear Plant ML21238A1622021-09-10010 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Change the Technical Specification Related to Main Steam Isolation Valves for Vogtle Electric Generating Plant ML21225A5532021-08-31031 August 2021 August 13,2021, Public Meeting Summary with Southern Nuclear Operating Regarding Proposed LAR to Revise Technical Specifications Related to Reactor Trip System & Engineered Safety Feature Actuation System Instrumentation for Vogtle 1&2 (L-2 ML21230A0102021-08-24024 August 2021 Summary of Public Meeting with Southern Nuclear Operating Company on August 12, 2021 ML21154A2772021-07-20020 July 2021 Summary of a Public Meeting with Southern Nuclear Operating Company on May 27, 2021 ML21194A0402021-07-20020 July 2021 Summary of June 24, 2021 Public Meeting with SNC ML21190A0622021-07-16016 July 2021 Summary of July 8 2021 Public Meeting to Discuss Late-Filed Allegation Process for Vogtle Electric Generating Plant Units 3 and 4 2024-01-31
[Table view] Category:Memoranda
MONTHYEARML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report ML24004A2192024-01-0808 January 2024 Construction Reactor Oversight Process Performance Metric Report for Calendar Year 2023 ML23303A2032023-11-0101 November 2023 October 24, 2023, Summary of Comment Gathering Public Meeting on Lessons Learned from the ITAAC Hearing Process for Vogtle Units 3 and 4 ML22348A0862023-07-25025 July 2023 Finding in Accordance with 10 CFR 52.103(G) That All Acceptance Criteria Are Met for Vogtle Electric Generating Plant, Unit 4 ML23115A0382023-05-0909 May 2023 Summary of Readiness Group Public Meeting on April 20, 2023 ML23115A0662023-05-0101 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have Presubmittal Meeting for Vogtle Electric Generating Plant, Unit 4 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 ML22214B4882023-02-0808 February 2023 Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 4 ML22355A0322023-01-0303 January 2023 Revised Charter for the Vogtle Readiness Group to Oversee the Transition to Operations for Vogtle Units 3 and 4 ML22334A0812022-12-0101 December 2022 Update to Targeted Inspections, Tests, Analysis, and Acceptance Criteria for Vogtle Electric Generating Plant Unit 4 ML22322A1672022-11-28028 November 2022 Summary of 11/15/2022 Public Meeting on Lessons Learned ML22237A0782022-08-0505 August 2022 American Nuclear Insurers, Notification of Change in the Number of Power Reactors in the Secondary Financial Protection (SFP) Program ML20290A2812022-08-0101 August 2022 103g - Final Memorandum ML22123A0652022-05-0202 May 2022 Public Meeting Summary Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 50-424, 50-425, 52-025, 52-026, Meeting Number 20220330 ML21337A0032021-12-0707 December 2021 Summary of Vogtle Readiness Group Public Meeting on December 2, 2021 ML21322A1502021-12-0202 December 2021 Summary of November 10, 2021 Public Meeting with Southern Nuclear Operating Company ML21316A0692021-11-22022 November 2021 November 4, 2021 Summary of Public Meeting with Southern Nuclear Operating Company ML21280A2962021-10-22022 October 2021 Replacement of Page 2 to Letter Dated June 30, 2020, Titled License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions (EPID L-2020-LLA0150) ML21230A0102021-08-24024 August 2021 Summary of Public Meeting with Southern Nuclear Operating Company on August 12, 2021 ML21194A0402021-07-20020 July 2021 Summary of June 24, 2021 Public Meeting with SNC ML21154A2772021-07-20020 July 2021 Summary of a Public Meeting with Southern Nuclear Operating Company on May 27, 2021 ML21190A0622021-07-16016 July 2021 Summary of July 8 2021 Public Meeting to Discuss Late-Filed Allegation Process for Vogtle Electric Generating Plant Units 3 and 4 ML21194A0392021-07-16016 July 2021 July 8, 2021 Summary of Public Meeting with Southern Nuclear Operating Company ML21124A2032021-05-0606 May 2021 ASME Alternative ALT-16 Pre-submittal Meeting Summary 4-29-21 ML21123A1432021-05-0505 May 2021 April 22, 2021, Summary of a Public Meeting with Southern Nuclear Operating Company ML20318A2422020-12-18018 December 2020 .72 50.73 Applicability Memo ML20351A2822020-12-10010 December 2020 Summary of Public Meeting with Southern Nuclear Operating Co ML20318A2412020-11-18018 November 2020 Summary of Public Meeting with Southern Nuclear Operating Company, to Discuss Topic Regarding Vogtle Electric Generating Plant, Unit 4: ITAAC Post Closure Notification for ITAAC Index Number 344 ML20303A0422020-11-0505 November 2020 Summary of October 22, 2020 Public Meeting with Southern Nuclear Operating Company NL-20-1262, Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion2020-10-30030 October 2020 Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion ML20296A2432020-10-15015 October 2020 Summary of 10-15-20 Public Meeting with Southern Nuclear Operating Company ML20283A4652020-10-15015 October 2020 Summary of Public Meeting on October 8, 2020 with Southern Nuclear Operating Company ML20279A5202020-10-0707 October 2020 October 1, 2020, Summary of Public Meeting with Southern Nuclear Operating Company ML20183A0902020-09-24024 September 2020 Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 3 ML20262G9882020-09-22022 September 2020 September 17, 2020 Summary of Public Meeting with Southern Nuclear Operating Company ML20248H3292020-09-10010 September 2020 Meeting Summary for September 3, 2020 Public Meeting with Southern Nuclear Operating Company ML20247J4812020-09-10010 September 2020 Summary for August 27, 2020 Public Meeting with Southern Nuclear Operating Company ML20191A3832020-08-14014 August 2020 Transition to Reactor Oversight Process for Vogtle Electric Generating Plant, Units 3 and 4 ML20216A6362020-08-10010 August 2020 Summary of a Public Meeting with Southern Nuclear Operating Company on July 23, 2020 ML20216A6252020-08-10010 August 2020 Summary of a Public Meeting with Southern Nuclear Operating Company on July 30, 2020 ML20205L4312020-07-29029 July 2020 Summary of a Public Meeting with Southern Nuclear Operating Company to Discuss Inspections, Tests, Analyses and Acceptance Criteria Nos. 375 and 216 ML20178A1302020-07-15015 July 2020 Memorandum Transmitting Safety Evaluation Regarding Welded Reinforcement Bar Splices at Vogtle Electric Generating Plant Units 3 and 4 ML20190A0182020-07-0808 July 2020 Summary of Meeting Regarding the Vogtle Readiness Group ML20168A3352020-06-26026 June 2020 Summary of June 11, 2020 Public Meeting with Southern Nuclear Operating Company ML20150A0092020-06-0202 June 2020 Summary of May 28, 2020 Public Meeting with Southern Nuclear Operating Company ML20154K7272020-06-0202 June 2020 EOC Meeting Summary ML20141L6182020-06-0101 June 2020 Summary of May 14, 2020 Public Meeting with Southern Nuclear Operating Company ML20141L6982020-05-26026 May 2020 Audit Report for Vogtle Electric Generating Plant Unit 3 LAR 20-001: Auxiliary Building Wall 11 Seismic Gap Requirements ML20133K1062020-05-15015 May 2020 Audit Plan for Vogtle Electric Generating Plant Units 3 and 4, Request for License Amendment: Core Makeup Tank Boron Concentration Requirements (LAR 20-004) ML20108E9332020-04-27027 April 2020 Summary of April 16, 2020 Public Meeting with Southern Nuclear Operating Company 2024-01-08
[Table view] |
Text
April 12, 2018 MEMORANDUM TO: Kerri A. Kavanagh, Chief Quality Assurance Vendor Inspection Branch-2 Division of Construction Inspection and Operational Programs Office of New Reactors FROM: Thomas Fredette, Reactor Operations Engineer /RA/
Construction Inspection Program Branch Division of Construction Inspection and Operational Programs Office of New Reactors
SUBJECT:
SUMMARY
OF PUBLIC MEETING WITH SOUTHERN NUCLEAR TO DISCUSS ACTIVITIES RELATED TO THE AP1000 INITIAL TEST PROGRAM AT VOGTLE UNITS 3 & 4 The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 2 public meeting with representatives of Southern Nuclear Operating Company (SNC) on March 27, 2018. The purpose of the meeting was to discuss status and issues associated with the AP1000 Initial Test Program to be implemented at SNCs Vogtle Units 3 & 4 construction projects.
The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) under accession number ML18072A128. The meeting notice is also posted to the NRCs public website. The meeting agenda and attendance list are provided as enclosures to this document. An additional enclosure contains questions submitted by a member of the public an advance of the meeting and the staff responses to those questions.
Presentation slides referenced during the open portion of the meeting can be found at the following ADAMS accession numbers:
Initial Test Program (ITP) Inspection Planning Meeting ML18078A096 Summary of Meeting:
On March 27, 2018, staff from the NRC Office of New Reactors and Region II conducted a public meeting with representatives from SNC to discuss issues associated with the AP1000 Initial Test Program (ITP) to be implemented for Vogtle Units 3 and 4. The meeting was a forum for the licensee to update the NRC staff on ITP development.
CONTACT: Thomas Fredette, NRO/DCIP 301-415-8538
K. Kavanagh The NRC staff provided a brief overview of ITP oversight and regulatory objectives, and an introduction of new NRC staff that will be engaged in ITP oversight. SNC provided an overview of progress at the Vogtle construction site, and highlighted that the focus has been on test procedure development, and that they expected the first power block testing to commence in the latter half of 2018. SNC also provided highlights of recent and current licensing actions, specifically:
- SNCs intent is to submit a license amendment requests (LAR) covering China First Plant Only and First 3 Plants Only testing (FPOT/F3POT) applicability. SNC will split the scope of the LAR to cover preoperational tests and start-up tests separately; planned submittal of the preoperational test scope is July 2018. A technical exchange between SNC and NRC took place during the March 8, 2018 public meeting.
- SNC provided an overview of two LARs submitted in Fall 2017 for natural circulation/
passive residual heat removal (PRHR) start-up FPOT, and changes to the methodology and acceptance criteria for PRHR heat transfer and in-containment refueling water storage tank (IRWST) heat up tests. Responses to these LARs are expected in mid- to late-2018.
At the end of this portion of the meeting, there was an opportunity for members of the public to provide questions and comments to NRC staff. The enclosed questions, submitted in advance of the meeting, were verbally addressed by the staff. The public portion of the meeting was then adjourned.
During the closed portion of the meeting, SNC provided an updated ITP organizational structure and objectives for completing test procedure and test specification development. Additionally, the following topics were discussed:
- Changes and restructuring/consolidation of the SNC ITP administrative manual
- Transition from the Westinghouse QA to SNC QA program
- Progress and schedule for test procedure development
- Test packages to support uncompleted ITAAC notification (UIN) submittals and ITP-related UINs
- Potential licensing change to incorporate graded approach to testing into the Vogtle UFSAR
- Overview of preoperational test procedure development Through the course of discussion, several actions were captured as a result of this meeting:
- Provide clarification as to when EQ qualified life begins (installation, testing, operation?) - due to Region II
- Consider important to safety equipment under graded approach (i.e. regulatory treatment of non-safety systems (RTNSS) equipment) - due to NRO
- Review implementing SNC audit procedure for WEC test specification development (appropriate oversight) - due to NRO
- Schedule workshop (tabletop exercise) to review test specification and procedure for system (TBD); to be conducted prior to ITP administrative manual inspection June 25th -
due to NRO
- Provide guidance for NRC project schedule users to identify ITP activities of interest -
due to Region II
K. Kavanagh SNC and NRC agreed to conduct working-level (ITP planning) meetings going forward on a quarterly basis. After a review of the above action items, the closed portion of the meeting was adjourned.
Docket Nos.52-025 and 52-026
Enclosures:
- 1. Agenda
- 2. List of Attendees
- 3. Questions from the Public (submitted in advance)
ML18101A713 NRO-002 OFFICE NRO/DCIP NRO/DCIP NAME TFredette KKavanagh DATE 04/12/18 04/12/18 K. Kavanagh Vogtle Units 3 & 4 Mailing List (Revised 03/08/2018) cc:
Office of the Attorney General Resident Inspector 40 Capitol Square, SW Vogtle Plant Units 3 & 4 Atlanta, GA 30334 8805 River Road Waynesboro, GA 30830 Resident Manager Oglethorpe Power Corporation Mr. Barty Simonton Alvin W. Vogtle Nuclear Plant Team Leader 7821 River Road Environmental Radiation Program Waynesboro, GA 30830 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company 4244 International Parkway, Suite 120 Document Control Coordinator Atlanta, GA 30354-3906 42 Inverness Center Parkway, Bin 237 Birmingham, AL 35242 George B. Taylor, Jr.
2100 East Exchange Pl Anne F. Appleby Atlanta, GA 30084-5336 Olgethorpe Power Corporation 2100 East Exchange Place Brian H. Whitley Tucker, GA 30084 Regulatory Affairs Director Southern Nuclear Operating Company County Commissioner 42 Inverness Center Parkway, BIN B237 Office of the County Commissioner Birmingham, AL 35242 Burke County Commission Waynesboro, GA 30830 Mr. Michael Yox Site Regulatory Affairs Director Mr. Wayne Guilfoyle Vogtle Units 3 & 4 Commissioner District 8 7825 River Road, Bin 63031 Augusta-Richmond County Commission Waynesboro, GA 30830 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334
K. Kavanagh Vogtle Units 3 & 4 Mailing List Email acchambe@southernco.com (Amy Chamberlian) agaughtm@southernco.com (Amy Aughtman)
ALPUGH@southernco.com (Amanda Pugh) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)
Bill.Jacobs@gdsassociates.com (Bill Jacobs) bjadams@southernco.com (Brad Adams) bwwaites@southernco.com (Brandon Waites) castelca@westinghouse.com (Curtis Castell) comerj@westinghouse.com (James Comer) crenshjw@westinghouse.com (John Crenshaw) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dgbost@southernco.com (Danny Bost) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) erg-xl@cox.net (Eddie R. Grant) fdhundle@southernco.com (Forrest Hundley) fhwillis@southernco.com (Fred Willis)
G2NDRMDC@southernco.com (SNC Document Control) graysw@westinghouse.com (Scott W. Gray) jadwilli@southernco.com (J.D. Williams) james1.beard@ge.com (James Beard) jannina.blanco@pillsburylaw.com (Jannina Blanco) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)
JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)
John.Bozga@nrc.gov (John Bozga)
Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) jranalli@meagpower.org (Jerry Ranalli) jtgasser@southernco.com (Jeff Gasser) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kdfili@southernco.com (Karen Fili) kmstacy@southernco.com (Kara Stacy)
K. Kavanagh Vogtle Units 3 & 4 Mailing List KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) lchandler@morganlewis.com (Lawrence J. Chandler)
Marc.Pickering@hq.doe.gov (Marc Pickering) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)
Melissa.Smith@Hq.Doe.Gov (Melissa Smith)
Michael.Kuca@hq.doe.gov (Michael Kuca) mike.price@opc.com (M.W. Price) mlgraves@southernco.com (Michelle Graves)
MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple) patriciaL.campbell@ge.com (Patricia L. Campbell)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi) rjarrett@southernco.com (Robyn Jarrett)
RJB@NEI.org (Russell Bell)
Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)
Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) skauffman@mpr.com (Storm Kauffman) sroetger@psc.state.ga.us (Steve Roetger) stephan.moen@ge.com (Stephan Moen) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller)
TomClements329@cs.com (Tom Clements)
Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver) x2gabeck@southernco.com (Gary Becker) x2kmseib@southernco.com (Kristin Seibert)
Meeting Agenda:
Topic Time Lead
Introduction / Opening Remarks 8:30 am - 8:40 am NRC NRC Perspectives on ITP 8:40 am - 9:00 am NRC ITP Goals, Testing and Status 9:00 am - 9:15 am SNC Public Questions and Comments* 9:15 am - 9:30 am Break 9:30 am - 9:35 am All
Organizational Chart 9:35 am - 9:50 am SNC Administrative Procedures 9:50 am - 10:50 am SNC Schedule 10:50 am - 12:00 pm SNC Lunch 12:00 pm - 1:00 pm All UINs / ITAAC 1:00 pm - 1:20 pm SNC Licensing Topics 1:20 pm - 2:00 pm SNC Test Procedure Development 2:00 pm - 3:30 pm SNC Review of Action Items 3:30 pm - 3:45 pm All Closing Remarks and Adjournment 3:45 pm - 4:00 pm NRC
- The public will have an opportunity to ask questions and/or comment.
Enclosure 1
Meeting Attendance:
Southern Nuclear-Catherine Perego Vogtle Licensing Thomas Petrak Vogtle ITAAC Robert Nicoletto Vogtle ITP Allen Nix Vogtle Startup Test Terrence Forehand Vogtle ITP David Martrano Vogtle ITP Craig Ingold Vogtle ITP Josh Olson Vogtle ITAAC Lindsey Grissom Vogtle Licensing Amanda Pugh Vogtle Licensing Jeremiah Haswell GPC Nuclear Development Duong Nguyen GPC Nuclear Development Steve Leighty* Vogtle Licensing Georgia Public Service Commission-Bill Jacobs Doug Cheshire Shemetha Jones Steven Roetger Public-Ms. Glenn Carroll Nuclear Watch South Bill Freebairn* S&P Global Platts NRC Staff-Shakur Walker Region II Kerri Kavanagh NRO Lisa Castelli Region II Jermaine Heath NRO Robert Mathis Region II Taylor Lamb* NRO Chris Welch* NRO Thomas Fredette NRO
- via telephone Enclosure 2
Public Participation:
The following questions from the public were provided to NRC staff and responses were formulated in advance of the meeting:
- 1) How many NRC inspectors are assigned to Vogtle construction? How many are on site on a given day?
NRC response - The NRC has five resident inspectors assigned to the Vogtle construction project. They are augmented by regional and NRC HQ-based inspectors from time to time depending on the inspection expertise required for a given construction inspection.
- 2) How many inspectors are assigned to Chinese AP1000 construction?
NRC response - The NRC has sent 13 inspectors to Sanmen as part of the inspector exchanges with the Chinese regulatory agency, NNSA since April 2010. These inspector exchanges have been from two weeks to three months in length and have not been continuous coverage. The length of the exchanges have varied due to the scope of the inspections and the time of the year. The NRC has no regulatory authority over the Chinese AP1000 construction and are only able to send inspectors as guests of the Chines regulator. The Vogtle licensee also has had representatives on site at Sanmen as guests of the Chinese AP1000 owner. The NRC continues to engage SNC, during meetings such as these, to benefit from their firsthand experience and access to the China projects.
The Chinese regulator has multiple inspectors on site during construction at Sanmen and Haiyang.
- 3) How would NRC approach reconciling design and regulatory differences between Chinese AP1000 and Georgia Power AP1000?
NRC reponse - The NRC has been conducting inspections at Westinghouse and their design partners facilities since early 2008 evaluating changes to the design. During our inspections we sample design changes to ensure that Westinghouse has controlled the design consistent with their NRC approved quality assurance program. These samples have included changes made to Vogtle based on changes to the Chinese facilities.
- 4) How many stop work suspensions presently at Vogtle 3 & 4 due to problems with blueprints?
This question was deferred to SNC. There are currently no stop work suspensions or stop work orders in place at the Vogtle construction project.
Enclosure 3
- 5) Do NRC inspectors oversee component construction for Vogtle 3 & 4 at the vendor or at the site? Or some other way?
NRC response - The licensee is responsible for overseeing component construction for their facilities. However, the NRC has a vendor inspection program which performs inspections of component manufacturers for both the new Vogtle reactors and the operating fleet. The NRC performs vendor inspections to verify that the licensee is properly overseeing their vendors/suppliers and to verify, on a sampling basis, that the vendors/suppliers are manufacturing components consistent with the design and quality requirements.