Forwards Insp Repts 50-272/95-01 & 50-311/95-01 on Stated Dates.No Violations Noted
ML18101A584
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/03/1995
From: Ruland W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
Shared Package
ML18101A585 List:
References
NUDOCS 9503150053
Download: ML18101A584 (3)


See also: IR 05000272/1995001

Text

'

March 3, 1995

Mr. Leon R. Eliason

Chief Nuclear Officer & President

Nuclear Business Unit

Public Service Electric and Gas Company

P. 0. Box 236

Hancocks Bridge, New Jersey 08038

SUBJECT:

COMBINED INSPECTlON REPORT NOS. 50-272/95-01 AND 50-311/95-01

Dear Mr. Eliason:

This letter refers to the announced safety inspection conducted by

Mr. L. Scholl and others of this office from January 12-20, 1995, at Salem

Nuclear Generating Station, Units 1 and 2.

The inspectors discussed our

findings with members of your staff at the end of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. The inspection was a review and assessment of engineering activities

that support the safe operation of Salem Units 1 and 2. This inspection

focused primarily on the activities of the plant technical department. Within

these areas, the inspection consisted of examinations of procedures and

representative records, interviews with personnel, and observations by the

inspector.

The inspectors found that there has been an improvement in communications

between the engineering departments and other plant departments.

In addition,

the inspectors found that some long-standing equipment and system operational

problems are now being addressed.

Although the need for good*root cause analysis is recognized by the

engineering staff, the inspectors found that the quality of problem resolution

was variable.

In some cases, the root cause of problems was not identified

and in other examples unexpected system responses were not fully investigated

and resolved prior to returning equipment to service. Also, the quality of

operability determinations was not consistent in that thorough consideration

and documentation of the implications of technical specification bases and the

accident analyses results was often not included.

The inspectors concluded that there continued to be inconsistencies in the

quality of engineering activities as was discussed in the recently issued

systematic assessment of licensee performance report for the Salem Generating

Stations, Units 1 and 2 (Report Nos. 50-272; 50-311/93-99) .

14 0 G2 *;

1

9503150053 950303

PDR

ADOCK 05000272

G

PDR

. *

.

...

March 3, 199~

Mr. Leon R. Eliason

2

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

You need not respond to this letter. Please call me at (610) 337-5376 if you

have any questions. Your cooperation is appreciated.

Docket Nos. 50-272; 50-311

Sincerely,

William H. Ruland, Chief

Electrical Section

Division of Reactor Safety

Enclosure:

Combined Inspection Report Nos. 50-272/95-01

and 50-311/95-01 w/Attachment

cc w/encl:

J. J. Hagan, Vice President-Operations

S. LaBruna, Vice President - Engineering and Plant Betterment

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

R. Burricelli, General Manager - Information Systems & External Affairs

J. Summers, General Manager - Salem Operations

J. Benjamin, Director - Quality*Assurance & Safety Review

F. Thomson, Manager, Licensing and Regulation

R. Kankus, Joint Owner Affairs

A. Tapert, Program Administrator

R. Fryling, Jr., Esquire * *

M. Wetterhahn, Esquire

P. J. Curham, Manager, Joint Generation Department,

Atlantic Electric Company

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

Public Service Commission of Maryland

D. Screnci, PAO (2)

PUBLIC

Nuclear Safety Information-Center {NSIC)

NRC Resident Inspector

State of New Jersey

State of Delaware

...

Mai'.ttt~3, 1995

Mr. Leon R. Eliason

3

bee w/encl:

Region I Docket Room (with concurrences)

J. Wiggins, DRS

Kay Gallagher, DRP

DRS Files (2)

bee w/encl: (Via E-Mail)

L. 01 sh an, NRR

W. Dean, OEDO

J. Stolz, PDl-2, NRR

M. Callahan, OCA

Inspection Program Branch, NRR (IPAS)

bee w/o encl: (Via E-Mail)