February 21, 1995
Mr. Leon R. Eliason
President and Chief Nuclear Officer
Public Service Electric and Gas Company
P.O. Box 236
Hancocks Bridge, NJ
08038
SUBJECT:
NRC INSPECTION NOS.
50-272/~4-35; 50-311/94-35
Dear Mr. Eliason:
The enclosed report documents an inspection for public health and safety,
conducted by Mr. C. Marschall, Senior Resident Inspector and other members of
the NRC staff at the Salem Nuclear Generating Station for the period between
December 18, 1994 and January 28, 1995. These finding were previously
discussed with Mr. J. Summers, General Manger-Salem Operations, and other
members of your staff.
During this period, we noted performance improvement relative to system
engineering inspection activities and timely communication of related concerns
to operations.
We also observed that your Operations organization effectively
contributed to successful completion of complex safety-related maintenance
activities.
We also noted your safety conscious decision to fully resolve the
pressurizer safety relief valve leakage problems affecting Unit 2 before *
returning the unit to service.
We also observed your continued activities to resolve recurring Automatic Test
Insertion (ATI) faults within your Safeguard Equipment Control (SEC) system.
However, it appears that a more thorough root cause approach to previous ATI
test faults may have avoided the operational challenge to Unit 1 operators due
to the recurri.ng SEC operability problem.
Based on the results of this inspection, it appears that you failed to adhere
to the requirements of Technical Specification 3.3.2.1.b relative to
maintaining a minimum of one engineered safety feature actuation steam flow
instrumentation channel operable while Unit 2 was in Mode 3 on December 26,
1994.
However, since this violation was self-identified by your operating
organization, and our inspectors confirmed that you met the criteria for
enforcement discretion as specified in 10CFR2, Appendix C, Section VII, this
violation will not be cited.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice, a copy of
this letter will be pl aced in the NRC Pub l i c Dotument Room.
No response to
this letter is required.
9503010076 950221
ADOCK 05000277
G
,fiDI)'
- -
Mr. Leon R. Eliason
2
Your cooperation with us is appreciated.
Docket Nos. 50-272; 50-311
Enclosures:
Sincerely,
ORIGINAL SIGNED BY:
John R. White, Chief
Projects Section No. 2A
Division of Reactor Projects
1.
NRC Inspection Report Nos. 50-272/94-35; 50-311/94-35
cc w/encl:
J. J. Hagan, Vice President-Operations
S. LaBruna, Vice President - Engineering and Plant Betterment
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
P. J. Curham, Manager, Joint Generation Department,
Atlantic Electric Company
R. Burricelli, General Manager - Information Systems & External Affairs
J. Summers, General Manager - Salem Operations
J. Benjamin, Director of Quality Assurance and Safety Review
F. Thomson, Manager - Licensing and Regulation
R. Kankus, Joint Owner Affairs
A. C. Tapert, Program Administrator
R. Fryling, Jr., Esquire
M. J. Wetterhahn, Esquire
Consumer Advocate, Office of Consumer Advocate
William Conklin, Public Safety Consultant, Lower Alloways Creek Township
D. Screnci, PAO (2)
PUBLIC
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
State of Delaware
.
~ Mr. Leon R. Eliason
3
bee w/encl:
Region I Docket Room (with concurrences)
K. Gallagher
bee w/encl: (Via E-Mail)
D. Moran, Project Manager, NRR
J. Stolz, PDI-2, NRR
Inspection Program Branch, NRR (IPAS)
DOCUMENT NAME:
a:9435.sal
To mceive a copy all this docummt. lndicat In
attachmentjenclosure "N' = No copy
OFFICE
p
NAME
chall
DATE
/95