Informs That Staff Finds Util Response to GL 93-04, Rod Control Sys Failure & Withdrawal of Rod Cluster Control Assemblies,10CFR50.54(f), Acceptable,Per 930729,0921 & s
ML18101A547
Person / Time
Site: Salem  PSEG icon.png
Issue date: 02/09/1995
From: Olshan L
Office of Nuclear Reactor Regulation
To: Eliason L
Public Service Enterprise Group
References
GL-93-04, GL-93-4, TAC-M86863, TAC-M86864, NUDOCS 9502210273
Download: ML18101A547 (3)


Text

(

I I

~ Mr. Leon R. Eliason. A Chief Nuclear Officerilll'President-Nuclear Business Unit Febru~ 9, 1995 Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

RESOLUTION OF GENERIC LETTER 93-04, "ROD CONTROL SYSTEM FAILURE AND WITHDRAWAL OF ROD CLUSTER CONTROL ASSEMBLIES, 10 CFR 50.54(f),"

SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (TAC NOS. M86863 AND M86864)

Dear Mr. Eliason:

By letters dated July 29, 1993, September 21, 1993, and January 27, 1995, you responded to Generic Letter (GL) 93-04.

In your response, you stated that you have already implemented the current order timing modification and the new current order surveillance test recommended by the Westinghouse Owners Group on Salem Unit Z and will implement these changes on Salem Unit 1 during the next refueling outage which is scheduled to begin in April, 1995.

You also stated that this new surveillance will be performed every refueling outage thereafter.

The NRC staff has reviewed the corrective actipns and schedules that you have committed to in response to GL 93-04 and found them acceptable.

Please inform us in writing when implementation is complete, or if your plans for implementing the modification and surveillance testing change. This completes our review of this matter.

TAC numbers M86863 and M86864 are closed.

Docket Nos. 50-272.

and 50-311 cc:

See next page DISTRIBUTION:

Docket File PUBLIC PDI-2 Rdg.

Svarga JZwo 1 i nski JStolz OFC PDI-2: LA NAME MO'Brien ({

21003~

9502210273 950209 PDR ADOCK 05000272 P

PDR Sincerely, Original signed by Leonard N. Olshan, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation MO' Brien LOl sh an TAlexion OGC ACRS(4)

JWhite, RGN-I RJones OFFICIAL RECORD COPY c

I UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555--0001 Mr. Leon R. Eliason Chief Nuclear Officer & President-Nuclear Business Unit Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, NJ 08038 February 9, 1995

SUBJECT:

RESOLUTION OF GENERIC LETTER 93-04, "ROD CONTROL SYSTEM FAILURE AND WITHDRAWAL OF ROD CLUSTER CONTROL ASSEMBLIES, 10 CFR 50. 54 ( f),"

SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (TAC NOS. M86863 AND M86864)

Dear Mr. Eliason:

By letters dated July 29, 1993, September 21, 1993, and January 27, 1995, you responded to Generic Letter (GL) 93-04.

In your response, you stated that you have already implemented the current order timing modification and the new current order surveillance test recommended by the Westinghouse Owners Group on Salem Unit 2 and will implement these changes on Salem Unit 1 during the next refueling outage which is scheduled to begin in April, 1995.

You also stated that this new surveillance will be performed every refueling outage thereafter.

The NRC staff has reviewed the corrective actions and schedules that you have committed to in response to GL 93-04 and found them acceptable.

Please inform us in writing when implementation is complete, or if your plans for

(

implementing the modification and surveillance testing change. This completes our review of this matter.

TAC numbers M86863 and M86864 are closed.

Docket Nos. 50-272 and 50-311 cc:

See next page Sincerely,

-µOld. uZt~

Leonard N. Olshan, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

/ I

.f

/

f, Mr. Leon R. El iason*9 Public Service Electric & Gas Company cc:

Mark J. Wetterhahn, Esqutre Winston & Strawn 1400 L Street NW Washington, DC 20005-3502 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. John Summers General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. J. Hagan Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Mr. Charles S. Marschall, Senior Resident Inspector Salem Generating Station U.S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, NJ 08038 D~. Jill Lipoti, Asst. Directo~

Radiation Protection Programs NJ Department of Environmental Protection and Energy CN 415 Trenton, NJ 08625-0415 Maryland Office of People's Counsel 6 St. Paul Street, 21st Floor Suite 2102 Baltimore, Maryland 21202 Ms. R. A. Kankus Joint Owner Affairs PECO Energy Company 965 Chesterbrook Blvd., 63C-5 Wayne, PA 19087 Mr. S. LaBruna Vice President - Nuclear Engineering Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Nucle~Generating Station, Units I and 2 Richard Hartung Electric Service Evaluation Board of Regulatory Commissioners 2 Gateway Center, Tenth Floor Newark, NJ.07102 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Frank X. Thomson, Jr., Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Ms. P. J. Curham MGR~ Joint Generation Department Atlantic Electric Company P.O. Box 1500 6801 Black Horse Pike Pleasantville, NJ 08232 Carl D. Schaefer External Operations - Nuclear Delmarva Power & Light Company P.0. Box 231 Wilmington, DE 19899 Public Service Commission of Maryland Engineering Division Chief Engineer 6 St. Paul Centre Baltimore, MD 21202-6806

/ I f

/