Mr. Leon R. Eliason
Chief Nuclear Officer and President
Nuclear Business Unit
Public Service Electric & Gas Company
Post Office Box 236
Hancocks Bridge, New Jersey 08038
Dear Mr. Eliason:
December 9, 1994
SUBJECT:
HOPE CREEK (94-24} AND SALEM (94-26) MOTOR-OPERATED VALVE
INSPECTION
This letter refers to the safety inspection conducted by Mr. L. Prividy and
others from October 17 to November 1, 1994, at the Hope Creek and Salem
Generating Stations. The inspection was focused on issues important to public
health and safety, specifically,- the PSE&G program being implemented in
response to NRC Generic Letter 89-10, "Safety-Related Motor-Operated Valve
(MOV} Testing and Surveillance." The preliminary results of this inspection
were discussed with Mr. J. Ranalli, Nuclear Mechanical Engineering Manager,
and other members of your staff on October 28, 1994. Additional discussion by
telephone occurred between the lead inspector and Mr. Ranalli on
November 1, 1994.
We concluded that satisfactory progress was being made toward completion of
the Hope Creek and Salem MOV program activities in accordance with your
commitments to GL 89-10. All dynamic testing has been completed at Hope
Creek; however, several issues remain open that preclude program closure.
Outstanding items include: (1) completion of your review, demonstrating design
basis capability, for all GL 89-10 MOVs at their current switch settings; and
(2) establishment of an acceptable long-term periodic verification program.
These issues are discussed in more detail in the enclosed report. After you
have completed your actions in response to these items, we request that you
contact us to discuss the most effective manner for accomplishing closure of
the Hope Creek GL 89-10 program .. Similarly, you are requested to contact us
after completing the Unit 2 refueling outage regarding closure of the Salem GL 89-10 programs .
9412230141 941209
ADOCK 05000272
0
p~
Mr. Leon R. Eliason
2
December 9, 1994
No response to this letter is required, and we appreciate your cooperation in
this regard.
Sincerely,
-*
Eugene M. Kelly, Chief
Systems Section
Division of Reactor Safety
Enclosure:
Combined Inspection Report Nos. 50-354/94-24,
50-272/94-26 and 50-311/94-26
Docket Nos. 50-354
50-272
50-311
cc w/encl:
J. J. Hagan, Vice President-Operations/General Manager-Salem Operations
S. LaBruna, Vice President - Engineering and Plant Betterment
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
P. J. Curham, Manager, Joint Generation Department,
Atlantic Electric Company
R. Hovey, General Manager - Hope Creek Operations
F. Thomson, Manager - Licensing and Regulation
J. T. Robb, Director, Joint Owner Affairs
A. C. Tapert, Program Administrator
A. Giardino, Acting Manager, Quality Assurance
B. Hall, Acting Manager, Nuclear Safety Review
R. Fryling, Jr., Esquire
M. J. Wetterhahn, Esquire
Consumer Advocate, Office of Consumer Advocate
William Conklin, Public Safety Consultant, Lower Alloways Creek Township
K. Abraham, PAO {2)
Public Document Room {PDR)
Local Public Document Room {LPDR)
Nuclear Safety Information Center {NSIC)
NRC Resident Inspector
State of New Jersey
State of Delaware
Public Service Commission of Maryland
..
Mr. Leon R. Eliason
3
bee w/encl:
Region I Docket Room (with concurrences}
J. Wiggins, DRS
R. Cain, Contractor, INEL
K. Gallagher
DRS Fil es (3)
bee w/encl: (Via E-Mail}
L. 01 sh an, NRR
W. Dean, DEDO
D. Moran, Project Manager, NRR
J. Stolz, PDl-2, NRR
M. Shannon, ILPB
M. Callahan, OCA
T. Scarbrough, NRR
M. Khanna, NRR
C. Casto, RII
J. Jacobson, Rill
T. Westerman, RIV
December 9, 1994
DOCUMENT NAME:
A:SAHC2624. INS
q)v~