Notice of Violation from Insp.Violation Noted:On 941024, Security Guard Permitted Two Persons to Enter Salem Unit 2 2C EDG Room W/O Verifying Proper Authorization Prior to Granting Access
ML18101A380
Person / Time
Site: Salem  
Issue date: 12/05/1994
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18101A379 List:
References
50-272-94-24, 50-311-94-24, NUDOCS 9412120178
Download: ML18101A380 (1)


Text

ENCLOSURE closed by an isolation valve, blind flange, or manual valve, or (2) be capable of being closed by an operable automatic containment isolation valve.

Contrary to the above, the licensee moved irradiated fuel from 11:38 p.m. on October 24, 1994, to 1:10 a.m. on October 25, 1994, with a release pathway from open service water vent valves in containment to open service water drain valves outside of containment.

This is a Severity Level IV violation (Supplement I).

o~

  • The NRC-Approved Artificial Island Security plan section 5.6 requires measures to insure control of access to vital areas at Salem Unit 2.

Post orders to control access to the Salem Unit 2 no. 2C Emergency Diesel Generator (EOG) required that the security guard verify that persons.entering the EOG room had proper authorization prior to granting access.

Contrary to the above, on October 24, a security guard permitted two persons to enter the Salem Unit 2 no. 2C EOG room without verifying proper authorization prior to granting access.

This is a Severity Level IV.violation (Supplement III).

Pursuant to the provisions of 10 CFR 2.201, Public Servi~e Electric & Gas Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region 1, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notic~). This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation:

(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2).the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked, or why such other action as may be proper not to be taken. Where good cause is shown, consideration will be given to extending the response time.

9412120178 941205 PDR ADDCK 05000272 Q

PDR