ML18100B212
| ML18100B212 | |
| Person / Time | |
|---|---|
| Site: | Salem, Hope Creek |
| Issue date: | 07/13/1994 |
| From: | Stone J Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 9407210238 | |
| Download: ML18100B212 (6) | |
Text
.* ' '
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001.
July 13, 1994 Docket Nos.
50-272, 50-311, and 50-354 LICENSEE:
Public Service Electric and Gas Company FACILITY:
Salem Nuclear Generating Station, Units 1 and 2, and Hope Creek Generating Station
SUBJECT:
MEETING
SUMMARY
, STATUS OF LICENSING ISSUES FOR SALEM, UNITS 1 AND 2 AND HOPE CREEK On June 30, 1994, a meeting was held at Artificial Island between Public Service Electric and Gas Company (the licensee} and the NRC staff to discuss the status of current licensing issues at Salem and Hope Creek.
These meetings allow the staff to be appraised of upcoming license change requests~
that are planned by the licensee and allows an opportunity to provide a stafus of staff reviews to the licensee.
In addition, the licensee provided their i priorfty for completion of reviews currently being performed.
Representatives of the State of New Jersey were present during the meeting.
During* this ~eetingt the status ~fall open issues, as contain~on the project
- managers report, was reviewed. During that review, the priority of the following specific issues and projected new submittals were identified by the licensee:
- 1.
Hope Creek
- High Priority Issues*
0 0
0 Diesel Generator Surveillance Requirements (LCR 93-23}, TAC No M89219.
Reduce Audit Frequencies and Review Requirements (LCR 94-05}, TAC No M89240.
- Type C Leak Rate Testing of Valves Terminating Below Torus Water Level (LCR 94-07}, TAC No M89426.
- New Submittals 0
0 0
Removal of Radiological Efflu~nt Technical* Specifications (GL 89-01}
Revise Requirements for Testing of Diesel Generator Fuel Oil Revise Snubber Inspections (GL 90-09}
940721023~ 6~866~72
~DR ADOC PDR _
-~
. --~
~t*
0 l f,\\1> J
0
- 2.
Salem Revise Action Statements for Loss of One Emergency Diesel or One Off-Site Power Source (GL 93-05).
- High Priority Issues 0
0 0
0 0
Revise Technical Specifications for 125 V DC Distribution System (LCR 93-27), TAC Nos. M88665/M88666.
Use of Vantage+ Fuel (LCR 94-07), TAC Nos. M88957/M88958.
Reduce Audit Frequencies and Review Requirements (LCR 94-10), TAC Nos. M89238/M89239.
Clarification of the Emergency Diesel Generator Hot Restart Retest Requirements (LCR 94-05), TAC Nos. M89317/M89318.
PORV & Block Valve Position Indication Functional Test (LCR 94-17)~
TAC Nos. M89788/M89789.
~
New Submittals 0
0 Removal of Radiological Effluent Technical Specifications (GL 89-
- 01)
Revise Snubber Inspections (GL 90-09)
In addition to the status of licensing actions, the status of safety issues,
- as listed in NUREG-1435, Supplement 3 was discussed.
The following issues were determined to be open at Salem or Hope Creek:
- 1. Seismic Qualification of Equipment (8105), Salem 1 and 2.
- 2.
Thermal Stress in Piping Connected To Reactor Cool.ant System (X808), Salem 1 and 2.
- 3.
Individual Plant Evaluations (8111), Salem 1, 2, and Hope Creek.
- 4. Motor-Operated Valve Testing And Surveillance (8110), Salem 1, 2, and Hope Creek.
- 5.
Reactor Vessel Structural Integrity (8120), Salem 1, 2, and Hope Creek.
- 6.
Rod Control System Failure and Withdrawal of RCCAs (L304), Salem 1 and 2.
- 7.
Individual Plant Evaluations for External Events (8118), Salem 1, 2, and Hope Creek.
- 8.
Loss of Oil in Rosemount Transmitters (8122), Salem 1, 2, and Hope Creek.
A list of attendees at the meeting is attached.
Enclosure:
List of Attendees cc w/enclosure:
See next page DISTRIBUTION w/enclosure:
- Docket Fi 1 e NRC & Local PDRs PDI-2 Reading WRussell/FMiraglia RZimmerman SVarga JCalvo CMi 11 er JStone MO' Brien OGC EJordan ACRS(lO)
WDean, 17G21 EWenzinger, RGN-I JWhite, RGN-I OFFICE NAME DATE PM:PDI-2 Original signed by:
James C. Stone, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation D:PDI-2 CMil 1 ere; 1 ;0 /94
.. 7.
Individual Plant Evaluations for External Events (Bl-l8l, Salem.1, 2, and Hope Creek.
- 8.
Loss of Oil in Rosemount Transmitters {8122), Salem 1, 2, and Hope Creek.
A list of attendees at the meeting is attached.
- . ~-
- .,{: -.~:**
- r-,-*1:-,<n:*-,,.,
I
~
- {*;
~*
~... ;: -
(....
Jame.s C. Stone,: S;enio.r;c:P.,r,oj~ti*~~nager Project Directorate 1~2
. _ Di v,i stpn,:qJ.Re_aQt<>t;"Jf;r:~je<;_~s.- -..;.. l/_U.
Office of Nuclear Reactor Regulation
Enclosure:
- I t
-~ 'i.....-
,,.. r Li st of Attendees * --*..
cc w/enclosure:
~.
See next page *
~ y~
I
~
. *.-._, (
- .... :*: s * -i
~-* :._.:,n s.
- . 1
~ -, ":J 1 :"\\ *:_;
" -~
- ':1:
I
- *J J
,. I',
. ""I I)
', \\j : '_! ! ! '-
1 James Stone Suren Singh Tom Kolesnik
~'
Robert J. Malone David A. -Smith *
.., :*t:
LIST OF ATTENDEES 06/30/94 Meeting NRC - PSE&G Status* of Licensing Issues ENCLOSURE
..**** 1t 1 *1
- i ;.*.*.
'. - -~ ; ; -. --.
~..... '
. *ORGANIZATION -*
- NRC/ONRR NJ DEPE.
TITLE Sr. Project Manager Nuclear Engineer NJ DEPE
- . - **: -.;:-_*-<:.. Nucle.ar Engineer PSE&G NL&R
,,,~ *,-,i-:* Sr *. <Staff*~Engi:.neer PSE&G NL&R Principal Engineer Nuclear Licensing 1
1 l
(
. ~.
Public Service Elect~. & Gas Company cc:
Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street NW Washington, DC 20005-3502 Rich~rd Fryling, Jr., Esquire Law Department - Tower SE*
80 Park Place Newark, NJ 07101 Mr. J. Hagan, Acting General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. J. Hagan Vice President -:Nuclear Operations Nuclear Department P.O. Box 236,.
- Hancocks Bridge, New Jersey 08038 Mr. Charles S. Marschall, Senior Resident Inspector Salem Generating Station U.S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, NJ 08038
- or. Jill Lipoti, Asst.. Director Radiation Protection Programs NJ Department of Environmental Protection and Energy CN 415 Trenton, NJ 08625~0415 Maryland People's Counsel American Building, 9th Floor 231 East Baltimore Street Baltimore, Maryland 21202 Maryland Mr. J. T. Robb, Director Joint Owners Affairs Philadelphia Electric Company 955 Chesterbrook Blvd., 51A-13 Wayne, PA 19087 Mr. S. LaBruna Vice President - Nuclear Engine~ring Nuclear Department P.O. Box 236
. Hancocks Bridge, New Jersey 08038 Salem Nucle~enerating Station, Units 1 a~~.
Richard Hartung Electric Service Evaluation Board of Regulatory.Commissioners**
2 Gateway Center, Tenth Floor Newark, NJ 07102
.'f*-**
Regional Administrator, Region I U;,S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways.Creek Towr:iship c/o Mary.a; Henderson"i':El1~rk::.*:':*'
. Munjcipal. Building, P.O. Box 157 Hancocks Bridge, NJc~08038 Mr. Frank X. Thomson, Jr., Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 080311 Mr. David Wersan
.Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Ms. P.-J; Curham MGR. Joint Generation Department :
Atlantic Electric Company P.O. Box 1500 6801 Black Horse Pike Pleasantville, NJ 08232 Carl D. Schaefer External Operations - Nuc*lear Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Public Service Cammi ssfon of Engineering Division Chief Engineer 6 St. Paul Centre
- Baltimore, MD 21202-6806 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric and Gas Company Post Office Box 236 *
~ancocks Bridge, New Jersey 08038