Forwards Insp Repts 50-272/94-11,50-311/94-11 & 50-354/94-09 on 940327-0430.Violations Noted.Violations Involve Failure to Follow procedures.Non-cited Violation Re Failure to Monitor Reactor Water Chemistry Also Noted
ML18100B134
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 06/15/1994
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML18100B135 List:
References
NUDOCS 9406220084
Download: ML18100B134 (3)


See also: IR 05000272/1994011

Text

Docket Nos. 50-272

50-311

50-354

Mr. Steven E. Miltenberger

Vice President and Chief Nuclear Officer

Public Service Electric and Gas Company

P.O. Box 236

Hancocks Bridge, NJ 08038

Dear Mr. Miltenberger:

-JUN I 5 \\(j~~-

("

SUBJECT:

SALEM AND HOPE CREEK RESIDENT INSPECTION NOS. 50-272/94-11;

50-311/94-11; 50-354/94-09

The enclosed report documents an inspection for public health and safety, conducted by Mr.

C. Marschall, Senior Resident Inspector_and other m~mbers of the NRC resident and

regional staff at the Saleni and Hope Creek Nuclear Generating Stations for the period

between March 27, 1994 and April 30, 1994. The inspectors discussed the findings of this

inspection with Messrs. J. Hagan and R. *Hovey of your staff.

Based ori the results of this inspection, it appears that a number of your activities w~re not

conducted in full oompliance with NRC requirements, as set forth in the Notice of Violation.

These activities involved at least three occurrences of failure to follow procedures. In

accordance with 10 CFR 2.790 of the NRC's "Rules of Practice, a copy of this letter and its

enclosures will be placed in the NRC Public Document Room. The response~~ directed by

this letter and the enclosed Notice are not subject to the clearance procedures of the Office of

Management and Budget as required by the Paperwork Reduction Act of 1980, Public Law

No. 96.511.

, In addition, the inspectors Identified a non-cited violation at Hope Creek involving failure to

monitor reactor water chemistry in accordance with the frequency required by Technical

Specifications.

Your cooperation with us is appreciated.

9406220084 940615

PDR

ADOCK 05000272

Sincerely,

ORIGINAL SIGNED BY

EDWARD C. WENZINGER .

. Edward C. Wenzinger, Chief

Projects Branch No. 2

Division of Reactor Projects

______ ___

G_

PDR

~I

i

I {I

-*

JUN l _ 5 199L1

Mr. Steven E. Miltenberger

2

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Ip.spection Report Nos. 50-272/94-11; 50-311/94-11; 50-354/94-09

cc w/encl:

S. LaBruna, Vire President - Nuclear Engineering

J. Hagan, Vice President-Operations/General Manager - Salem Operations

R. Hovey, General Manager - Hope Creek Operations

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

F. Thomson, Manager, Licensing and Regulation

J. Robb, Director, Joint Owner Affairs

A. Tapert, Program Administrator

R. Swanson, General Manager - QA and _Nuclear Safety Review

M. Wetterhahn, Esquire

R. Fryling, Jr., Esquire

.

_

P. J. Curham, Manager, Joint Generation Department, Atlantic Electric Company

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

K. Abraham, PAO (2)

Public Document Room (PDR)

LoCal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

JUN I 5 1994

Mr. Steven E. Miltenberger

3

bee w/encls:

Region I Docket Room (with concurrences)

Kay Gallagher, DRP

bee w/encls via E-Mail:

J. Stone, NRR

S. Dembek, NRR

v. Mccree, OEDO

C. Miller, PDI-2, NRR

M. Shannon, ILPB

~ I

94

~enzinger

OFFICIAL RECORD COPY