Docket Nos. 50-272
50-311
50-354
Mr. Steven E. Miltenberger
APR 2 6 199d
Vice President and Chief Nuclear Officer
Public Service Electric and Gas Company
P.O. Box 236
.
Hancocks Bridge, NJ 08038
Dear Mr. Miltenberger:
SUBJECT:
- SALEM AND HOPE CREEK RESIDENT INSPECTION NOS. 50-272/94-06;
50-311/94-06; 50-354/94~04.
.
The enclosed report documents an inspection for public health and safety conducted by Mr.
C. Marschall, Senior Resident Inspector, and other members of the NRC staff at the Salem
and Hope Creek Nuclear Generating Stations for the period between February 20, 1994 and
March 26, 1994. The inspectors discussed the findings of this inspection with Messrs. J.
Hagan and R. Hovey of your staff.
Based on the results of the inspection, it appears that some of your activities were not
conducted in full c:ompliance with NRC requirements, including one cited violation as set
forth in the Notice of Violation. In accordance with 10 CFR 2.790 of the NRC's "Rules of
Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document
Room. The responses directed by this letter and the enclosed Notice are not subject to the
clearance procedures of the Office of Management and Budget as required by the Paperwork
Reduction Act of 1980, Public Law No. 96.511.
In addition, the inspectors noted one non-cited violation concerning elevated oxygen levels in
the waste gas decay tank at Salem Unit 1. The details of this issue are described within the
enclosed report.
This letter also acknowledges receipt of your March 10, 1994 response to a Salem violation
cited in NRC Inspection Report 50-272 and 311/93-27. Those corrective actions will be
reviewed in a future inspection of your program.
Your cooperation with us is appreciated.
0. ~ ('J'1" 1
'" v
\\ .. ""
9405040013 940426
ADOCK 05000272
Q
Sincerely,
omGINAL SIGNED BY
EDWARD C. WENZINGER
Edward C. Wenzinger, Chief
Projects Branch No. 2
Division of Reactor Projects
-*
.
~-
'
APR 2 6 1994
Mr. Steven E. Miltenberger
2
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Inspection Report Nos. 50-272/94-06; 50-311/94-06; 50-354/94-04
cc w/encl:
S. LaBruna, Vice President - Nuclear Engineering
J. Hagan, Vice President-Operations/General Manager - Salem Operations
R. Hovey, General Manager - Hope Creek Operations
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
F. Thomson, Manager, Licensing and Regulation
J. Robb, Director, Joint Owner Affairs
A. Tapert, Program Administrator
R. Swanson, General Manager - QA and Nuclear Safety Review
M. Wetterhahn, Esquire
R. Fryling, Jr., Esquire
P. J. Curham, Manager, Joint Generation Department, Atlantic Electric Company
Consumer Advocate, Office of Consumer Advocate
William Conklin, Public Safety Consultant, Lower Alloways Creek Township
K. Abraham, PAO (2)
F. Bower, DRS
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
..
..
APR 2 6 199'1
Mr. Steven E. Miltenberger
3
bee w/encls:
Region I Docket Room (with concurrences)
bee w/encls via E-Mail:
J. Stone, NRR
S. Dembek, NRR
V. Mccree, OEDO
C. Miller, PDI-2, NRR
M. Shannon, ILPB