ML18100A992
| ML18100A992 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 04/06/1994 |
| From: | Meyer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Miltenberger S Public Service Enterprise Group |
| References | |
| NUDOCS 9404120067 | |
| Download: ML18100A992 (3) | |
Text
Docket Nos; 50-272 50-311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric and Gas Company P. 0. Box 236 Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
.APR 6 1994
SUBJECT:
-REQUALIFICATION PROGRAM INSPECTION-SALEM In a telephone conversation on April 5, 1994, Mr. J. Lloyd and Mr. P. Bissett made arrangements for the NRC to inspect the licensed operator requalification program at the Salem Nuclear Generating Station. The inspection is planned for the week of May 23, 1994, which coincides with your regularly-scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program..
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary. to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by May 16, 1994. Mr. Lloyd has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
The request for requalification examination material is covered by the Office of Management _
and Budget (OMB) Clearance Number 3150-0101, which expires on October 31, 1995. The estimated average burden is 4.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> per response, including gathering, copying, and mailing the required material. Send comments regarding this burden estimate or any other
- aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources *Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory, Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C. 20503.
9404120067 940406 PDR ADOCK 05000272 V
.,,}
..;._~I..,, J' l,j"
Mr. Steven E. Miltenberger 2
APR 6 1994 Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact me at (610) 337-5211.
Sincerely, l~ZJ::~v
(} ~lenn W. Meyer, Chief cc:
BWR & PWR Sections, Operations Branch Division of Reactor Safety J. J. Hagan, Vice President-Operations/General Manager-Salem Operations S. LaBruna, Vice President - Engineering and Plant Betterment C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
R. Hovey, General Manager - Hope Creek Operations F. Thomson, Manager, Licensing and Regulation R. Swanson, General Manager - QA and Nuclear Safety Review J. Robb, Director, JointOwner Affairs A. Tapert, Program Administrator J. Lloyd, Training Manager R. Fryling, Jr., Esquire M. Wetterhahn, Esquire P. J. Curham, Manager, Joint Generation Department, Atlantic Electric Company Consumer Advocate, Office of Consumer Advocate William Conklin, Public Safety Consultant, Lower Alloways Creek Township K. Abraham, PAO (24) SALP, AIT, Special Insp. Reports and (2) Inspection Reports Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New Jersey
Mt. Steven E. Miltenberger bee:
Region I Docket Room (with concurrences)
Kay Gallagher, DRP P. Bissett, Chief Examiner, DRS OL Facility File DRS File(s)
RI:DRS..,,JA.--
Bissett {jlft7 4/~/94 RI:DRS Meyr,J 41,/94 3
APR 6 1994 OFFICIAL RECORD COPY A:SAREQUAL.LTR