Do'cket Nos. 50-272, 50-3A and 50-354 Mr. Steven E. Miltenberger Vic*e President and Chief Nuclear Officer Public Service Electric & Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
March 22, 1.
SUBJECT:
REQUEST FOR WITHDRAWAL, INTEGRATED SCHEDULE PROGRAM FOR MAJOR MODIFICATIONS, HOPE CREEK GENERATING STATION AND SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (TAC NOS. M85899, M85900, AND M85901)
On February 26, 1993, Public Service Electric and Gas Company (PSE&G) submitted a proposed Integrated Scheduling Program (ISP) for major modifications at Hope Creek and Salem.
The proposed ISP was based on the NRC's Final Policy Statement on Integrated Schedules (57 FR 43886).
By letter dated March 4, 1994, PSE&G notified the NRC that the request for approval of the ISP was being withdrawn.
Cited in the_ letter as the bases for withdrawal was an improved project plannin~, scheduling and control process, and the initiation of the Cost Beneficial Licensing Action Program.
Therefore, the staff accepts your request to withdraw the ISP.
Further staff action will not be taken to review the program.
(
-~40330003394o32~f~-.. -]
PDR ADOCK 05000272.
p
.. PDR I
'-~-*
~-
__ 1 __
cc:
See next page DISTRIBUTION Docket File JStone MO' Brien OGC Sincerely,
/SI James C. Stone, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation DWigginton CCraig NRC &_Local PDRs PDI-2 Reading SVarga JCalvo CMi 11 er ACRS ( 10)
EWenzinger, RGN-I JWhite, RGN-I ffi\\ifi}jl'.i'fl f'.e[3f,l ;r ffhl©Ji\\A"G" Mfilfrta~ tJ°'fil\\)k\\t ~~~tlla Q OFFICE PDI-2 PM NAME DATE 25002p
~'
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555--0001 Docket Nos. 50-272, 50-311 and 50-354 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric & Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
March 22, 1994
SUBJECT:
REQUEST FOR WITHDRAWAL, INTEGRATED SCHEDULE PROGRAM FOR MAJOR MODIFICATIONS, HOPE CREEK GENERATING STATION AND SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (TAC NOS. M85899, M85900, AND M85901)
On February 26, 1993, Public Service Electric and Gas Company (PSE&G) submitted a proposed Integrated Scheduling Program (ISP) for major modifications at Hope Creek and Salem.
The proposed ISP was based on the NRC's Final Policy Statement on Integrated Schedules (57 FR 43886).
By letter dated March 4, 1994, PSE&G notified the NRC that the request for approval of the ISP was being withdrawn.
Cited in the letter as the bases for withdrawal was an improved project planning, scheduling and control process, and the initiation of the Cost Beneficial Licensing Action Program.
Therefore, the staff accepts your request to withdraw the ISP.
Further staff action will not be taken to review the program.
cc:
See next page
- sincerely,
~t:e, ~roject Manager Project Directorate 1-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
l Mr. Steven E. Miltenberger Public Service Electric & Gas Company cc:
Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street NW Washington, DC 20005-3502 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. Calvin A. Vondra General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. J. Hagan Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Mr. Charles S. Marschall, Senior Resident Inspector Salem Generating Station U.S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs NJ Department of Environmental Protectio~ and Energy CN 415 Trenton, NJ 08625-0415 Maryland People's Counsel American Building, 9th Floor 231 East Baltimore Street Baltimore, Maryland 21202 Mr. J. T. Robb, Director Joint Owners Affairs PECO Energy Company 955 Chesterbrook Blvd., SlA-13 Wayne, PA 19087 Salem Nuclear Generating Station, Units 1 and 2, and Hope Creek Generating Station Richard Hartung Electric Service Evaluation Board of Regulatory Commissioners 2 Gateway Center, Tenth Floor Newark, NJ 07102 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Frank X. Thomson, Jr., Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Mr. J. A. Isabella MGR. - Generation Department Atlantic Electric Company P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Carl D. Schaefer External Operations - Nuclear Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Public Service Commission of Maryland Engineering Division Chief Engineer 6 St. Paul Centre Baltimore, MD 21202-6806
Mr. Steven E. Miltenberger Public Service Electric & Gas Company cc:
Hope Creek Resident Inspector U.S. Nuclear Regulatory Commission Draw~r I Hancocks Bridge, New Jersey 08038 Mr. R. Hovey General Manager - Hope Creek Operations Hope Creek Generating Station P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Nuclear Generating Station, Unit I and 2, and Hope Creek Generating Station Mr. S. LaBruna Vice President - Nuclear Engineering Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038