Forwards Insp Rept 50-272/93-25 on 931025-29.No Violations Noted
ML18100A732
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/26/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML18100A734 List:
References
NUDOCS 9312070043
Download: ML18100A732 (3)


See also: IR 05000272/1993025

Text

, ..

Docket No. 50-272

Mr. Steven E. Miltenberger *

Vice President and Chief Nuclear Officer

Public Service Electric and Gas Company

P. 0. Box 236

Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

  • NOV 2 6 1993

SUBJECT: NRC REGION I INSPECTION REPORT NO. 50-272/93-25 *

. This letter transmits the findings of the announced safety inspection, conducted by

Mr. P. Patnaik of this office, from October 25 through October 29, 1993, at the Salem.

Nuclear Generating Station, Unit 1, Hancocks Bridge, New Jersey.

The inspection was directed at areas important to public health and safety, and focused on

reviews of the inservice inspection program, the steam generator eddy current examination.

program, sample data from the erosion/corrosion monitoring of components, and the steam

generator primary- to-secondary leakage monitoring program. The results of this inspection

were discussed with the members of your staff at the exitmeeting on October 29, 1993.

The inspector found the steam generator leakage monitoring program, as implemented, with

procedures for detection of leakage and the operator's actions in the event of a primary-to-

seeondary leak, to be generally effective. Notwithstanding the limits on power reduction

and/or shutdown, the operations procedure, however, does not address appropriate actions

against any step increase in primary-to-secondary leakage below the shutdown margin, as

seen in some of the recent tube failures at other plants.

9312070043 931126 r

PDR

ADOCK 05000272

G

PDR ~.

~o(

/

It (

NOV 2 6 1993

. Public Service Electric

2

and Gas Company .

The inservice inspection and the eddy current examination activities were generally planned,

controlled, and documented properly. The erosion/corrosion ~ta indicated proper

implementation of your updated program. No violations were identified during this

inspection, hence, no response to this letter is required.

Sincerely,

~~-f

Jacque P. Durr, Chief

Engineering Branch

Division of Reactor Safety.

Enclosure: NRC Region I Inspection Report No. 50-272/93-25

cc w/encl:

J. J. Hagan, Vice President, Nuclear Operations

C. Schaefer, External Operations - Nuclear, Delmar\\ra Power & Light Co .

. C. Vondra, Geneial Manager -*Salem Operations

R. Hovey, General Manager - Hope Creek Operations

F. Thomson, Manager, Licensing* and Regulation

R. SwanSC>n, General Manager - QA and Nuclear Safety Review

J. Robb, Director, Joiiit Owner Affairs *

A. Tapert, Program Administrator

R. Fryling, Jr., Esquire

M. Wetterhahn, Esquire

P. J. Curham, Manager, Joint Generation Department,

Atlantic Electric Company *

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

K. Abraham, PAO (2)

  • Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

Public Service Electric

and Gas Company

bee w/encl:

3

Region I Docket Room (with concurrences)

bee w/encl: (Via E-Mail)

J. Stone, NRR

S. Dembek, NRR

V. McCree, OEDO

L. Nicholson, Acting PDI-2, NRR

RI: DRS

~k

11/22f93

/

Rl:DRS

Durr

(' //z, ;:,,, J /3 {J .

11/71/93

OFFICIAL RECORD COPY

A:SA19325.INS

NOV

J 1993

NOV 2 6 1993