ML18100A708
| ML18100A708 | |
| Person / Time | |
|---|---|
| Site: | Salem, Hope Creek |
| Issue date: | 11/09/1993 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Miltenberger S Public Service Enterprise Group |
| Shared Package | |
| ML18100A709 | List: |
| References | |
| NUDOCS 9311190244 | |
| Download: ML18100A708 (3) | |
See also: IR 05000272/1993024
Text
Docket Nos. 50-272
50-311
50-354
Mr. Steven E. Miltenberger
9 1993
Vice President and Chief Nuclear Officer
Public Service Electric and Gas Company
P. 0. Box 236
Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
SUBJECT:
MOTOR-OPERATED VALVE INSPECTION AT SALEM/HOPE CREEK
POWER STATIONS, INSPECTION REPORT NOS. 50-272/93-24,
50-311193-24 AND 50-354/93-26
This letter refers to an announced NRC safety inspection conducted by Mr. T. Kenny on
October 5-8, 1993, at Salem/Hope Creek Power Stations, to address clarification or
improvement items discussed in Table 1 of NRC Inspection Report Nos. 50-272/92-80 and
50-311/92-80. The results of this inspection were discussed with Mr. J. Ranalli, Nuclear
Mechanical Engineering Manager, of your staff on October 8, 1993.
The inspector examined procedures, representative records, interviewed personnel and
overall observed areas important to public health and safety. The inspection focused mainly
on the motor-operated valve (MOY) program, and the implementation of program
enhancements developed in response to previous NRC team inspections in this area. This
program implementation inspection was used to confirm continuing progress toward the
scheduled program completion date and to assure satisfactory implementation of your
commitments to regulatory requirements. Several items were satisfactorily closed, including
violations, a deviation, and unresolved items (delineated in the enclosed report). We found
your MOV program implementation satisfactory and did not identify any new items .
170046
9311190244 931109
ADOCK 05000272
a
- PDR
9 1993
Public Service Electric
and Gas Company
2
No response to this letter is required. Thank you for your cooperation.
Sincerely
Jacque P. Durr, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
NRC Region I Inspection Report Nos. 50-272/93-24, 50-311/93-24, and
50-354/93-26
cc w/encl:
J. J. Hagan, Vice President, Nuclear Operations
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
C. Vondra, General Manager - Salem Operations
R. Hovey, General Manager - Hope Creek Operations
F. Thomson, Manager, Licensing and Regulation
R. Swanson, General Manager - QA and Nuclear Safety Review
J. Robb, Director, Joint Owner Affairs
A. Tapert, Program Administrator
R. Fryling, Jr., Esquire
M. Wetterhahn, Esquire
P. J. Curham, Manager, Joint Generation Department, Atlantic Electric Company
Consumer Advocate, Office of Consumer Advocate
William Conklin, Public Safety Consultant, Lower Alloways Creek Township
K. Abraham, PAO (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
Public Service Electric
and Gas Company
bee w/encl:
9 1993
3
Region I Docket Room (with concurrences)
bee w/encl: (Via E-Mail)
J. Stone, NRR
S. Dembek, NRR
V. McCree, OEDO
M. Boyle, Acting PDI-2, NRR
T. Scarborough, NRR
RI:DRS
Kenny%
11/ .3 /93
11(~ /93
RI:DRS
Durr
1111 /93
OFFICIAL RECORD COPY
A:SAHC2426.INS