ML18100A061
| ML18100A061 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/03/2018 |
| From: | Lacal M Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| 102-07677-MLL/MEK | |
| Download: ML18100A061 (3) | |
Text
Oaps ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED 102-07677-MLL/MEK April 3, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Docket No. STN 50-528; 50-529; 50-530 and 72-44 License No. NPF-41; NPF-51; NPF-74 10 CFR 50.54(p)
MARIA L. LACAL Senior Vice President Nuclear Regulatory and Oversight Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mall Station 7605 Tel 623.393.6491 PVNGS Security Plan, Training and QuaUfication Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 21 Pursuant to 10 CFR 50.54(p), Arizona Public Service (APS) hereby submits Revision 21 of the PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation (ISFSI) Security Program (hereafter the Plan). This revision, implemented on February 6, 2018, incorporates Security Frequently Asked Question 12-05, NEI 03-12, Rev. 7 -
Contingency Event #21, which provides informational instruction on response(s) to a suspected/confirmed cyber-attack. These changes*are described further in the enclosures.
APS has evaluated the Plan changes in accordance with 10 CFR 50.54(p) and concluded that the revision does not result in a decrease in effectiveness of the Plan.
No commitments are being. made to the NRC by this letter.
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Should you have questions concerning this matter, please contact Kevin Martinez, Security Operations Department Leader, at 623-393-2731.
Sincerely,
~.,: c;>?{~ J___
MLL/MEK ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED A member of STARS Alliance LLC Callaway* Diablo Canyon* Palo Verde* Wolf Creek SDol
- J ;vi_{, 5 z_(p
- U /(. /._
- Jtvt.S5
102-07677-MLL/MEK April 3, 2018 ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED USNRC Document Control Desk PVNGS Security Plan Page 2
Enclosures:
- 1) Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 21
- 2) 10 CFR 50.54(p) Table of Changes cc:
K. M. Kennedy S. P. Lingam C. A. Peabody M. L. Chambers NRC Region IV Regional Administrator NRC NRR Project Manager for PVNGS NRC Senior Resident Inspector for PVNGS Sr. Physical Security Inspector, R-IV/DRS/PSB1 ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED
,~,
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED ENCLOSURE 1 Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 21 ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED