Proposed Tech Specs Revising TS Section 4.6.4.2,to Ensure That Same Surveillance Testing,W/Same Acceptance Criteria,Be Performed for Both Units Hydrogen Recombiners
ML18096B206
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/18/1993
From:
Public Service Enterprise Group
To:
Shared Package
ML18096B205 List:
References
NUDOCS 9301250071
Download: ML18096B206 (8)


Text

-

9301250071 930118 PDR ADOCK 05000272 P

PDR Ref: I.CR 91-07 ATmClIMENI' 1

PROPOSED CHANGE TO THE TECHNICAL SPECIFICATIONS FACILITY OPERATING LICENSES DPR-70 AND DPR-75 SALEM GENERATING STATION DOCKET NOS. 50-272 AND 50-311 I. DESrnJPricw OF 'IHE ClJANGE ref: I.CR 91-07

'As shown on the marked-up Technical Specifications (TS) pages in Attachment 2 I PSE&G requests that EIECI'RIC HYDROGEN RECXXvIBINERS, Section 4. 6. 4. 2 for both Salem Units be revised.

i:I.

RE1\\SOO' FOR 'IHE ClJANGE

'Ihe proposed changes make the subject TS sections the same for both Salem units. 'Ihis change will ensure that the same SUrveillance testing, with the same a~ce criteria, is perfo:r:med for both units' hydrogen recambiners.

'Ihis change uses the more conservative and correct requirements from both Salem units' surveillance requirements and Combines them into a carmnon set of requirements.

The addition of an asterisked* NOI'E will provide, for those times when the more demanding 18 month recambiner

  • functional test. and the month 6 month recambiner functional test fall due at, or near, the same ti.me, that
  • perf onnance of the 18 month* surveillance will satisfy the 6 month surveillance as well.
m..JUS'l'll'ICATIW FOR 'IHE ClJANGE

'Ihis change 'is administrative in nature, making the subject TS sections the same for both Salem units. CUrrently, the 18 month surveillance functional test described in Salem Unit 1 TS 4.6.4.2.b.3 is not included in Unit 2 TS.

  • However, the station performs the same testing on both units.

To provide requirements and acceptance criteria upon whit:h to base test procedures. for Unit 2, this proposed change would add the Unit 1 requirement to Unit 2 TS.

Additionally, Unit 1 TS 4.6.4.2.a is not consistent with that of Unit 2.

'!he wording and techniques de5cribed in* unit 2 TS 4.6.4.2.a are more correct and should, therefore, be reflected in the Unit 1 specification.

'As stated above, these changes would make both Salem Units' TS read the same for the hydrogen recambiner equipment and result in a more conservative specification.

~

  • ~

~

IV.

10CFR50. 92 SIGNIFICANr HM.ARIE <XmIIERATIQl ANALYSIS PSE&G has, pursuant to :ioCFR5o. 92, reviewed the proposed arilendment to detennine whether our request involves a significant hazards consideration.

We have detennined that:

1. 'lbe g:>eration of*the Salem Generat:im station (SGS) in acxxn:dance with the PP* a:Bl d1ame will not involve a significant irK:rease in the prcilability or oansequerp:!S of an accident previously evaluated.

The proposed amendment does not involve a physical or procedural change for any structure, carrponent, or system that affects the probability or consequences of any accident or malfunction of equipment inportant to safety previously evaluated in the Updated Final Safety Analysis Report (UFSAR).

'!he testing in existing Unit 1 Specification 4.6.4.2.b.3 is already administratively required and perfo:i:med for Unit 2.

These changes will merely make the 'IS require that testing which is already being perfo:nned.

'!he change to 'IS 4. 6. 4. 2. a is cosmetic for* Unit 2 and an improvement for Unit 1. '!his change would add more conservative sw:veillance requiren\\ents. Further, the asterisked NOI'E will reduce unnecessary, duplicative, cycling of recombiner equipment bY taking credit for 18 month testing satisfying 6 month testing requirements when both tests *fall due at roughly the same time.

2. 'lbe operation of the Salem Generat:im station (SGs) in ~

with the proposed dlarge will not create the possibility of a new or different k:ini of accident from any previously evaluated.

There are no physical changes to the plant or to the manner in which the plant is operated involved in the proposed revision. The proposed change will require additional testing (18 month functional testing) in the Unit 2 'IS and.

make a minor correction to the 6 month functional test requirement in Unit 1 'IS for consistency with the existing Unit 2 test description.

3. 'Die operation of the Salem Gene:rat:im station (SGS) in acxxn:dance *with the pror;xsed dlarge does not involve a significant reduction in a manrin of safet;y.

The proposed revision will add an 18 month test requirement on Unit. 2 and and refine the wordirig of the Unit* 1 six month testing to match that of Unit 2.

The proposed changes add clarity and consistency to the specifications which will lessen the likelihood of error in perf onning sw:veillance testing for both Salem units. The changes, being fundamentally administrative, have no impact upon margins of safety.

==

Conclusion:==

Based upon the foregoing evaluation, *we have detennined that this proposed change does not involve a Significant-Hazards Consideration.

ATl2\\aJMENl' 2 INSERIS AND MARKEIHJP PAGES Ref: I.CR 91-07

INSERl' 1 INSERl' 2 and (upon reaching 700°F) verifying that, arter increasing the power setting to maxintum power for 2 minutes, the power meter reads ~ 60 kW.

INSERl' 3

3. Verifying, during a recombiner system functional test, that the heater sheath temperature increases to ~ 1200°F within 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and is maintained for at least 4.hours.

INSERl' 4.

  • NOI'E:

The requirements of this 6 month system functional test can be met by satisfacto:cy completion of the 18 month system functional test in Specification 4.6.4.2.b on those occasions where :perfonnance of both tests would be required at or near the same time..

1-

, I INSERT 1 j e

CONTAINMENT SYSTEMS ELECTRIC HYDROGEN RECOMB INERS -

1..J LIMITING CONDITION FOR OPERATION 3.6.4.2 Two independent containm~nt hydrogen *recombiner systems sha11 be OPERABLE.

APPLICABILITY:

MODES 1 and 2.

ACTION:

With one hydrogen recombiner system inoperable, restore the inoperable system to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.4.2 Each hydrogen recombiner system shall be demonstrated OPERABLE:

a.

At least once per 6'months by verifying during a recombiner system functional test that the minimum heater sheath

~eases to > 700°F within 90 minutes...

~~

b.

At least once per 18 months by:

1.

Performing a CHANNEl. CALIBRATION of all recombiner instru-mentation and control circuits.

2.

Verifying through a visual examination that there is no evidence of abnonnal conditions within the recombiners (i.e., loose wiring or structural connections, deposits of foreign materials, etc.)

3...

Ver't.1'f"f"** dur.t ng:::... NCuaClnet. - systm:.f.um:tiana.l:. test.. tha:t....

the heater sheath temperature increases tO?. 1200°F within 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and is maintained for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

V1rifying the integrity of all h1at1r electrical circuits by performing a continuity and resistAnca to ground tast following the abov1 required functional test. The resistance to ground for any heater phase shall b1.!. 10,000 ol'ms.

INSERT SURVEILLANCE REQUIREMENT NO. 4 (FROM NEXT PAGE)

I INSERT 41

  • SALEM - UNIT 1 3/4 6-19

".'"t THIS ENTIRE PAGE DELETED Verifying the integrity of all heater electrical circuits by performing a continuity and resistance to ground test following the above required functional test. The resistance to ground for any heater phase shall be:!. 10,000 ohms.

-- MOVE THIS REQUIREMENT TO PREVIOUS PAGE AS MARKED

\\

3/4 6-20

CONTAINMENT SYSTEMS ELECTRIC HYDR~ECOMBINERS - W LIMITING CONDITION FOR OPERATION 3.6.4.2 Two independent containment hydrogen recombiner systems shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTION:

With one hydrogen recombiner system inoperable, restore the inoperable system to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

INSERT 2 SURVEILLANCE RE UIREMENTS I

I 4.6.4.2 IMSERT 1

a.

Each hydrogen recombiner system shall be

~

At least once per 6 months by verifying ombiner system ature increases functional test that the minimum heater sheath temp 700°F within 90 minutes T~~~~~~~~V'

b.

At least once per 18 months by:

1.

Performing a CHANNEL CALIBRATION of all recombiner instrumentation and control circuits.

2.

Verifying through a visual examination that there is no evidence of abnormal conditions within the*recombiners enclosure ti.e., loose wiring or structural connections, deposits of fore_ign materials, etc.)

I INSERT 31 t-----ti Verifying the integrity of all heater electrical circuits bv performing a resistance to ground test following the above required functional test.

The resistance to ground for an*1 heater phase shall be greater than or equal to 10,000 ohms.

IIMSERT 41 SALEM - UNIT 2 3/4 6-22