Monthly Operating Rept for August 1992 for Salem 2
ML18096A977
Person / Time
Site: Salem 
Issue date: 08/31/1992
From: Fest J, Shedlock M
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9209180358
Download: ML18096A977 (8)


Text

I

,OPS~G

.P~blic Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Generating Station September 11, 1992 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In compliance with Section 6o9ol.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating reports for the month of August 1992 are being sent to you.

RH:pc Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Safety Related Maintenance 10CFR50.59 Evaluations Operating Summary Refueling Information 1

yours,
  • ~

General Manager -

Salem Operations cc:

Mr. Thomas T. Martin Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19046 Enclosures 8-1-7.R4

?10013 liiE! Energy peopl~

9209180358 PDR ADOCK R

920831 05000311 PDR 95-2189 (10M) 12-89

.ERAGE DAILY UNIT POWER LE~

Docket No.:

50-311 Unit Name:

Salem #2 Date:

09/10/92 Compl'eted by:

Mark Shedlock Telephone:

339-2122 Month August 1992 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET)

(MWe-NET) 1 1047 17 1098 2

1094 18 1088 3

1077 19 1105 4

1092 20 1105 5

1090 21 1065 6

1079 22 1102 7

1112 23 1098 8

1112 24 1098 9

1056 25 1103 10 1083 26 1098 11 1085 27 1109 12 1087 28 1087 13 1097 29 1092 14 1099 30 1090 15 1075 31 1107 16 1107 P. 8.1-7 Rl

~*

I OPERATING DATA REPORT ~

Docket No:

50-311 Date:

09/10/92 Compl'eted by:

Mark Shedlock Telephone:

339-2122 Operating Status

1.

Unit Name Salem No. 2 Notes

2.

Reporting Period August 1992

3.

Licensed Thermal Power (MWt) 3411

4.

Nameplate Rating (Gross MWe) 1170

5.

Design Electrical Rating (Net MWe) 1115

6.

Maximum Dependable Capacity(Gross MWe) 1149

7.

Maximum Dependable Capacity (Net MWe) 1106

8.

If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason~~~N~A~~~~~~~~~~~~~~~~~~~~~~~~~

9.

Power Level to Which Restricted, if any (Net MWe)

N/A

10. Reasons for Restrictions, if any ~~~~N~A"-=--~~~~~~~~~~~~~~~
11. Hours in Reporting Period
12. No. of Hrs. Rx. was Critical
13. Reactor Reserve Shutdown Hrs.
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Elec. Energy Generated (MWH)
18. Net Elec. Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (using MDC Net)
22. Unit Capacity Factor (using DER Net)
23. Unit Forced Outage Rate This Month 744 744 0

744 0

2523355.2 846070 812000 100 100 98.7 97.9 0

Year to Date Cumulative 5855 95424 2299.6 60915.8 0

0 1884.5 58783.3 0

0 5757477.6 135869199.4 1861040 61588088 1726312 58594597 32.2

61. 6 32.2
61. 6 26.7 55.5 26.4 55.1 29.5 23.5
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

We are presently in a forced maintenance outage.

25. If shutdown at end of Report Period, Estimated Date of Startup:

Unknown at this time.

8-1-7.R2

NO.

DATE 2

F:

Forced S:

Scheduled TYPE 1 DURATION REASON2 (HOURS)

Reason A-Equipment Failure (explain)

B-Maintenance or Test C-Refueling D-Requlatory Restriction UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH August 1992 METHOD OF SHUTTING DOWN REACTOR 3

LICENSE EVENT REPORT #

Method:

1-Manual 2-Manual Scram SYST~M CODE E-Operator Training & License Examination F-Administrative 3-Automatic Scram 4-Continuation of Previous Outage 5-Load Reduction 9-0ther G-Operational Error (Explain)

H-Other (Explain) 4 DOCKET NO. : _s"-o"--""3_.1 """1 ----

UN IT NAME:

Salem #2 DATE:

09/10/92 COMPLETED BY:

Mark Shedlock TELEPHONE:

339-2122 COMPgNENT CAUSE AND CORRECTIVE ACTION CODE Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report CLER) File (NUREG-0161)

TO PREVENT RECURRENCE 5

Exhibit 1 - Same Source

  • SAFETY RELATED MAINTENANCE DOCKET NO:

50-311 SALEM 2 MONTH: -

AUGUST 1992 UNIT NAME:

WO NO UNIT 920619148 2

920728126 2

920729114 2

920807169 2

920813248 2

920819076 2

920820210 2

VALVE 2WG41 DATE:

COMPLETED BY:

TELEPHONE:

SEPTEMBER 10, 1992 J. FEST (609)339-2904 EQUIPMENT IDENTIFICATION FAILURE DESCRIPTION:

SEAT LEAKAGE -

OPEN, INSPECT &

REPAIR VALVE 21MS44 FAILURE DESCRIPTION:

STEAM LEAK AT FLANGE -

REPAIR VALVE 22GB4 FAILURE DESCRIPTION:

PINHOLE LEAK IN BONNET -

REPAIR 22 CHARGING PUMP FAILURE DESCRIPTION:

NOISE & VIBRATION IN GEAR BOX -

CHANGEOUT VALVE 22SW243 FAILURE DESCRIPTION:

VALVE LEAKING -

INVESTIGATE &

CORRECT VALVE 22SW416 FAILURE DESCRIPTION:

FLANGE & DIAPHRAGM LEAK -

REPLACE VALVE 2 FHB EXHAUST FAN FAILURE DESCRIPTION:

2FHB EXHAUST FAN D/P NOT CONTROLLING PROPERLY INVESTIGATE

I I

  • 10CF~50.59 EVALUATIONS MONTH: -

AUGUST 1992 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-311 SALEM 2 SEPTEMBER 10, 1992 J. FEST (609)339-2904 The following items were evaluated in accordance with the provisions of the Code of Federal Regulations 10CFR50.59.

The Station Operations Review Committee has reviewed and concurs with these evaluations.

ITEM

SUMMARY

(None for the period.)

SALEM UNIT NO. 2 SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

UNIT 2 AUGUST 1992 The Unit began the period operating at full power.

On August 1, 1992, power was briefly reduced to 75% to clean 23 Condensate Pump suction strainer.

The Unit was restored to full power later the same day and continued to operate at essentially full power throughout the remainder of the period.


~---------

~*~

~REFUELING INFORMATION DOCKET NO:

MON~H: -

AUGUST 1992 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

MONTH AUGUST 1992

1.

Refueling information has changed from last month:

YES NO ~~X~~

2.

Scheduled date for next refueling:

MARCH 27, 1993 50-311 SALEM 2 SEPTEMBER 10, 1992 J. FEST (609)339-2904

3.

Scheduled date for restart following refueling:

MAY 21, 1993

4.

a)

Will Technical Specification changes or other license amendments be required?:

YES NO NOT DETERMINED TO DATE ~=x~-

b)

Has the reload fuel design been reviewed by the station Operating Review Committee?:

YES NO x

If no, when is it scheduled?: FEBRUARY 1993

5.

Scheduled date(s) for submitting proposed licensing action:

N/A

6.

Important licensing considerations associated with refueling:

7.

Number of Fuel Assemblies:

a.

Incore 193

b.

In Spent Fuel storage 408

8.

Present licensed spent fuel storage capacity:

1170 Future spent fuel storage capacity:

1170

9.

Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

March 2003 8-1-7.R4