Docket Nos. 50-272
50-311
50-354
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KING OF PRUSSIA, PENNSYLVANIA 19406-1415
.~.*
AUG 2 4 1992
Public Service Electric and Gas Company
A TIN: Mr. S. E. Miltenberger
Vice President and Chief Nuclear Officer
P.O. Box 236
Hancocks Bridge, NJ 08038
Gentlemen:
SUBJECT:
SALEM AND HOPE CREEK RESIDENT INSPECTION
50-272/92-09; 50-311/92-09; 50-354/921-09
This letter transmits the findings of an inspection to assure public health and safety, conducted
by Mr. T. Johnson, and other members of the NRC resident and regional staffs, at the Salem
and Hope Creek Nuclear Generating Stations for the period between June 14 and July 25, 1992 .
The findings of this inspection were previously discussed with Messrs. C. Vondra and J. Hagan
of your staff.
The inspectors identified strong performance during the Salem Unit 1 mid-loop operations and
during the Artificial Island security contingency response initiative. Weaknesses identified in
the erosion/corrosion program at Salem were addressed with timely and effective corrective
action. While recognizing that your organization identified that numerous contracted fire-watch
personnel failed to adequately perform assigned duties, we are concerned with the potential
issues that this event poses.
This item remains unresolved pending completion of your
investigations. In the interim, our staff will continue to monitor and assess your activities in this
matter. No reply to this letter is required.
Your cooperation with us is appreciated. Ky,
Edward C. Wenzinger, Chi
Projects Branch No. 2
Division of Reactor Projects
...
Enclosure:
NRC Inspection Report Nos. 50-272/92-09; 50-311/92-09; 50-354/92-09
9209030041 920824
ADOCK 05000272
G
/ytPY' I
Public Service Electric & Gas Co.
cc w/encl:
AUG 2 4 1992
2
S. LaBruna, Vice President - Nuclear Operations
C. Vondra, General Manager, Salem Operations
J. Hagan, General Manager, Hope Creek Operations
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
F. Thomson, Manager, Licensing and Regulation
J. Robb, Director, Joint Owner Affairs
A. Tapert, Program Administrator
L. Reiter, General Manager, QA and Nuclear Safety Review
M. Wetterhahn, Esquire
R. Fryling, Jr., Esquire
J. Isabella, Director, Generation Projects Department, Atlantic Electric
D. Wersan, Assistant Consumer Advocate, Office of Consumer Advocate
K. Abraham, PAO
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
OFFrct~L RECORD COPY
AUG 2 4 1992
Public Service Electric & Gas Co.
3
bee w/encl:
Region I Docket Room (with concurrences)
E. Wenzinger, DRP
J. White, DRP
D. Holody, EO
J. Stone, NRR
S. Dembeck, NRR
DRS/ED SALP Coordinator
DRSS SALP Coordinator
R. Lobel, OEDO
bee w/letter and Executive Summary Only:
W. Hehl, DRP
B. Norris, DRP
W. Hodges, DRS
W. Lanning, DRS
R. Cooper, DRSS
C. Miller, PDI-2, NRR
DRP:RI
T. P. Johnson
7/27/92
OFFICIAL RECORD COPY
DRP:RI
- 07
R. White
~enzinger
s114192
o~ \\ 192
- Please see previous page for bee distribution