I
I
.... .., -
~
Docket Nos.
50-272
50-311
50-354
Public Service Electric and Gas Company
A TIN: Mr. S. E. Miltenberger
APR O c; 1coz
v
,.J._J
Vice President and Chief Nuclear Officer
. P.O. Box 236
Hancocks Bridge, NJ 08038
Gentlemen:
Subject: NRC Inspection Nos. 50-272/92-03; 50-311/92-03; 50-354/92-02
This letter transmits the findings of an inspection to assure public health and safety,
conducted by the resident inspector staff including Mr. T. Johnson and others from February
9, 1992 to March 21, 1992, at the Salem and Hope Creek Nucleai Generating Stations. The
findings were discussed with Mr. C. Vondra and Mr. J. Hagan of your staff.
Within the scope of this inspection, our inspectors verified that the Salem and Hope Creek
-facilities were operated in a safe manner for this period of r.eview. Three non-cited
violations were identified relative to the Salem facility and are described within the report.
No reply to this letter is required.
As described in the enclosed report, our staff reviewed your Licensee Event Report
supplement relative to your engineering evaluation of a previously identified finding
involving missing/degraded seismic gap high energy line break seals. From discussions with
your staff it is apparent that the most recent submittal did not fully assess the safety impact
of the missing/degraded seals relative to the effect on plant design basis and certain
equipment operability. We are interested in your ability to effectively analyze and assess this
matter sufficient to resolve the issue. Additional management attention maybe warranted in
this matter.
Your cooperation with us is appreciated.
Sincerely;
- *,.,
j;\\~ r:;:_; :~ .. *.~-
~ -; : --
A. Randolph Blough, Chief
Projects Branch No. 2
Division of Reactor Projects
Enclosure: NRC Inspection Report Nos. 50-272/92-03; 50-311/92-03; 50-354/92-02
9204170031 ~~g~g~72
ADOCK
G
Public Service Electric and Gas Company
2
cc w/encl:
S. LaBruna, Vice President - Nuclear Operations
C. Vondra, General Manager, Salem Op~rations
J. Hagap, General Manager, Hope Creek Operations
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
F. Thomson, Manager, Licensing and Regulation
J. Robb, Director, Joint Owner Affairs
A. Tapert, Program Administrator
L. Reiter, General Manager, QA and Nuclear Safety Review
M. Wetterhahn, Esquire
R. Fryling, Jr., Esquire
J. Isabella, Director, Generation Projects Department,* Atlantic Electric D. Wersan, Assistant
Consumer Advocate, Office of Consumer Advocate
- *
-
J. Lipoti, State of New Jersey
K. Abraham, PAO
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
Public Service Electric and Gas Company
bee w/encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
J. Joyner, DRSS
R. Blough, DRP
J. White, DRP
J. Stone, NRR
S. Dembek, NRR
B. Norris, DRP
L. Cheung, DRS
DRSS SALP Coordinator
R. Lobel, EDO
C. Miller, PDI-2, NRR
bee w/letter and Executive Summary Only:
W. Hehl, DRP
S. Shankman, DRP
W. Hodges, DRS
J. Durr, DRS
L. Bettenhausen, DRS*
R. Cooper, DRSS
3
DRP:RI
A. R. Blough
y' 17192
OFFICIAL RECORD COPY