Submits Results of Review of ERDS Implementation Plan for Facilities,Submitted Via .Implementation Plan Acceptable.Telephone Lines Scheduled to Be Installed in Mar 1992 Not Fall 1992 as Stated in Util Schedule
ML18096A586
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 03/19/1992
From: Chris Miller
Office of Nuclear Reactor Regulation
To: Miltenberger S
Public Service Enterprise Group
References
NUDOCS 9203300004
Download: ML18096A586 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos.

50-272, 50-311 and 50-354 Mr. Steven E. Miltenberger March 19, 1992 Vice President and Chief Nuclear Officer Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

SUBJECT:

EMERGENCY RESPONSE DATA SYSTEM IMPLEMENTATION PLAN, SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2, AND HOPE CREEK GENERATING STATION The U.S. Nuclear Regulatory Commission (NRC) has reviewed the Emergency Response Data System (EROS) implementation plan for the Salem Nuclear Generating Station, Units 1 and 2, and Hope' Creek Generating Station, which was submitted in a letter from Mr. Stanley LaBruna dated October 28, 1991.

Based upon this review, the NRC has found that your implementation plan provides the basis for an acceptable implementation of EROS at your facilities.

One item of interest was noted in the review of your implementation schedules concerning the NRC installation of telephone lines for fRDS.

Your schedules anticipate NRC installation of telephone lines in the Fall of 1992.

The telephone lines for Hope Creek and Salem are scheduled to be installed in March 1992.

Be advised that the testing phase of EROS implementation involves all licensees testing with the NRC contractor, Halliburton NUS Environmental Corporation. Since the contractor does not have unlimited resources for testing multiple EROS links simultaneously, close coordination with the Halliburton NUS personnel in scheduling your EROS testing will be a key element in the successful completion of EROS implementation.

The project manager at Halliburton NUS is Mr. Tony LaRosa, and he may be reached at (208) 524-9227.

--1"2-Q..0. 1:.,..., _')

(

920330000'4 '=9-=-2~0-3_1_9~---. ;-1, PDR ADOCK 05000272 1

F PDR

Mr. Steven March 19, 1992 If you have any questions or problems in implementing the EROS program, please contact Mr. John Jolicoeur, the NRC EROS project manager, at (301) 492-4155 or your NRR Project Manager.

cc:

See next page DISTRIBUTION Docket File NRC & Local PDRs PDI-2 Reading File DOA Reading File IRB Reading File ELJordan, AEOD JRJolicoeur, AEOD DFRoss, AEOD RFPriebe, AEOD EWWeiss, AEOD RLSpessard, AEOD WBateman, OEDO RLobel, OEDO

  • Previously Concurred OFFICE IRB:DOA:AEOD*

NAME JRJolicoeur DATE 02/11/92 Sincerely,

/S/

Charles L. Miller, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation SVarga JCalvo CMi 11 er JStone SDembek CConklin, RGN-I RBlough, RGN-I JWhite, RGN-I MO'Brien(2)

OGC ACRS ( 10}

IRB:DOA:AEOD*

RFPriebe 02/13/92 IRB:DOA:AEOD*

D:DOA:AEOD*

EWWeiss RLSpessard 02/13/92 02/14/92 OFFICE PDI-2jJ_A PDI-2/PM 0P'J.- PDI:-ZJPM I

~ PDI-2/D I

NAME i~Drsmn JStone:tlc DATE

~110192

~ n1 ;92 OFFICIAL RECORD COPY DOCUMENT NAME:

SALHOPE A.)< J..

/#8' S!JemoeK v CMiller CJv ~

~ I /7/92 2 //Cf /92 L

Mr. Steven March 19, 1992 If you have any questions or problems in implementing the EROS program, please contact Mr. John Jolicoeur, the NRC EROS project manager, at (301) 492-4155 or your NRR Project Manager.

cc:

See next page Sincerely, Charles L. Miller, Director Project Directorate 1-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Mr. Steven E. Miltenberger Public Service Electric & Gas, Company cc:

Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street NW Washington, DC 20005-3502 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. Calvin A. Vondra General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Mr. Thomas P. Johnson, Senior Resident Inspector Salem Generating Station U.S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs NJ Department of Environmental Protection CN 415 Trenton, NJ 08625-0415 Maryland People's Counsel American Building, 9t~ Floor 231 East Baltimore Street Baltimore, Maryland 21202 Mr. J. T. Robb, Director Joint Owners Affairs Philadelphia Electric Company 955 Chesterbrook Blvd., SlA-13 Wayne, PA 19087 Salem Nuclear Generating Station, Units 1 and 2, and Hope Creek Generating Station Richard Hartung Electric Service Evaluation Board of Regulatory Commissioners 2 Gateway Center, Tenth Floor Newark, NJ 07102 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Frank X. Thomson, Jr., Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Mr. J. A. Isabella MGR. - Generation Department Atlantic Electric Company P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Carl D. Schaefer External Operations - Nuclear Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Public Service Commission of Maryland Engineering Division ATTN:

Chief Engineer 231 E. Baltimore Street Baltimore, MD 21202-3486

Mr. Steven E. Miltenberger Public Service Electric & Gas Company cc:

Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 241 Hancocks Bridge, New Jersey 08038 Mr. J. J. Hagan General Manager - Hope Creek Operations Hope Creek Generating Station P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Nuclear Generating Station, Units 1 and 2, and Hope Creek Generating Station