Accepts Requested Delay in Completing Alarm Connections Fire Pumps,Fresh Water Sys & House Heating Boiler in Facility Control Room
ML18096A517
Person / Time
Site: Salem  PSEG icon.png
Issue date: 02/13/1992
From: Stone J
Office of Nuclear Reactor Regulation
To: Miltenberger S
Public Service Electric & Gas Co, of New Jersey
References
TAC-M82702, TAC-M82703 NUDOCS 9202200108
Download: ML18096A517 (3)


Text

Docket Nos. 50-272 and 50-311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric & Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

e February 13, 1992

SUBJECT:

DETAILED CONTROL ROOM DESIGN REVIEW IMPLEMENTATION, SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (TAC M82702 AND M82703)

By letter dated January 27, 1992, Public Service Electric and Gas Company (PSE&G) requested that certain alarm interconnections between Unit 1 and Unit 2 be delayed until completion of the Unit 1 tenth refueling outage.

The alarms in question are for the fire pumps, fresh water system, and house heating boiler. They currently alarm only in the Unit 1 control room.

All three systems are utilized by both units. Completion of the sixth refueling outage is the original commitment date for completion of the control room upgrades at Unit 2.

Unit 2 is currently in the sixth refueling outage with restart scheduled for April 15, 1992. Unit 1 is scheduled to start the tenth refueling outage on April 4, 1992, and restart on June 9, 1992.

This would mean a delay of about 2 months in completing this upgrade.

However, this delay would eliminate the need to* perform modifications on the Unit 1 alarm system while the unit is in operation.

Because of the relatively short time period involved and the benefit to be gained by not working Unit 1 while in operation, the staff finds the requested delay in completing the alarm connections for the fire pumps, fresh water system, and house heating boiler, in the Unit 2 control room to be acceptable.

cc:

See next page DISTRIBUTION:

Docket File NRC & Local PDRs PDI-2 Reading SVarga OFFICE NAME DATE JCalvo CMil 1 er MO'Brien(2)

JStone Sincerely,

/SI James C. Stone, Senior Project Manager Project Directorate I-2 Division of Reactor Project - I/II Office of Nuclear Reactor Regulation OGC JWermiel, 10D24 JBongarra, 10D24 ACRS(IO)

RBlough, RGN-I JWhite, RGN-I PDI-2/D

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos. 50-272 and 50-311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric & Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

February 13, 1992

SUBJECT:

DETAILED CONTROL ROOM DESIGN REVIEW IMPLEMENTATION, SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (TAC M82702 AND M82703)

By letter dated January 27, 1992, Public Service Electric and Gas Company (PSE&G) requested that certain alarm interconnections between Unit 1 and Unit 2 be delayed until completion of the Unit 1 tenth refueling outage.

The alarms in question are for the fire pumps, fresh water system, and house heating boiler. They currently alarm only in the Unit 1 control room.

All three systems are utilized by both units. Completion of the sixth refueling outage is the original commitment date for completion of the control room upgrades at Unit 2.

Unit 2 is currently in the sixth refueling outage with restart scheduled for April 15, 1992.

Unit 1 is scheduled to start the tenth*

refueling outage on April 4, 1992, and restart on June 9, 1992. This would mean a delay of about 2 months in completing this upgrade.

However, this delay would eliminate the need to perform modifications on the Unit 1 alarm system while the unit is in operation.

Because of the relatively short time period involved and the benefit to be gained by not working Unit 1 while in operation, the staff finds the requested delay in completing the alarm connections for the fire pumps, fresh water system, and house heating boiler, in the Unit 2 control room to be acceptable.

cc:

See next page Sincerely, James C. Stone, Senior Project Manager Project Directorate I-2 Division of Reactor Project - I/II Office of Nuclear Reactor Regulation

Mr. Steven E. Miltenberger Public Service Electric & Gas Company cc:

Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street NW Washington, DC 20005-3502 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. Calvin A. Vondra General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Mr. Thomas P. Johnson, Senior Resident Inspector Salem Generating Station U.S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs NJ Department of Environmental Protection CN 415 -

Trenton, NJ 08625-0415 Maryland People's Counsel American Building, 9th Floor 231 East Baltimore Street Baltimore, Maryland 21202 Maryland Mr. J. T. Robb, Director Joint Owners Affairs Philadelphia Electric Company 955 Chesterbrook Blvd., SlA-13 Wayne, PA 19087 Salem Nuclear Generating Station Richard Hartung Electric Service Evaluation Board of Regulatory Commissioners 2 Gateway Center, Tenth Floor Newark, NJ 07102 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Frank X. Thomson, Jr., Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Mr. J. A. Isabella MGR. - Generation Department Atlantic Electric Company P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Carl D. Schaefer External Operations - Nuclear Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Public Service Commission of Engineering Division ATTN:

Chief Engineer 231 E. Baltimore Street Baltimore, MD 21202-3486

.1