ML18095A585
| ML18095A585 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 11/09/1990 |
| From: | Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML18095A584 | List: |
| References | |
| NUDOCS 9011200015 | |
| Download: ML18095A585 (2) | |
Text
e TA!L!! 3, 3*1 lCOntinµed) e TABLm NOTATIOlf With tha re&ctor trip sy1tem bre&.lcera in the closed po1ition and the con~rol rod drive syatem capable of rod withdrawal.
The chil.?\\nel{s) a1sociatad with the protaeti~e fu~ction* derived frcm the out of service Reactor Coolant Loop 1h&ll be plac~ in the tripped oend.!.tion.
Th* proviaiona ot Spacitication J.0.4 &re not applicable.
Si;h voltaqe to detector may be de*energ~zed &l::love P-6.
- I If ACTION Statement 1 is.entered a1 a result of Reactor rrip Brea.leer (RTB) or Reactor Trip Bypasa araake~ (RTBB) ma.intenanee teetinq result*
exeeedinq the followinq acceptance criteria, NllC raP"rti?l; ahall ba made ~
[tJ;+h:11 30 Ja.y6 i~aceord*nca with SpecificatJ.oG 6.9.1.91
§*'l*~'
ACTION 1 AC'l'ION 2
- 1.
A RTB or RTBB trip tailura during any eurveillanca taet with le11 than or equal to 300 qram* of weight added to the breaker trip bar.
- 2.
A RTB or RTBD time re*ponae failure that raault* in the
- c.
overall reactor trip 1ystem time reaponae exceedin; the Technical Specification limit.
AC1'IQI STWIQHTS With the n\\Ul\\ber of ehannel1 OPEltABU ona leH than roqu.ired by the Minimum Channel* OPIRA.Bt.I requ1%ement, be in BO': STANDBr within 6 houra1 however, =n* ~hannel may be bypaaaad for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> tor aurvaillanee teatin; per Specification 4.J.l.l provided the other =hannel i1 OPERABLE.
With the number of OP!RABL!l channels one less than the Total Number of Cha.nnela, JTAR'fUP and/or POWBll OPERATIOW m&y proceed provided t!w followinq acn4ition1 ~* sati*fied:
Th* in~raJ:ll* channel i* placed in tha tri~d condition
'-Ii thin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
Th* Mini.imm& Channel* OP~
r9q\\liramen~ is met1 however, on9 additional channel may be ~YP***ed for ~P to 2 houri tor suzveillanc* teetinq par Specilic&tion 4.3.1.1.
lither, 'l"HKIUCAL POWE~ ia r**tricted to ~ 75t of RA!ZD TH!RMAL
&nd the Power ltanqe, !f11utron l'lWI trip aetpoiJ1t i* reduced to $85, of RATZ!) TD~ POWllt within 4 h01.1r111 o~, the QUM>RAH! POMBR TII.'1' RATIO ia mo~itor*d at l*&*t once ~
12 hour**
- d.
'l'he QOAOJtA!rll POWIR !ILT RA~Io, ** indicated by th*
remaining three deteQtor*, i* verified conai*tant ~ith the no&"m&li&*d *ymmet~ic power di*t~ibution obt.ainad by u*inq the moval:ll* in-core detactor* in th* fou~ p*ir* of syi!lae~~ic thimble looati~n* at l***t once pe~ 12 bour1 when 'IKI~ POWI* i* graater than 75t cf 1'.ATIO 'l'HBRMAL POWIR.
SAUM - UHtT 2 l/4 l-5 lmendUnt Xo. 96
TA,BLE 3.3*1 CCo;;ip~
TMI.E ~OTAT!ON With the reactor trip system breakers in the closed position and the control rod drive system capable ot rod withdrawal.
The channel(s) asaociated with t:he protective functions derived from ehe oue of service Reactor Coolant: Loop shall be placed in the tripped condit:ion.
The provisions of Specification 3.0.4 are not applicable.
High voltage to detector may be de-energized above P-6.
If ACTION Statement l is entered as a result of Reactor Trip Breaker I
1
~~~~--:----.
(RT!) or Reactor Trip Bypa.as Breakers (RTBB) maintenance testing results lwi+/I;" '30 da.ys "'-.
exceeding the following acceptance criteria. mtc reporting ah&ll be made I 1 ~in accord.a.nee with Spacificationp-6.9.l,9:
ACTION 1
- ACTION 2
- ACTION 3
- L6'* 'f. a.}
- 1. A RTB or iTBB trip failure during any surveillance test with less than or equal to 300 grams of ve1ght added to the breaker trip b~.
- 2. A RTB or aT!! time response failure that results in the overall raac~or trip system time responae exceeding the Technical Specification limit.
ACTION STAIEHENIS
~ith che number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance tasting per Specification 4.3.l.l provided the other chaiinel is OPERABLE.
With the number of OPERABLE channels one less than the Total Number of Channel*, STAR.TUP and/or poqga OPERATION may proceed provided the following conditions are sati*fied:
- a.
Tha inoperable channel is placed in the tripped condition within l hour.
- b.
Th* MinilllWI Channels OPDABLE requirement i.1 meti however, one additional channel may be bypassed for up to 2 houri for surveillance testing per Spaeif1cat1on 4.3.1.1.
- e.
Either. THERMAL PO\\lEI 1* reatricted to ~ 75t of RATBl>
TH!liMAL and the Power lange, Neutron Flwc trip setpoint is reduced to< SS* of RATED THERMAL POWEi. within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; or, the QUADRAiT POWEi. TILT RATIO is monitored at least once per 12 bow:a.
With th* number of channel* OP!lA.8LE one l*** than required by the Minimum.Channels OP!IABLE requirement and wich the THERMAL POWER. level:
SALIM
- UNI'r 1 3/4 3-5 Amandmant No. 114 I~