.e ATTACHMENT 1.

o*

  • Q

TABLE. 3. 3-1 (Continued)

TABLE NOTATION..

With the reactor trip system breakers in the closed P,~sition and tbe control rod drive system capable of rod withdrawal.

The channel(s) associated with the protective functions derived from the out of service Reactor Coolant Loop shall be placed in the tri.?ped cqndition:..

Th~ provision~* 'of Specification 3.0.4. are not applicable.

High voltage to detector may be de-energized above P-6.

If ACTION Statement 1 is entered as a result of Reactor Trip Breaker.

(RTB)'or Reactor Trip Bypass Breakers (RTBB) maintenance testing results exceeding the fol.lowing acceptance criteria, NRC reporting shall be.made*.

in accordance with Specification.&.. 9.1:-9':.

~,c;.1. *. '

1. A RTB or RTBB.*trip failure during any surveillance test with less than or equal to 300 grams of weight added to the breaker trip bar.
2. A RTB or RTBB time response failure that results in the *overa.11:.. *.....

reactor trip system time response exceeding the Technical..

Specification limit.

ACTION STATEMENTS

.... ACTION 1 * -

.. *.With.th~*. number _o;;_chlin~els *qPERAB.LE one.. less. than 'required

,...,>,pf-~t}l.~i.M*fnfo1~.. qla;nnel!(OPERABLE'"requirement, be in HOT STANDBY

< .:> *.**'Wfthin '6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />s*; h6~ever... one -channel *may.be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing.per Specification 4.3.1.1 provided the other channel is OPERABLE.

ACTION 2 - '

ACTION 3 -

SALEH - UNIT 1 With the number of OPERA.BL~ channels one less than the Total Number of Channels, STARTUP and/or P9WER OPERATION may proceed provided the following "conditions are sati~_fie.d:

a.

The inoperable.channel is placed ~n the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

b.

The Minimum Channels OPERABLE requirement' *is met; however, one additional channel may be bypas.sed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.1.1.

c.

Either, THERMAL POWER is restricted to < 75% of RATED THERMAL and the Power Range, Neutron Flux trip setpoint is reduced to< 85% of RATED THERMAL POWER within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; or, the QUADRANT POWER TILT RATIO is monitore4 at least o~ce per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

With th~ number of channels OPERABLE one less than required by the.Minimum Channels OPERABLE* requirement and with the THERMAL POWER level:

  • 3/4 3-5 Amendlllent No.

114 I

TABLE 3.3-1 (Continued)

TABLE NOTATION With the reactor trip _system breakers in the closed position and the control rod drive system capalll_e of.cod wichdrawal.

The channel(s) associated with the protectiye functions derived from the out of service Re.actor Co'olant Loop shall b~ placed in the tripped*

condition.

The provisions of Specification 3. o*. 4 are not applicable.

High*voltage to detector may be de-energized above P-6.

      1. If ACTION Statement 1 is entered as a result of Reactor-Trip Breake~

(RTB>> or React.or T~ip Bypass Breaker (RTBB) maintenance testing results 1aXCeeding the following acceptance criteria, NRC reporting shall be made )At" w1th1f\\ '30°do...ys in accordance with Specification 6~9.1.9:

ACTION 1**

ACTION 2

1. ' A RTBor RTBB trip failure during any surveillance test

._,w.i.th less than or equal to 300 grams of weight added to the breaker trip. b_ari

2.

A RTB or R.TBB time respon.~e fai.lure that results in the overall reactor trip.system time response exceeding the Technical Specification*limit.>"

ACTION STATEMENTS*

With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypas~ed for up to 2>*

hours for surveillance testi"ng per Specification 4.3.l.+ *provided.

the other channel :is OPERABLE.

  • witfi. the number of OPERABLE channels one less than the Total.Number of Chann_els, STARTUP and/or POWER O~ERATION mar proceed

~. provided.. the' following conditions are sati'sfj.ed:

oa.

'The inoperable channel is placed in the tripped condition within l hour.

b.

The Minimum Channels OPERABLE requirement is met; however, one. ~dditional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.l.l.

c.

Either, THERMAL POWER is restricted to ~ 75\\ of RATED THERMAL

d.

and the Power Range, Neutron Flux trip setpoint is reduced to S 85%

of RATED THERMAL POWER within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; or, the QUADRANT POWER TILT RA'.l'IO is monitored at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

The QUADRANT POWER TILT RATIO, as indicated by the remaining three detectors,.* is verified consistant with the normalized symmetric power distribution obtained by using the movable in-core detectors in the four pairs of symmetric thimble locations at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when THERMAL POWER is greater than 75% of RATED THERMAL POWER.

SALEH -

UNIT 2

3/4 3-5 Amendment No. 96