ATTACHMENT 1
L REACTOR COOLANT SY~M SURVEILLANCE REQUIREMENTS (Continued)
- b.
4.4.6.5
- a.
- b.
- 9.
Preservice Inspection means an inspection of the full length of each tube in each steam generator performed by eddy current techniques prior to service establish a baseline condition of the tubing.
This inspection shall be performed after the field hydrostatic test and prior to initial POWER OPERATION using the equipment and techniques expected to be used during subsequent inservice inspections.
The steam generator shall be determined OPERABLE after completing the corresponding actions (plug all tubes exceeding the plugging limit and all tubes containing through-wall cracks) required by Table 4.4-2.
Reports Following each inservice inspection of steam generator tubes, the number of tubes plugged in each steam generator shall be reported to the Commission within 15 days.
The complete results of the steam generator tube inservice inspection shall be included in the Annual Operating Report for the period in which the inspection was completed.
This report shall include:
- 1.
Number and extent of tubes inspected.
- 2.
Location and percent of wall-thickness penetration for each indication of an imperfection.
- 3.
Identification of tubes plugged.
- c.
Results of steam generator tube inspections which fall into Category C-3 and require prompt notification of the Commission shall be reported pursuant to Specification 6.9.1 prior to resumption of plant operation.
The written followup to this report shall provide a description of investigations conducted to determine cause of the tube degradation and corrective measures taken to prevent recurrence.
SALEM - UNIT 2 3/4 4-13 Amendment No.