Rev 1 to Procedure TCP-2L, Nuclear Vessels Containment Liners
ML18094B279
Person / Time
Site: Salem  PSEG icon.png
Issue date: 07/07/1969
From:
Public Service Enterprise Group
To:
Shared Package
ML18094B278 List:
References
TCP-2L, NUDOCS 9002090193
Download: ML18094B279 (4)


Text

--

TES'l1ING PRO~EDtmJ::

l CUSTOMER PRODUCT ASSEMBLY ST.i\\.l~DARD NUCLEZ\\R VESSELS COHTJ\\Il*Il*IBN'r LINERS PROCt:DUl<E

'l'CP-~L NUMUF. R


t Page 1 of 4 DATE 7/7/69 DESCRIPTION ---------"----------------~ REVISION No.l* {9/21/69

) 0.1 SCOPE:

This procedure *is to be applied when it is *required to perform

~ pressure test, solution film test and halogen sniffer test of the welds on "test ch2.nncls 11 installed over liner plate *weld seams.

For specific contractual requirements see "Supplement A."

)-. r:o-*. p~}fr~*ONNEL. AND APPARATUS:*

i

) *-

1:---~

J()U::

c:*o

  • O**.CLLL *.. *

. 1.1 PERSONNEL:

Personnel directing and evaluating examinations under this procedure shall be qualified in accord-ance with the CB&I non-destructive testing Program

  • for Solution Film Testing, Absolute Pressure J.

Testing and Halogen Sniffer Testing.

-.. ----- -*----.- -.-JJ-----

-~ j

~~

.... o I

~

' i

'*i

. *.. * ---~

1.2* APPARATUS:

1.2.1 1.2.2 1.2.3 1.2.4

~1.2.5

~.. -* ---------- --- *-------------- -*-* ---- ---- -- ________ _.._ :.. __..;;,_. __ ':- ------

Test Manifold:

Dial gauges and valves assembled as shovm in Sketch 1 of Supplement A for pressurizing and monitoring test channel zones.

Gauges shall have been calibrated no longer than 90 days prior to the start of testing.

The air hose used for pressurizing the test channels must be free of standing water. * -

Thermometers:

Thermomei: c~. :: ::o be attached to the charmels for moni taring r1.u Ll19 the "Absolute Pressure Test." -

Leak Detector Solution.

See "Supplement A".

Halogen Leak Detector:

G~neral Electric Type H-2 or equal.

  • _. i..

~//:1

~ * **

Halogen Standard Leak:

or equal.

General Electric Type LS-20*.. *

~'

..... ~

't)XI y

~=a mw+milil*~* ***':!t,:s(.J "J."J:.,s.* '1' T r,_1r.o..,

J:.>D ocl:'n-*m'r.'

  • .a.""1

. J.,

.1:. !wJ:.

rO~ER DUCT NUCLE~R VESSELS CONTAINMENT LINERS Pr!OCEDURE

'rCP-2L NUMOER PAGE NO.

2 OF 4

DATE 7/7/69 ----

~M.

CR N ~---~-~~-~-~-~~-~~~~~~-~ REVISION NO. l (9/24/69) CNS i..

).

  • 2.0 PROCEDURES:

2.1 Penetration Test Channels 2.1.1 Test channels for penetrations may be manifolded together for testing.

The number of penetrations manifolded together will be at the discretion

_ of the test personnel in order to perform an efficient and thorough job of leak testing..Caution must be exercised in making the test connections in the manifold assembly to eliminate leakage.

The testing ass*embly and the manifold assembly

. shall be tested for leakage before start of test.

2.2 Preliminary Testing 2.2.1 All welds that are to be covered with test channels shall be tested in accordance with a vacuum box test procedure or in accordance with a liquid pene-trant examination procedure for those welds which

. cannot be vacuum box tested because of configuration and space limitations.

2.3 Surface Preparation

. *.t 2.4

. ***'!*:~...

  • 2.3.l Remove all dirt, dust, weld slag or debris from the *
  • test channel welds to be leak tested.
    • -~

2.3.2 Test channel must-be free of standing water.

Pressure Strength and Solution Fil~.t Test (Refer to Sketch 1-Suppl~ment Aj 2.4.1

~-4.2 Close Valves "A", "B 11 and and "E".

"C": open Valves "D" Slowly open Valve "C", ar.d pressurize to level specified in Supplement A.

'"-:~.

':. i.

  • -=~:.=i~:

_: :* ~:~}~: -~

. -:.::.~~.

-~:~~-:

  • -:_.:==;_~

2.4 3 After completing step 2.4. 2, lower pressure~- to level P2,

spec~f~ed in Supplement A *. :_,~

.'..: *... t*

-~-:_.. d~~~f

  • *_ *: ~--4.4 Ai>ply leak detector solution to, channel se~~ wi;id~'§'j J.. -.'.. **:*:.. ~ _

.. :._*. *.. :. *:. *,.. in *a continuous f~lm f~ee of bubbles..

  • Observe the solution film for bubles indicating
  • * '. *~::!'-:*
    • leakage for at least the minimum time, specified -*:::/'!~:-:

in "Supplement A.

11

  • * -~..

'.**:>~:.

'l1ES 1rIN

G. PROCEDURE

STANDARD PHOCl:DUIH:

.NUMUt;n TCP-2L CLEAR VESSEI,S CONTAINMENT r.INERS PAGE tW.

3 OF ----

DATE*~--=-7~/~7~/~6~~9~--=-~~~-

ON REVISION NO. 1 (9/24/6:9)) CNS 2.4.5 If leakage is detected, -release the pressure through.Valve 11B" to 0 psig, repair. the* leak or leaks, and retest.

2.4.6 -After successful completion of the-solution film test, open Valve 11B 11 and release the pressure to

  • 0 psig.

2.5 Halogen sn1ffer Test

  • 'I

. (Ref er to Sketch !-:Supplement A) i.

2.5.1 Close Valve "B".

There must be no detectable leakage in the test connections before pressuriz-ing with refrigerant to minimize contamination iii the testing area.

2.5.2 Open Valve "A" and pressurize the test channel with refrigerant to pressure* level P3, specified

  • in supplement A, and then close Valve "A".

2.5.3 *Open Valve "C" slowly and.raise the pressure to levei P2, specified in Supplement "A"

  • 2.5.4 Close:Valves "C" and "D" and' open Valve "B".
2. 5. 5 Test the -channel to liner plate weld. joints with a Halogen Leak Detector at a probe rate of. about 2-1/2 feet/minute. The probe nozzle must be-within 1/2" of th"e weld while. testing for leaks.*

The sensi ti vi ty of the leak detector shall be : _

checked at.* the start of t~sting and Pc=iodically about every two hours during *testing using a

~:

calibrated standard leak.

The leak detector.

shall be capable of det_ecting leakage of _ l X io-5

~-::*>>:

std. cc/sec.

If any leaks* are-detected, release.

the pressure through Valve "B". (by opening Valve~-n.~Ji->>..-?

to exhaust the Halogen-air mixtu:r;e to an-area *

>~~-;~-: :;;,

- -outside the test area to avoia background'. con.:.. * -*,

.'.--ff..,;~> :T

.tamination.

Repair. the leak or.. leaks dete:ted

-_::.~;~'_- j;

. and retest the repair areas.

* ~<;:...

-;:~~-":.. _

2.5. 6 At the successful completion of the Halog~~- ~{£1;.,,/t~V>-f test of the test channel zone, -open Valve*

11n 11 *.eiDa

  • ':-,.+-~*. ::

exhaust the Halogen-air mixture.through- :the_ e~ams~%~i--~*::j:

line to an area outside the test. area.to.avoid... ;f:):~:t~-";;*}

. ""'h,,.,..1.--,..,,...,...,,nn rnnt-rimi nnti on.

.... r

');;'~.:;,~::~~.:~~-*:

)

.
-.1
    • r "fl R.;_~S~~~:Al:~~~JD~A~R~D:__* ~-~~~-=------~_;__--~~~

PHOCl:DUliC TCP-2L

  • NUMUEr~

.. ;;11 t(

.,~

  • i~.

PAGE tJQ.

. 4.

OF 4

DATE 777/69

_--~--

UCLEAR VESSELS CONTAINMENT LINERS 2.6 2.5.7

. /:~.

  • .;:)
  • tjt REVISION NO.,,1.__!2. /2 4L,6 9)

CNS f:'

Purge the regrigerant from the test channel section..

. J1:

  • by* clos.ing_ valve 11B 11 and. slowiy opening Vnlve "C".
  • *1 Pressurize the channel to pressure level P4,
    • ~*

specified in Supplement A.

Clqse Valve 11 C 11 and open*

oii.;:

~~l;\\~:5~o vent the system.

Repeat this a :~n~0~,i

~~~ ~.

'-2.5.8 After successful' completion-of this test proceed with the Absolute Pressure Test.

_ ___.,;~)*:_;:~

Absolute Pressure Test (Pressure Decay)

  • .< _*_;:~:

-*)'~f-<.::::~*.

(Refer to Sketch 1-Supplement A)

_;*. -* '.{ *,*tt::**'.*1 2.6.1 Close Valve "B", slowly open Valve "C" and* p~-e~

7 sur~~:-.. :.~~ll the test section to. pressure P2, spe?cified in Supplement "A".

  • 2. 6. 2 Attach thermometers :to test channels as *necessary

. for monitoring.

  • 2.6.3 Pressure P2 shall.be held for the time specified in Supplement "A"...*
}..

.~~*

  • "*ri*-~ *. ~-~*-.-.

.. ;_.i;* ' - *.

.* *: {

2.6.4.*Record the*following_ for the Absolute Pressure Test *

a.
  • b.
c.
d.
e.

Test channel~zone number Time {at beginbing and End of test)

Date of.*test *

  • Temperatures {at be __ 1n
  • ng and end

.Pressure on 6 inch guage (at beginning and*..... _..:,f test) *

- ~:.*::;.

.:_f*

. {:

of.test)

... :~*

~ ~. -~ -~-~~r~;,

  • O ACCEPTANCE CRITERIA:

3.1 See Supplement A.

. 0 DOCUMENTATION:

4.1

.~...

. ~**..