TABLE 4,3-13 !Continued)
TABLE NOTATION
( 1)
The CHANNEL FUNCTIONAL TEST shall also demonstrate tnat automatic isolation of this pathway and control roo~
alarm annunciation occurs if any of the following conditions exist:
- 1.
Instrument indicates measured levels above the alarm/trip setpoint.
- 2.
Circuit failure.
(Loss of Power).
- 3.
(2) demonstrate that control room alarm annunciation occurs i~ any of the following conditions exist:
- 1.
Instrument indicates 1TP.asured levels above the alarm/trip setpoint.
- 2. Circuit failure.
(Loss of Power)
- 3. _...!.,~~~~~~~~~~~~=--.:.~~~
- 4.
~I~~~:_.::~~~~~~-!..!.!--~~~
OA I (3)
The initial CHANNEL CALIBRATION was performed using appropriate liq~id or gaseous calibration sources obtained from reputable suppliers. The activity of the calibration sources were reconfirmed using a multi-channel analyzer which was calibrated using one or more NBS standards.
(4)
The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal:
1 *. One volume percent oxygen, balance nitrogen, and
- 2.
Four volume percent oxygen, balance nitrogen.
- At al 1 times
'*During waste gas holdup system.operation.
- During containment purge or containment pressure -
vacuum relief.
SALEt UNIT l 9001310530 900122 PDR A:OOC:I< 0500~E1t?
p 3/4 3-69.
Amendment No. 79