ML18094B240

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Adding Footnote to Surveillance Requirement Stating That one-time Waiver of 550 Gpm Max Flow Requirement in Place from 900104 Until Initial Entry Into Mode 5 During Fifth Refueling Outage
ML18094B240
Person / Time
Site: Salem PSEG icon.png
Issue date: 01/04/1990
From:
Public Service Enterprise Group
To:
Shared Package
ML18094B239 List:
References
NUDOCS 9001190045
Download: ML18094B240 (3)


Text

....,.... : **: _:.. :.. ~..

,;....>. ~..

  • ..:.*-~
  • . ~.
  • ' *'~
  • ._J
  • .'. ~

ATTACHMENT 2 MARKED VP TECHNICAL SPECIFICATION PAGES 9001190045 900104 PDR ADOC~<. 05000311 P

PNU

~* *i ;:.**~:*;., r-*.,*'.* **:,::-;: *. ;.:.:""',.... * ::,.;-,"' ':..

>*'~."~*-**-~:. i,*..,

.*-.*-!c**:.***7,-***1'*:** **.,..

- * *. '... : ** ~.. ;-..,, * *** *.,, - *.!-' *.* *:-.-* ::.**...... '... *, ~

... ***~:*:i\\:.~_'.'.;._..... _::.... ~.-~---.-*..

~*

"1.:.

~J

~.. :

~;

!~

~ _;.

~ :*

~MERGENCY CORE COOLING SYSTEMS SURVE!LLANCE REgUIREMENTS (Continued)

f.

Sy v~rifying that each.of the following pumps develops the indicated

  • discharge pressure on recirculation flow when tested pursuant to Specification 4.0.S:
1.

Centrifugal charging pump ii:: 2400 psig ii:: 1425 psig ii:: 165 psig

2.

Safety Injection pump

3.

Residual heat removal pump

g.

.By verifying the correct position of 11ch of tht following ECCS throttle valves:

1.
2.

Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following complttfon of each valve stroking operation or maintenance on the valve when tht ECCS subsystems are required to be OPERABLE.

At least once per 18 months.

i ****ff1;S~I_:S~Y;!st~e!!!!m

    • "51ve Number.

LPSI System Valve Number 21 SJ 16 22 SJ 16 23 SJ 16 24 SJ 16 21 SJ 138 22 SJ 138

  • 23 SJ 138.

24 SJ 138 21 SJ 143 22 SJ 143 23 SJ 143 24 SJ 143

h.

Sy performing a flow balance test, during shutdown, following completion of modifications to the ECCS subsystems that altar the subsystem flow characteristics and verifying that:*

1.

For safety injection lines, with 1.singl1 pUl!q) running:

a) b)

The sum of the i*njection lint flow ratis, exclud1ng the 1 i ne with the hi gnest fl ow rate, is ?, 463 ;pm, -and The total pump flow ~at1 is < 650 gp11.

2.

For ~entr1fuga1 charging pUlllf) lines, with 1 single pump running:

a) b)

SALEM - UNIT 2 The sum of the injection line flow ratas, 1xc:ludin; the 11nt with th* highest flow rate, is.?_ 346 gpm, and The tota 1 pump fl aw rate is < 550 gpm. ~ ~

3/4 5*6 Amendment No.

'l

  • .~l

':?;

: '~
i. The automatic isolation and interlock function of the RHR System shall be verified within the seven (7) days prior to placing the 'RHR System in service for cooling of the R.eactor Coolant System.. This shall be done by verifying that valves RHl and RH2 close upon insertion of a test signal corresponding to a reactor coolant pressure of 580 psig or less, and that, with a test signal corresponding to a reactor coolant p*ressure of 580 psig or greater, that the valves cannot ~e opened~
  • .(Footnote from page 3/4 5-6)

F1ow balance testing pursuant to Specification 4.5.2.h shall be performed the first time the unit is in COLD SHUTDOWN after Decemoer 15, 1981....

      • (Footnote to page 3/4 5-6 item h.2)

The maximum limit (i.e. (550 gpm) on ~CCS Centrifugal Charging

~ump Flow is waived on a one time basis for the period commencing January 4, 1990 and ending upon initial entry into Mode 5 during.

the Unit 2 5th Refueling Out~ge

  • SALEM UNIT 2 3/4.5-61 Amendment No.

l