Forwards Insp Repts 50-272/89-25 & 50-311/89-23 on 891117- 29.Enforcement Conference Scheduled on 891211 to Discuss Circumstances Surrounding Identification of Single Failure Vulnerability in ECCS
ML18094B202
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/05/1989
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML18094B203 List:
References
EA-89-237, NUDOCS 8912210141
Download: ML18094B202 (2)


See also: IR 05000272/1989025

Text

.

I

Docket Nos. 50-272

50-311

EA No.89-237

Public Service Electric and Gas Company

ATTN:

Mr. S. E. Miltenberger

15 DEC 1989

Vice President and Chief Nuc]ear Officer

P.O. Box 236

Hancocks Bridge, NJ

08038

Gentlemen:

Subject:

Special Inspection No. fa0-272/89-25; 50-311/89-23

This letter transmits the findings of a special inspection conducted by Mrs.

Kathy Halvey Gibson and Mr. Stephen M. Pindale from November 17-29, 1989, at

the Salem Nuclear Generating Station.

The findings were discussed with Mr.

Lynn K. Miller of your staff .

This inspection reviewed the circumstances surrounding -your identification of a

single failure vulnerability in the Emergency Core Cooling System.

The single

failure vulnerability was introduced when a facility modification was implemented

at both Units 1.and 2 in late 1987. 'As such, the postulated single failure

placed the units in a condition outside of the d~sign bases.

Further, although

you identified and reported this problem, your initial corrective actions did

not appear to full~ and properly resolv~ the concern.

Consequently, we have scheduled an Enforcement Conference at the NRC Region I

office on December 11, 1989 at 10:00 a.m. to disc~ss .this matter.

At the*

conference you should be p~epared to discuss the causes of the event, your

response including corrective actions, and the safety significance, including

any potential broader implications.

Specifically, you should be prepared to

discuss your previous and current programs for reviewing, approving and

  • implementing design changes, and the effectiveness of the onsite review committee.

Your cooperation with us is appreciated.

Sincerely,

William F. Kane, Director

Division of Reactor Projects

Enclosure:

NRC Region I Special Inspection Report 50-272/89-25;

50-311/89-23

OFFICIAL RECORD COPY

8912210141 891205

PDR

ADOCK

o~nnn?7?

IR 89/25-23 - 0001.0.0

12/04/89

-

- ... - -i=*fi:-:'*-

1 1

---*


    • -
  • Public Service Electric

and Gas Company

cc w/encl:

2

Qf; DEC 1989

S. LaBruna, Vice President - Nuclear Operations

Jack Urban, General Manager, Fuels Department, Delmarva Power & Light

Co.

L. K. Miller, General Manager - Salem Operations

B. A. Preston, Manager, Licensing and Regulation

General Manager, Nuclear Safety Review

M. J. Wetterhahn, Esquire, Conner & Wetterhahn

R. Fryling, Jr., Esquire

S. Ungerer, Manager, Joint Generation Projects Department, Atlantic

Electric Company

Licens~ng Project Manager, NRR

D. Wersan, Assistant Consumer Advocate, Office of Consumer Advocate

R. F. Engel, Deputy Attorney General, Dept. of Law and Public Safety

Lower Alloways Creek Township-

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

bee w/encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

Senior Resident Inspector, Hope Creek

S. Barber, Senior Resident Inspector, Susquehanna

Robert J. Bores, DRSS

TI Coordinator, DRP

J. Stone, NRR Project Manager

R. J. Kiessel, NRR

J. Oyer, EDD

J. Goldberg, OGC

0. Holody, Region I

J. Partlow, NRR

J. Lieberman, OE

l(HG

RI: DRP -

. Gibson/rhl

KHGJ:'a ..... P'O s

RI: oRP

-swetland

R~L

Linville

12/4 /89

121 +189

121 A !89

OFFICIAL RECORD-tOPY

  • 1,.\\l/i

R~ \\ioiw

Ka-n e

12;;, /89

IR 89/25~23 - 0002.0.0

11/29/89