February 14, 1985
- u. s. Nuclear Regulatory Commission Off ice of Nuclear Reactor Regulation Division of Licensing Washington, D. C.
20555 Attention~
Mro Steven Ao Varga~ Chief Operating Reactors Branch~ Noo l Gentlemen:
NUREG 0612, CONTROL OF HEAVY LOADS PHASE II REPORT SALEM GENERATING STATION UNIT NOS. l AND 2 DOCKET NOSe 50~272 and 50-311 We hereby submit 3 copies of our Phase II (nine month) Report on "Control of Heavy Loads at Nuclear Power Plants" which has been prepared by our consultant, ouadrex Corporation.
As previously identified, Cask Handling Crane longitudinal stiffeners did not meet CMAA code requirements (Liden to Varga, Supplement t0 the Six Month response, Guideline 7, Article 10.2.5, pg. 7).
A subsequent review by the crane manufacturer, Whiting Corporation, has determined that the longitudinal stiffeners are not required for the bridge girders to comply with the current CMAA #70, Rev. 83 code requirements.
With this submittal, PSE&G considers the entire program on the evaluation of heavy loads to be complete.
~
8912080179 850214 PDR ADOCK 05000272 R
PNU
Steven A. Va"'a 2/14/85 Should you have any further questions in this regard~ we will be pleased to discuss them with you.
~f'~~:vmd Attachments
~- C Mr. Donald C. l:o'ischer Licensing Project Manager Mr. James Linville Senior Resident Inspector Sincerely, E. A *. Li den Manager - Nuclear Licensing and Regulation (with attachments)
(with attachments)
Mr. Steven 2/14/85 without attachments BC Vice President -
Nuclear Assistant Vice President -
Nuclear Operations Support General Manager - Nuclear Quality Assurance General Manager - Nuclear Services General Manager - Salem Operations General Manager -
Hope Creek Operations General Manager - Nuclear Engineering General Manager -
Nuclear Assurance and Regulation General Manager - Nuclear Safety Review Assistant General Manager -
Engineering Assistant to General Manager - Nuclear Engineering Manager Nuclear Licensing and Reliability Manager - Nuclear Engineering Design Manager - Nuclear Systems Engineering Manager - Nuclear Plant Engineering Manager - Nuclear Engineering Control Manager - Nuclear Training Manager - Licensing and Analysis Manager - Nuclear Safety Assurance Public Information Manager -
Nuclear Safety Review Group Operations Assessment Engineer Station Quality Assurance Engineer Salem Operations Technical Department, Technical Staff Associate General Solicitor Nuclear Review Board Manager LIS (D. Nordstrom)
M. Banerjee (FSAR Update)
PE (W. T. Ullrich),
R. S. Patwell (Commitment Tracking)
PL&G (T. R. Robbins)
File 3.9.1 aeSO 1/3
--"""""'