Responds to Util 890522 Response to Notice of Violation Disagreeing W/Portion Re Gear Case Grease Relief Valve,Per Insp Repts 50-272/86-23 & 50-311/86-23.NRC Determined Violation Stands as Originally Written After Reexam
ML18094A599
Person / Time
Site: Salem  PSEG icon.png
Issue date: 07/26/1989
From: Boger B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Miltenberger S
Public Service Enterprise Group
References
NUDOCS 8908140169
Download: ML18094A599 (2)


See also: IR 05000272/1986023

Text

JUL 2 6 1989

Docket Nos. 50-272

50-311

Public

ATTN:

P. 0.

Service Electric and Gas Company

Mr. Steven E. Miltenberger

Vice President and

Chief Nuclear Officer

Box*236

Hancocks Bridge, New Jersey 08038

Gentlemen:

Subject:

Response to Notice of Violation NRC Combined Inspection

Report Nos. 50-272/86-23 and 50-311/86-23, Salem Generating

Station Unit Nos. 1 and 2

yes

This letter is in response to your letter (NLR-N89093) dated May 22, 1989.

We reviewed your response to Violation No. 2, Item 4 in which you disagree

with the portion of the violation dealing with the gear case grease relief

valve and determined the following.

At the time of the 86-23 inspection (August 11-15, 1986) for Units 1 and 2, the

NRC determined that the Limitorque Operator qualification file EQ-51 did not

contain the necessary information to establish environmental qualification of

Limitorque Operators without gear case relief valves.

Prior to the end of the

inspection additional technical evaluation was performed by your staff, this

information was provided to the NRC to support qualification of operators

without the gear case relief valves.

We have re-examined the information that

was originally available in the Limitorque Operator qualification file.

Again,

we determined that the original engineering evaluation at the time of the

inspection was inadequate to support qualification of the Limitorque Operators.

We acknowledge the

11 technical merits

11 of the PSE&G position on grease relief

valves presented prior to the end of the inspection, however, as stated in the

NRC letter of March 11, 1987,

11 PSE&G should have documented their arguments in

the Limitorque EQ file prior to the time of the inspection. 11

The violation

pertaining to the gear case grease relief valve stands as originally written.

In response to your statement in your May 22, 1989 letter that this concern be

closed, we have closed this item in Inspection Report 50-272/89-13 and

50-272/89-12, as all technical issues were adequately resolved.

Thank you for your cooperation in this matter.

8908140169 890726

PDR

ADOCK 05000272

Q

.

PDC

Sincerely,

Original Signed BJ..l

Bruce Boger, Acting Director

Division of Reactor Safety, RI

OFFICIAL RECORD COPY

R50-272/50-311 - 0001.0.0

07/26/89

TE *.u\\

Public Service Electric and

Gas Company

cc w/encl:

JUL 2 6 1SS9

2

Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

L. K. Miller, General Manager - Salem Operations

B. A. Preston, Manager, Licensing and Regulation

M. J. Wetterhahn, Esquire

General Manager - Nuclear Safety Review

R. Fryling, Jr., Esquire

Scott B. Lingerer, Manager, Joint Generation Projects Department,

Atlantic Electric Company

Licensing Project Manager, NRR

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

bee w/encl:

Region I Docket Room (with concurrences)

-MaRagemeRt Assistant, ogMA (w/o er1cl)

DRP Section Chief

J. Dyer, EDO

RI:DRS~ .~!:DRS

Anders~~~ \\('Durr

7//0/89

71/4189

~RS

l

~~*~~r

712Jo;39

OFFICIAL RECORD COPY

RS0-272/50-311 - 0002.0.0

07/07/89