Monthly Operating Rept for Feb 1988 for Salem Unit 2.W/
ML18093B513
Person / Time
Site: Salem PSEG icon.png
Issue date: 02/28/1989
From: Miller L, Orticelle A
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8903220120
Download: ML18093B513 (12)


Text

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-311

~-=-~~-=-~~~-

Unit Name Salem # 2 Date 3-10-89 Completed by Art Orticelle

-=-=-=--::-:--=---~-::-=~~-

Telephone 609-935-6000 Extension 4451

~~~~~~~~-

Month FEBRUARY 1989 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET)

(MWe-NET) 1 1085 17 97 4 2

1085 18 867 3

1085 19 866 4

868 20 956 5

102 21 979 6

0 22 1036 7

0 23 1042 8

0 24 1101 9

23 6 25 1095 10 737 26 1101 11 49 9 27 1109 12 480 28 1110 13 496 29 14 933 30 15 975 31 16 1034 Pg. 8.1-7 Rl

- -............ =--

,------,:..,:..--0--q--:**-:-f) 1 :2C>

s*;yc..>.1-..;.:::~

  • 'J 7 - J;...t-A:C-11-1r*L{

0~000-.:* 11 PDR

- -*r*.

P'CIC R

0PF.RATING DATA REPORT Completed by Pell White Operating Status

.Unit Name Salem No. 2 Reporting Period February 1989 Licensed Thermal Power (MWt) 3411 Nameplate Rating (Gross MWe) 1170 Design Electrical Rating (Net MWe) 1115 Maximum Dependable Capacity(Gross MWe)lI49 Maximum Dependable Capacity (Net MWe) 1106 Docket No.

Date Telephone Extension Notes 50-311 3-10-89 935-6000

  • 4451
1.
2.
3.
4.
5.
6.
7.
8.

If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A

~~~~~~~~~~~~~~~~~~~~~'--~~~~~~

9.

Power Level to Which Restricted, if any (Net MWe)

N/A

~~~~~~~~~~~-

10. Reasons for Restrictions, if any N/A

~~~~~~~~~~~~~~~~~~~~-

11. Hours in Reporting Period
12. No. of Hrs. Reactor was Critical
13. Reactor Reserve Shutdown Hrs.
14. Hours Generator On~Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Elec. Energy Generated (MWH)
18. Net Elec. Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor 21~ Unit Capacity Factor (using MDC Net)
22. Unit Capacity Factor (using DER Net)
23. Unit Forced Outage Rate This Month 672 59 0. 5 0

568.3 0

1708567.2 558165 532113 84.6 84.6 71.6 Year to Date 1416 1129. 9 0

10 23. 7 0

3221244 10 513 45 1011469 72.3 72.3 64.6 Cumulative 72025 39485.7 0

3814.6. 3 0

67886341 38935645 36986774 53 53 46.4 71.0 64.0 46 15.4 27.7 28.8

24. Shutdowns scheduled over next 6 months (type, date and duration of each)

N/A

25. If shutdown at end of Report Period, Estimated Date of Startup:

N/A 8-l-7.R2

Completed by No.

Date 0043 02-01-89 0052 02-05-89 0058 02-10-89 0059 02-10-89 0053 02-10-89 0054 02-10-89 0060 02-11-89 0061 02-13-89 0055 02-13-89 0062 02-13-89 1

F: Forced S: Scheduled UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH FEBRUARY 1989 Docket No. 50-311 Unit Name Date Telephone Extension Salem No.2 Art Orticelle Type 1

F F

F F

F F

F F

F F

Duration Hours

2. 18 103.73 8.65 24.00
1. 5 12.00 52.22
1. 92
1. 92
1. 9 2 Reason 2

B A

A A

B B

A A

A A

Method of Shutting Down Reactor 1

3 5

5 5

5 5

5 5

5 License Event Report 2 Reason A-Equipment Failure-explain B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensing Exam F-Administrative G-Operational Error-explain H-Other-explain System Code 4 HG CH IB IB HF HF IB IB HF HF 3 Method 1-Manual Component Code 5 HTEXCH HTEXCH INSTRU INSTRU PUMP XX PUMPXX INSTRU INSTRU PUMPXX PUMP XX 2-Manual Scram.

3-Automatic Scram.

4-Continuation of Previous Outage 5-Load Reduction 9-0ther 3-10-89 609-935-6000 4451 Cause and Corrective Action to Prevent Recurrence WATER BOX CLEANING FEED PUMP TRIP S/G LOW LEVEL THERMAL DISCHARGE LIMITS THERMAL DISCHARGE LIMITS CIRCULATING WATER PUMPS CIRCULATING WATER PUMPS THERMAL DISCHARGE LIMITS THERMAL DISCHARGE LIMITS CIRCULATING WATER PUMPS CIRCULATING WATER PUMPS 4 Exhibit G Instructions for Prepara-tion of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161) 5 Exhibit~

Salem as Source

1 UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-311 REPORT MONTH FEBRUARY 1989 Unit Name Salem No.2 Date 3-10-1989 Completed by Art Orticelle Telephone 609-935-6000 Extension 4451 Method of Duration Shutting License Cause and Correct:i:ve No.

Date Type Hours Reason Down Event System Component Action to 1

2 Reactor Report Code 4 Code 5 Prevent Recurrence CIRCULATING WATER 0056 02-13-89 F

1. 83 A

5 HF PUMPXX PUMPS CIRCULATING WATER 0063 02-13-89 F

1.83 A

5 HF PUMPXX PUMPS e

THERMAL DISCHARGE 0064 02-13-89 F

2.78 A

5 IB IN-S TRU LIMITS THERMAL DISCHARGE 0065 02-14-89 F

.83 A

5 IB INSTRU LIMITS THERMAL DISCHARGE 0066 02-14-89 F

.83 A

5 IB INSTRU LIMITS THERMAL DISCHARGE 0067 02-14-89 F

8. 1 7 A

5 IB INSTRU LIMITS THERMAL DISCHARGE 0068 02-14-89 F

7.75 A

5 IB INSTRU LIMITS CONDENSER TUBE 0070 02-14-89 F

7.65 A

5 HC HTEXCH LEAK INSPECTION CONDENSER TUBE 0075 02-16-89 F

8.73 A

5 HC HT EX CH LEAK INSPECTION CONDENSER TUBE 0082 02-22-89 F

2. 5 2 A

5 HC HTEXCH LEAK INSPECTION CONDENSER TUBE e

0085 02-23-89 F

.88 A

5 HC HTEXCH LEAK INSPECTION

SALEM UNIT 2 WO NO UNIT EQ1JIPMENT IDENTIFICATION 890112105 2

23 AFP FAILURE DESCRIPTION:

ERRATIC OPERATION/TROUBLESHOOT.

890119095 2

2B D/G FAILURE DESCRIPTION:

GEAR DRIVEN L. 0. PMP NOISY/REPLACE PUMP.

, 890123100 2

2FI53 2 FAILURE DESCRIPTION:

23 S/G STM FLW/IND LOW/TROUBLESHOOT.

890123105 2

2FI510 FAILURE DESCRIPTION:

21 S/G FD FLW/IND LOW//TROUBLESHOOT.

890125116 2

25SW58 FAILURE DESCRIPTION:

25 CFCU SW VLV/STROKE PROBLEM/TROUBLESHOOT.

890202054 2

2FT531 FAILURE DESCRIPTION:

23 S/G FD FLOW/HIGH READING/TROUBLESHOOT.

WO NO 890202062 890203082 890209141 890216102 890223129 930216001 SALEM UNIT 2 UNIT EQUIPMENT IDENTIFICATION 2

2DR432 FAILURE DESCRIPTION:

ROD LIMIT REC/SETPT PEN ERRATIC/TROUBLESHOOT.

2 2PI474A FAILURE DESCRIPTION:

PZR PRESS IND/METER FAILED/TROUBLESHOOT.

2 24MS10-AO FAILURE DESCRIPTION:

MAIN STEAM RELIEF/NO AUTO CONTROL/REPAIR AS REQ.

2 2C DG TURBO CHARGER FAILURE DESCRIPTION:

SUPPORT BOLT BROKEN/REPLACE.

2 2PI474A FAILURE DESCRIPTION:

PZR PRESS IND/METER FAILED/TROUBLESHOOT.

2 21 S.W. PUMP INSP.

FAILURE DESCRIPTION:

PULL 21 SERVICE WTR. PUMP AND INSTALL REBUILT PUMP IAW M6L-2.

WO NO 871201416 880916081 881028117 881121178 890109081 890110185 PSE&G SALEM GENERATING STATION SAFETY RELATED WORK ORDER LOG SALEM UNIT 2 UNIT EQUIPMENT IDENTIFICATION 2

22MS19 7 FAILURE DESCRIPTION:

HAS A PACKING LEAK, REPLACE THIS D-3 WITH A F-81 VALVE.

2 2C DG/EXHAUST PIPE FAILURE DESCRIPTION:

LEAK/REPLACE GASKETS.

2 2SWE55 FAILURE DESCRIPTION:

REPLACE EXPANSION JOINT.

2 22SW42 FAILURE DESCRIPTION:

FLANGE LEAK/REPLACE GASKETS/MARK NO. BA-100.

2 21 WASTE GAS COMPRESSOR FAILURE DESCRIPTION:

INOPERABLE/REPLACE.

2 2B D/G JACKET WTR HTR FAILURE DESCRIPTION:

LEAKING/REWORK.

.MAJOR PLANT MODil-ATIONS REPORT"MONTH FEBRUARY 1989

  • OCR NO.

PRINCIPAL SYSTEM None reported for this period.

Design Change Request DOCKET&:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

DESCRIPTION 50-311 March 10, 1989 P. White 6 0 9 / 3 3'9 ___ 4_4 __

5~5---

e MA:JOR PLANT MODIFICATIONS REPORT MONTH FEBRUARY 1989 e

DOCKET* NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Design Change Request 50-272 Salem 2 March 10, 19 8 9 P. White (609)339-4455

SALEM UNIT NO. 2 SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

UNIT NO.

2 FEBRUARY 19 8 9 The Unit began the period operating at full power and continued to operate at essentially fully power until February 5, 1989.

On February 5, 1989, following a power reduction from 90% to 60%, the Unit experienced a Reactor Trip on No. 23 Steam Generator (S/G) Low Level concurrent with a Steam Flow/Feed Flow mismatch.

At the time of the event, Nos. 23A and 23B Circulating Water Pumps and No. 23 Heater Drain Pump were out of service.

Four minutes prior to the unit trip, No. 22 S/G Feed Pump (SGFP) had tripped due to low suction pressure.

It was found that the low suction trip setpoint for No. 22 SGFP responed high due to failure of the low suction pressure switch.

The Unit was returned to service on February 10, 1989, and power was held at 60% to maintain condenser delta T's due to several circulators being out of service for repairs.

On February 14, 1989, the Unit was restored to full power following the return of a circulator to service.

Between February 14, 1989 and February 21, 1989, several minor load reductions were performed to address condenser tube leak problems.

On February 21, 1989, the Unit was restored to full power and continued to operate at that level throughout the remainder of the period.

REFUELING INFORMATION DOCKET NO.:

UNIT NAME:

50-311 Salem~2~~~~~~-

COMPLETED BY:

P. White DATE:

March 10, 1989 TELEPHONE:

609/935-6000 EXTENSION 4455 Month February 1989

1.

Refueling information has changed from last month:

2.
3.
4.

YES X

NO Scheduled date for next refueling:

March 31, 1990 Scheduled date for restart following refueling:

May 14,1990 A)

B)

Will Technical Specification changes or other license amendments be required?

YES NO NOT DETERMIN=E=D-==T~O-DATE X

Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO X

If no, when is it scheduled? yebruary 1990

5.

Scheduled date(s) for submitting proposed licensing action:

January 1990

6.

Important licensing considerations associated with refueling:

NONE

7.
8.
9.

8-l-7.R4 Number of Fuel Assemblies:

A)

Inc ore B)

In Spent Fuel Storage Present licensed spent fuel storage capacity:

Future spent fuel storage capacity:

Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:

193 224 11 70 1170 March 2003

Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Generating Station U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 March 15, 19 8 9 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specification, the original copy of the monthly operating reports for the month of February 1989 are being sent to you.

RH:sl Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Safety Related Maintenance Major Plant Modification Operating Summary Refueling Information

.Sincerely yours,

ff~

L. K. Miller General Manager -

Salem Operations cc:

Mr. William T. Russell Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Enclosures 8-1-7.R4 The Energy People 95-2189 (SM) 12-88

__j