Person / Time
Site: Salem 
Issue date: 01/31/1989
From: Miller L, Orticelle A, White P
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8902270396
Download: ML18093B462 (11)


Text

  • '

e e

AVF.RAGE DAILY UNIT PCWER LEVEL Completed by Art Orticelle Month January 1989 Day Average Daily Power Level (MWe-NET) 1 0

2 0

3 0

4 0

5 0

6 0

7 0

8 0

9 0

10 0

11 0

12 0

13 529 14 1029 15 1056 16 1084 Pg. 8.1-7 Rl Day Docket No.

Unit Name Date Telephone Extension Average Daily (MWe-NET) 17 1082 18 1087 19 1089 20 1109 21 1100 22 1090 23 1056 24 986 25 98 7 26 1063 27 1122 28 1042 29 10 65 30 1092 31 1070 50- 311 Salem # 2 2-10-89 609-935-6000 4451 Power Level

~

\\

OPERATING DATA REPORT Completed by Pell White 0perating Status

1.

Unit Name Salem No. 2

2.

Reporting Period Januar~ 1989

3.

Licensed Thermal Power (MWt) 3411

4.

Nameplate Rating (Gross MWe) 1170

5.

Design Electrical Rating (Net MWe) 1115

6.

Maximum Dependable Capacity(Gross MWe)i149

7.

Maximum Dependable Capacity (Net MWe) 1106

8.

If Changes Occur in Capacity Ratings (items Report, Give Reason Docket No.

Date Telephone Extension Notes 3 through 50-311

,2-10-89 935-6000 4451

7) since Last N/A
9.

Power Level to Which Restricted, if any (Net MWe)

N/A

~~~~~~~~~~~

10. Reasons for Restrictions, if any N/A

~~~~~~~~~~~~~~~~~~~~-

11. Hours in Reporting Period
12. No. of Hrs. Reactor was Critical
13. Reactor Reserve Shutdown Hrs.
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Elec. Energy Generated (MWH)
18. Net Elec. Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (using MDC Net)
22. Unit Capacity Factor (using DER Net)

This Month 744 539. 4 0

455.4 0

1512676.8 493180 479356

61. 2
61. 2 58.3 Year to Date 744 539.4 0

455.4 0

1512676.8 493180 479356

61. 2
61. 2 58.3 Cumulative 71353 38895.2 0

37578 0

66177773.8 38377480 36454661 52.7 52.7 46.2 57.8 57.8 45.8 38.8 38.3 28.7

23. Unit Forced Outage Rate
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

N/A

25. If shutdown at end of Report Period, Estimated Date of Startup:*

N/A 8-1-7.R2

Completed by No.

Date 0232 12-27-88 1

F: Forced S: Scheduled UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH JANUARY 1989 Docket No. 50-311 Unit Name Date Telephone Extension Salem No.2 Art Orticelle Method of Duration Shutting License Type Hours Reason Down Event 1

2 Reactor Report F

400.63 A

1 2 Reason A-Equipment Failure-explain B-Maintenance or Test C-Refue ling D-Regulatory Restriction E-Operator Training & Licensing Exam F-Administrative G-Operational Error-explain H-Other-explain System Component Code 4 Code 5 HD TURBIN 3 Method 1-Manua 1 2-Manual Scram.

3-Automatic Scram.

4-Continuation of Previous Outage 5-Load Reduction 9-0ther 2-10-89 609-935-6000 4451 Cause and Corrective Action to Prevent Recurrence GLAND SEAL TRUBINE 4 Exhibit G Instructions for Prepara-tion of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

SYSTEM 5 Exhibi,l Salem as Source

WO NO 870608017 871104104 880223068 880726104 880809048 880907091 PSE&G SALEM GENERATING STATION SAFETY RELATED WORK ORDER LOG SALEM UNIT 2 UNIT EQUIPMENT IDENTIFICATION 2

2C D/G TURBOCHARGER JW FAILURE DESCRIPTION:

DIESEL HAS JACKET WATER LEAK AT FLEX HOSE FLANGE.

REPLACE 0-RING.

2 24 SWP MOTOR FAILURE DESCRIPTION:

REMOVE AND SHIP TO KEYSTONE.

ELEC.

2 22 SW134 FAILURE DESCRIPTION:

CC RM COOLER VLV/NO RESPONSE/TROUBLESHOOT.

2 SPDS FAILURE DESCRIPTION:

FAILED POINTS/REPAIR.

2 2SJ31 FAILURE DESCRIPTION:

CAN'T VERIFY VALVE CLOSING/X-RAY VALVE AND REPORT.

2 HEATER TRACE FAILURE DESCRIPTION:

THE HEAT TRACE AROUND 2CV71 IS BURNED DAMAGED/

REWORK AS REQUIRED.

_j

WO NO 88100 4053 881126040 881212115 881215145 890106053 890116126 SALEM UNIT 2 UNIT EQUIPMENT IDENTIFICATION 2

2SWE4 FAILURE DESCRIPTION:

GLAND SEAL INJ. LINE LEAKS/REPLACE.

2 STEAM DUMP CONTROLER FAILURE DESCRIPTION:

SLUGGISH/TROUBLESHOOT.

2 21 24 MS901 FAILURE DESCRIPTION:

VLVS/STICKING/TROUBLESHOOT.

2 2LT52 7 FAILURE DESCRIPTION:

22 S/G IND/STICKING/TROUBLESHOOT.

2 2LT527 FAILURE DESCRIPTION:

22 S/G LVL/FAILED/INVESTIGATE AND CORRECT.

2 12XP3360 FAILURE DESCRIPTION:

CONT. HYD. ANAL. FAILED CALIBRATION.

THE P-PRESS VALUE OBTAINED FROM THE CALIBRATION WAS LOW.

SALEM UNIT 2 WO NO UNIT EQUIPMENT IDENTIFICATION 890120101 2

  1. 21 CHRG. PMP FAILURE DESCRIPTION:

SPEED INCREASER VALVE LEAKS/REPLACE VALVE.

MA."JOR PLANT MODIF4aTIONS

.. REPORT MONTH JANUARY 1989

  • OCR NO.

PRINCIPAL SYSTEM 2EC-16 80 Cranes 2EC-1984A Fire Protection Design Change Request DOCKET N.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

DESCRIPTION 50-311 Salem 2 February 10, 1989 P. White 609/339-4455 This design change revised the upper limit switch protection arrangement to follow the recommendations made by Westinghouse in Technical Bulletin NSTB-75-9, dated 9-15-75.

This design change installed high voltage ionization smoke detectors in the vicinity of the Control Room.

e MAJOR PLANT MODIFICATIONS REPORT MONTH -

JANUARY 1989 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

  • DCR SAFETY EVALUATION 10 CFR 50.59 50-272 Salem 2 February 10, 1989 P. White (609)339-4455 2EC-1680 This design change provided greater safety and reliability to the crane.

It is also part of the crane upgrading program to meet the guidelines of NUREG 0612.

This modification did not alter any plant process or discharge or affect the environmental impact of the plant.

No unreviewed safety or environmental questions are involved.

2EC-1984A The installation of the smoke detectors enhanced the stations ability to detect fire in the Control Room vicinity.

This modification did not alter any plant process or discharge or affect the environmental impact of the plant.

No unreviewed safety or environmental questions are involved.

DCR -

Design Change Request

I SALEM UNIT NO. 2 SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

UNIT NO. 2 JANUARY 1989 The Unit began the period shutdown for transformer replacement and testing and repair of the high pressure turbine gland seal casing.

On January 9, 1989, following completion of the repairs, the reactor was brought critical for main turbine balancing.

On January 13, 1989, the Unit achieved full power and continued to operate at that level until January 24, 1989 when power was reduced to 80% to comply with condenser inlet/outlet temperature restrictions imposed by the NJDEP discharge permit.

The Unit was restored to full power on January 25, 1989, and with the exception of some minor load reductions for waterbox cleaning, continued to operate at full power for the remainder of the period.

l

REFUELING INFORMATION DOCKET NO.: 50-311 UNIT NAME: Salem 2 COMPLETED BY:

P. White DATE: February 10, 1989 609/935-6000 TELEPHONE:

EXTENSION 4455 Month January 1989

1.

Refueling information has changed from last month:

2.
3.
4.

YES NO X

Scheduled date for next refueling:

January 6, 1990 Scheduled date for restart following refueling:

February 20,1990 A)

B)

Will Technical Specification changes or other license amendments be required?

YES NO NOT DETERMIN_E_D __

T_O-DATE X

Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO X

If no, when is it scheduled?

November 1989

5.

Scheduled date(s) for submitting proposed licensing action:

6.

Important licensing considerations associated with refueling:

7.
8.
9.

NONE Number of Fuel Assemblies:

A)

Inc ore B)

In Spent Fuel Storage Present licensed spent fuel storage capacity:

Future spent fuel storage capacity:

Date of last refueling that can be discharged to spent fuel pool assuming the present 193 308 1170 1170

[-..

e PS~G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Nuclear Department U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 February 11, 1989 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specification, the original copy of the monthly operating reports for the month of January 1989 are being sent to you.

RH:sl Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Safety Related Maintenance Major Plant Modification Operating Surmnary Refueling Information Sincerely yours,

\\_IL \\l.t,/ flV L. K. Miller General Manager -