ML18093B454

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Alternate Insp Sampling Plan for Unit
ML18093B454
Person / Time
Site: Salem 
Issue date: 02/09/1989
From:
Public Service Enterprise Group
To:
Shared Package
ML18093B452 List:
References
NUDOCS 8902150381
Download: ML18093B454 (2)


Text

ENCLOSURE 2 REVISED PAGES -

UNIT NO. 1 TECHNICAL SPECIFICATIONS

,_---::::.~.(-i:;-1-,;-(:->.-.. -* 1.*=-*.*::;.

..,-i*:::*c_i*=-..1

  • =-=-........::. *-* - *=**=*

PDR ADOCK 05000272 p

PDC

ALTERNATE INSPECTION SAMPLING PLAN FOR SALEM UNIT 1 The following alternate action may be t'aken in place of that required*by Technical Specification Table 4.4-2 when the results of the initial sample requires that an additional sample or samples must be inspected and the condition for which the added inspection is required is limited to Row 1 and/or Row 2 tubes.

When examination results fall into a C-2 or C-3 Supplemental Sample Category, pursuant to Technical Specification Table 4.4-2 as a result of Row 1 and/or Row 2 U-bend defective or degraded tubes, additional samples may be limited to Rows 1 and 2.

The results of the examination of the Row 1 and Row 2 tubes will be exempt from the additional sampling requirements of Technical Specification Table 4.4-2.

SALEM -

UNIT 1 3/4 4-13a