AVERAGE DAILY UNIT POWER LEVEL Completed by Art Orticelle Month DECEMBER 1988 Day Average Daily Power Level (MWe-NET) 1 127 2
267 3
419 4
791 5
1035 6
1045 7
1079 8
1088 9
85 5 10 0
11 0
12 0
13 0
14 0
15 0
16 0
Pg. 8.1-7 Rl 8901260009 881231 PDR ADOCK 05000311 R
PDC Day Docket No.
Unit Name Date Telephone Extension Average Daily (MWe-NET) 17 0
18 0
19 0
20 0
21 0
22 0
23 0
24 0
25 0
26 0
27 0
28 0
29 0
30 0
50-311 Salem # 2 1 89 609-935-6000 4451 Power Level
e OPERATING DATA REPORT 50-311 1-10-89 935-6000 Completed by Pell White Docket No.
Date Telephone Extension 4451 Operating Status Unit Name Salem No. 2 Notes Reporting Period December 1988 Licensed Thermal Power (MWt) 3411 Nameplate Rating (Gross MWe) 1170 Design Electrical Rating (Net MWe) 1115 Maximum Dependable Capacity(Gross MWe)ll49 Maximum Dependable Capacity (Net MWe) 1106 1
- 2.
3
- 4.
5.
6.
7.
8.
If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
~~~~~~~~~~~~~~~~~~~~~~--'-~~~~~~~
- 9.
Power Level to Which Restricted, if any (Net MWe)
N/A
~~~~~~~~~~~~
- 10. Reasons for Restrictions, if any N/A
~---'~~~~~~~~~~~~~~~~~~~~
This Month Year to Date Cumulative
- 11. Hours in Reporting Period 744 8784 70609
- 12. No. of Hrs. Reactor was Critical 213.3 5992.9 38355.8
- 13. Reactor Reserve Shutdown Hrs.
0 0
0
- 14. Hours Generator On-Line 207.1 5840.8 37122.6
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 539083 19014576 64665097
- 17. Gross Elec. Energy Generated (MWH) 169810 6254830 37884300
- 18. Net Elec. Energy Generated (MWH) 155508 5955927 35975305
- 19. Unit Service Factor 27.8 66.5 52.6
- 20. Unit Availability Factor 27.8 66.5 52.6
- 21. Unit Capacity Factor (using MDC Net) 18.9 61.3 46.0
- 22. Unit Capacity Factor (using DER Net) 18.7 60.8 45.7
- 23. Unit Forced Outage Rate 71.9 12.1 28.6
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
N/A
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
Unit returned to Service January 12, 1989.
8-l-7.R2
Completed by No.
Date 0223 09-03-88 0224 12-01-88 0231 12-09-88 0231 12-27-88 1
F: Forced S: Scheduled UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH DECEMBER 1988 Docket No. 50-311 Unit Name Date Telephone Extension
~~~~~~~~~
Salem No.2 Art Orticelle Type 1
s s
F F
Duration Hours 2138.4 4.35 419.18 112.0 Reason 2
c B
A A
Met hod of Shutting Down Reactor 4
4 1
1 License Event Report 2 Reason A-Equipment Failure-explain B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensing Exam F-Adm inist rat i ve G-Operational Error-explain H-Other-explain System Code 4 RC HA EG HD 3 Method 1-Manual Component Code 5 VESSEL TURBIN TRANSF TURBIN 2-Manual Scram.
3-Automatic Scram.
4-Continuation of Previous Outage 5-Load Reduction 9-0ther 1-10-89 609-935-6000 4451 Cause and Corrective Action to Prevent Recurrence NORMAL NUCLEAR REFUELING TURBINE OVERSPEED TEST MAIN TRANSFORMER GLAND SEAL SYSTEM TURBINE 4 Exhibit G Instructions for Prepara-tion of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161) 5 Exhibit 1 Salem as Source
WO NO 870713094 870908113 870909044 880907120 881025106 881117142 PSE&G SALEM GENERATING STATION SAFETY RELATED WORK ORDER LOG SALEM UNIT 2 UNIT EQUIPMENT IDENTIFICATION 2
23MS175 FAILURE DESCRIPTION:
23MS175 IS LEAKING THRU ITS SEATS BADLY.
REPLACE.
2 23MS12 9 FAILURE DESCRIPTION:
REPLACE MARK NO. D-3.
STEM IS SHEARED OFF AND MUST BE REPLACED.
2 24GB92 4 FAILURE DESCRIPTION:
REPLACE VALVE.
HAS A HOLE IN THE VALVE BODY.
2 2FA5838IB/23SG FAILURE DESCRIPTION:
BLWDN/FAULTY INDICATION/REPAIR AS REQUIRED.
2
- 2 FLOOD PUMP FAILURE DESCRIPTION:
THE SOLONOID VALVE ON THE OILER HAS BEEN DAMAGE.
REWORK.
2 2SJ90 FAILURE DESCRIPTION:
DIAPHRAGM LEAK/REPLACE/MK NO. M-164.
SALEM UNIT 2 WO NO UNIT EQUIPMENT IDENTIFICATION 881128142 2
2PS3 FAILURE DESCRIPTION:
PZR. SPRAY VLV./LEAKS THRU/REPAIR.
881208087 2
2Rl 7A FAILURE DESCRIPTION:
21 CC HEADER RAD MON/FAILED/REPAIR.
881209058 2
2 SFP STOP LOG SEAL FAILURE DESCRIPTION:
DEFECTIVE CHECK VLV/REPLACE.
881210068 2
DDC FAILURE DESCRIPTION:
GROUND ON 2B 125VDC BATTERY BUS/REPAIR.
881212099 2
2RCE6 FAILURE DESCRIPTION:
881221096 2
21 SER. WTR. PUMP FAILURE DESCRIPTION:
HIGH VIBRATION/TAKE READINGS.
TAKE A SET OF VIBRATION READINGS ON 21 SER. WTR. PUMP.
,MAJ.OR PLANT MODIF-TIONS REPORT MONTH DECEMBER 1988
- DCR NO.
PRINCIPAL SYSTEM 2EC-1767 PASS System 2EC-2011 Main Generator Design Change Request DOCKET N-UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
DESCRIPTION 50-311 January 10, 1989 P. White 609/339-4455 This design change installed sample lines from the discharge of the RHR pumps to the PASS liquid sampling system.
This design change installed the Hope Creek No. 2 Main Generator in place of the Salem No. 2 Main Generator.
e MAJOR PLANT MODIFICATIONS REPORT MONTH -
DECEMBER 1988 e
DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
- DCR SAFETY EVALUATION 10 CFR 50.59 50-272 Salem 2 January 10, 19 89 P. White (609)339-4455 2EC-1767 This installation was performed in accordance with the same design specifications as the installed sampling system sample lines.
Installation of this design change did not affect the ability to safely shutdown the Unit and enhances the availability of information for maintaining the plant safely shutdown after an accident.
This modification did not alter any plant process or discharge or affect the environmental impact of the plant.
No unreviewed safety or environmental questions are involved.
2EC-2011 The Salem Unit 2 Main generator was replaced due to serious damage experienced.
Installation of this modification did not affect the ability to safely shutdown the plant and no safety related plant systems were affected.
This modification did not alter any plant process or discharge or affect the environmental impact of the plant.
No unreviewed safety or environmental questions are involved.
DCR -
Design Change Request
SALEM UNIT NO. 2 SALEM GENERATING STATION MONTHLY OPERATING
SUMMARY
UNIT NO.
2 DECEMBER 1988 The Unit began the period operating at reduced power to heat soak the turbine in preparation for performance of the overspeed trip test.
On December 2, 1988, the Unit was synchronized following successful completion of the turbine overspeed trip test.
Power escalation continued during the week and full power was achieved on December 7, 1988.
The Unit continued to operate at essentially full power until December 9, 1988, when the Unit was shutdown following the detection of high combustible gas levels in the Phase III main transformer.
The Unit remained shutdown for the remainder of the period to replace the transformer and perform some additional maintenance on the main turbine.
REFUELING INFORMATION DOCKET NO.: 50-*311 UNIT NAME: Salem 2 COMPLETED BY:
P. White DATE: January 10, 1989 TELEPHONE: 609/935-6000 EXTENSION 4455 Month December 1988
- 1.
Refueling information has changed from last month:
- 2.
- 3.
- 4.
YES NO X
Scheduled date for next refueling:
January 6, 1990 Scheduled date for restart following refueling:
February 20,1990 A)
B)
Will Technical Specification changes or other license amendments be required?
YES NO NOT DETERMIN_E_D __
T_O-DATE X
Has the reload fuel design been reviewed by the Station Operating Review Committee?
YES NO X
If no, when is it scheduled?
November 1989
- 5.
Scheduled date(s) for submitting proposed licensing action:
- 6.
Important licensing considerations associated with refueling:
- 7.
- 8.
- 9.
NONE Number of Fuel Assemblies:
A)
Inc ore B)
In Spent Fuel Storage Present licensed spent fuel storage capacity:
Future spent fuel storage capacity:
Date of last refueling that can be discharged to spent fuel pool assuming the present 193 308 11 70 1170
PS~G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Nuclear Department U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir:
MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 January 11, 1989 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specification, the original copy of the monthly operating reports for the month of December 1988 are being sent to you.
RH:sl Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Safety Related Maintenance Major Plant Modification Operating Summary Refueling Information Sincerely yours, L. K. Miller General Manager -
Salem Operations cc:
Mr. William T. Russell Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Enclosures 8-l-7.R4 The Energy People 95-2168 (1 OOM) 12-84