ML18093B379

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-70 & DPR-75, Permitting Use of Vantage 5 Hybrid Fuel Design & Reduction of Flow Measurement Uncertainty Allowance Due to Recent Plant Mods.Fee Paid
ML18093B379
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/30/1988
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18093B380 List:
References
NLR-N88200, NUDOCS 8901100270
Download: ML18093B379 (3)


Text

--

Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4800 Vice President - Nuclear Operations

,. DEC 3 O 1988 NLR-N88200 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

REQUEST FOR AMENDMENT FACILITY OPERATING LICENSE DPR~70 AND DPR-75 SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 In accordance with the Atomic Energy Act of 1954, as amended, and the regulations thereunder, Public Service Electric and Gas company (PSE&G) hereby transmits a request for amendment of Facility Operating License DPR-70 and DPR-75 for Salem Generating station (SGS), Unit Nos. 1 and 2.

In accordance with the requirements of 10CFR170.21, a check in the amount of $150.00 is enclosed.

Pursuant to the requirements of 10CFR50.90(b) (1), a copy of this request has been sent to the State of New Jersey as indicated below.

The attached License Change Request is being submitted to permit the use of a new fuel design, Vantage 5 Hybrid (V5H), for the Salem Generating Station.

Additional changes are requested to reduce the flow measurement uncertainty allowance due to recent plant modifications and to eliminate the rod bow penalty based on new analysis methods applied during the V5H safety analysis. contains further discussion and justification for the proposed revisions. is a markup of the existing Technical Specifications to reflect the as requested version of the specifications. is a retype of the Technical Specifications to represent the proposed revision of these pages.

PSE&G currently plans to implement these changes during the next refueling outage for each Salem unit.

Because of the potential impact on operations and the amount of procedural changes necessary to implement the proposed changes, PSE&G requests that, upon issuance, the amendment not be effective until the 8th refueling outage for Unit 1 and the 5th refueling outage for Unit

2.

The currently scheduled start dates for the refueling outages are April 1989 for Unit 1 and January 1990 for Unit 2.

~b~ ~c,'\\)~~

r,---- ::::"?o 1100270 ::::::::i 2:30 II PDR ADOCK n~non?7?

P

---*~sc-I I

~' ~~

~~

Document Control Desk 2 -

DEO 3 o 1988 The submittal includes one (1) signed original, including affidavit, and thirty-seven (37) copies pursuant to 10 CFR5 0

  • 4 ( b) ( 2 ) ( ii)
  • Should you have any questions on the subject transmittal, please do not hesitate to contact us.

Attachment C

Mr. J. c. Stone Licensing Project Manager Ms. K. Halvey Gibson Senior Resident Inspector - Salem Mr. W. T. Russell, Administrator Region I Ms. J. Moon, Interim Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625

-1

STATE OF NEW JERSEY COUNTY OF SALEM

)

)

SS.

)

REF:

LCR 88-16 Stanley LaBruna, being duly sworn according to law deposes and says:

I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated December 30, 1988

, concerning the Salem Generating Station, Unit Nos. 1 and 2, are true to the best of my knowledge, information and belief.

..~

Subscrib~ and Sworn to~befoJe me this }d day of LJ'~, 1988

~u:/4J:

~Pullii{ic of New Jersey My Commission expires on LARAINE Y. BEARD Notary Public of New Jersey My Commission Expires May 1, 1991

--~~~~~~~~~~~~~~-