December 1~ 1988 Docket Nos. 50-272/311 FACILITY:

Salem Generating Station LICENSEE:

Public Service Electric and Gas Company

SUBJECT:

MEETING TO DISCUSS BIOLOGICAL ASSESSMENT OF SEA TURTLES OCCURRENCES AT SALEM GENERATING STATION On November.22, 1988 a meeting between the NRC staff and PSE&G was held in Rockville, MD to discuss the preparation of a biological assessment of sea turtle occurrences at Salem Generating Station. A copy of the agenda is attached.

The NRC staff concluded that the following items should be considered, in addition to those in the outline (copy attached):

1.

Operational aspects of the plants to minimize sea turtle occurrences

2.

Trash bar cleaning process

3.

PSE&G may want to cover all sea turtle species

4.

Cumulative effects of actions/activities The estimated time for preparation of the biological assessment was stated by

  • PSE&G to be 3 to 4 months.

However, before PSE&G can start approval from NRC is required.

The following were in attendance at the meeting:

Enclosure:

As stated NRC J.C. Stone, NRR E. L. Chan, OGC M.T. Masnik, NRR cc:

Licensee/Applicant Service List PSE&G J. Balletto J. Eggers

~

~on!t:ct Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation DISTRIBUTION Docket F'TI'e JS tone ACRS (10)

NRC PDR/LPDR PDI-2 Reading SVarga/BBoger WButler MThadani OGC EJordan BGrimes H. B. Clayton (Region I)

[SALEM MTG SUM]

(j3 t

PDI-2/PM PDI-2/PD JStone:tr WButler

~

\\\\ 13-C:0/88

! ) /jf/88

,---------::::-:::: :1. 0i5()~:-2~!--:=n:rr2(> 1------ ------...,

PDR ADOCK 05000272 P

PDC

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 December 1, 1988 Docket Nos. 50-272/311 FACILITY:

LICENSEE:

SUBJECT:

Salem Generating Station Public Service Electric and Gas Company MEETING TO DISCUSS BIOLOGICAL ASSESSMENT OF SEA TURTLES OCCURRENCES AT SALEM GENERATING STATION On November 22, 1988 a meeting between the NRC staff and PSE&G was held in Rockville, MD to discuss the preparation of a biological assessment of sea turtle occurrences at Salem Generating Station. A copy of the agenda is attached.

The NRC staff concluded that the following items should be considered, in addition to those in the outline (copy attached):

1.

Operational aspects of the plants to minimize sea turtle occurrences

2.

Trash bar cleaning process

3.

PSE&G may want to cover all sea turtle species

4.

Cu~ulative effects of actions/activities The estimated time for preparation of the biological assessment was stated by PSE&G to be 3 to 4 months.

However, before PSE&G can start approval from NRC is required.

The following were in attendance at the meeting:

Enclosure:

As stated NRC J.C. Stone, NRR E.L. Chan, OGC M.T. Masnik, NRR cc:

Licensee/Applicant Service List PSE&G J. Balletto J. Eggers James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor ~egulation

Mr. Steven E. Miltenberger Public Service Electric & Gas Company cc:

Mark J. Wetterhahn, Esquire Conner and Wetterhahn Suite 1050 1747 Pennsylvania Avenue, NW Washington, nc 20006 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. L. K. Miller General Manaqer - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Robert Traee, Mayor Lower Alloways Creek Township ft1unicipal Hall Hancocks Bridge, NJ OA038 Richard W. Borchardt, Resident Inspector Salem Nuclear Generating Station U.S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, NJ 0~038 Richard F. Engel Deputy Attorney General Department of Law and Public Safety CN-112 State House Annex -

Trenton, NJ 08625 Mr. David M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection State of New Jersey CN 411 Trenton, NJ 08625 Salem Nuclear Generating Statiol'1 Richard R. McGlynn, Commission Department of Public Utilities State of New Jersey 101 Commerce Street Newark, NJ 07102 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Bruce A. Preston, Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Morgan J. Morris, III General Manager - Operating License Atlantic Electric P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Delmarva Power & Light Company c/o Jack Urban General Mana~er, Fuel Supply 800 Kin9 Street P.O. Box 231 Wilmington, DE 19899

AGENDA REINITIATION OF SECTION 7 CONSULTATION ON SEA TURTLES PUBLIC SERVICE ELECTRIC AND GAS COMPANY SALEM GENERATING STATION MEETING WITH NUCLEAR REGULATORY COMMISSION ON NOVEMBER 22, 1988 I.

INTRODUCTION A.

Purpose of meeting B.

Historical background

c.

Overview of Salem Generating station II.

SITE SPECIFIC/REGIONAL SEA TURTLE DATA A.

Protected species B.

Salem Generating Station data

c.

Regional data III. FORMAL SECTION 7 CONSULTATION PROCESS IV.

OUTLINE V.

DISCUSSION

TENATIVE OUTLINE FOR "BIOLOGICAL ASSESSMENT" OF SEA TURTLE OCCURRENCES AND OPERATIONAL IMPACTS AT PUBLIC SERVICE ELECTRIC AND GAS COMPANY'S, SALEM GENERATING STATION 1.0

SUMMARY

AND COHCIDSIONS

2.0 INTRODUCTION

2.1 Regulatory Framework 2.2 Historical Background 3.0 SITE DESCRIPl'ION 3.1 Location 3.2 Hydrology 3.3 Salinity 3.4 Temperature 3.5 Bathymetry 4.0 SALEM AND HOPE CREEK GENERATING STATION DESCRIPTIONS 4.1 Salem Generating Station 4.1.1 Intake System 4.1.1.1 Circulating Water System 4.1.1.2 Service Water System 4.1.2 Discharge System 4.2 Hope Creek Generating Station 4.2.1 Intake System 4.2.1.1 Circulating Water System 4.2.1.2 Service Water System 4.2.2 Discharge System 5.0 SPECIES 5.1 General Sea Turtle Information 5.2 Loggerhead (Caretta caretta) 5.2.1 Description 5.2.2 Distribution 5.2.3 Foraging and Food Habits 5.2.4 Reproduction 5.2.5 Population Estimates 5.3 Kemps Ridley (Lepidochelys kempi) 5.3.1 Description 5.3.2 Distribution 5.3.3 Diet 5.3.4 Foraging and Food Habits 5.3.5 Population Estimates 5.4 Sea Turtles in the Delaware River Estuary 6.0 ONSITE INFORMATION

7.0 ASSESSMENT

OF POTENTIAL OPERATIONAL IMPACTS 7.1 Entrapment on Trash Racks 7.2 Thermal Effects 7.3 Other

8.0 CONCLUSION

S 9.0 LITERATURE CITED

---